Since the mid 1990s, the Christchurch inventory of substation buildings was seismically retrofitted as part of the Risk and Realities improvement programme. • The substation buildings were retrofitted using a system of simple and cost-effective steel elements. • The 2010/2011 Canterbury earthquakes caused significant immediate disruption to power distribution network in Christchurch. • It took a single day in September 2010 and ten days in February 2011 to restore power to 90% customers. Tostudytheseismicperformanceofmasonrysubstationbuildingsfromamulti-disciplinary perspective on structural,economic and social aspects.
The 2010-2011 Canterbury earthquake sequence, and the resulting extensive data sets on damaged buildings that have been collected, provide a unique opportunity to exercise and evaluate previously published seismic performance assessment procedures. This poster provides an overview of the authors’ methodology to perform evaluations with two such assessment procedures, namely the P-58 guidelines and the REDi Rating System. P-58, produced by the Federal Emergency Management Agency (FEMA) in the United States, aims to facilitate risk assessment and decision-making by quantifying earthquake ground shaking, structural demands, component damage and resulting consequences in a logical framework. The REDi framework, developed by the engineering firm ARUP, aids stakeholders in implementing resilience-based earthquake design. Preliminary results from the evaluations are presented. These have the potential to provide insights on the ability of the assessment procedures to predict impacts using “real-world” data. However, further work remains to critically analyse these results and to broaden the scope of buildings studied and of impacts predicted.