Gap Filler #1 Photograph 2
Images, UC QuakeStudies
A photograph of people watching a performance during Gap Filler's first project.
A photograph of people watching a performance during Gap Filler's first project.
A photograph of people watching a performance during Gap Filler's first project.
A photograph of people watching a performance during Gap Filler's first project.
A photograph of a performance that was part of Gap Filler's first project.
This paper presents the probabilistic seismic performance and loss assessment of an actual bridge– foundation–soil system, the Fitzgerald Avenue twin bridges in Christchurch, New Zealand. A two-dimensional finite element model of the longitudinal direction of the system is modelled using advanced soil and structural constitutive models. Ground motions at multiple levels of intensity are selected based on the seismic hazard deaggregation at the site. Based on rigorous examination of several deterministic analyses, engineering demand parameters (EDP’s), which capture the global and local demand, and consequent damage to the bridge and foundation are determined. A probabilistic seismic loss assessment of the structure considering both direct repair and loss of functionality consequences was performed to holistically assess the seismi risk of the system. It was found that the non-horizontal stratification of the soils, liquefaction, and soil–structure interaction had pronounced effects on the seismic demand distribution of the bridge components, of which the north abutment piles and central pier were critical in the systems seismic performance. The consequences due to loss of functionality of the bridge during repair were significantly larger than the direct repair costs, with over a 2% in 50 year probability of the total loss exceeding twice the book-value of the structure.
The 2010 Darfield earthquake is the largest earthquake on record to have occurred within 40 km of a major city and not cause any fatalities. In this paper the authors have reflected on their experiences in Christchurch following the earthquake with a view to what worked, what didn’t, and what lessons can be learned from this for the benefit of Australian earthquake preparedness. Owing to the fact that most of the observed building damage occurred in Unreinforced Masonry (URM) construction, this paper focuses in particular on the authors’ experience conducting rapid building damage assessment during the first 72 hours following the earthquake and more detailed examination of the performance of unreinforced masonry buildings with and without seismic retrofit interventions.
Questions to Ministers 1. AARON GILMORE to the Minister of Finance: What steps are the Government and the Earthquake Commission taking to streamline the Canterbury earthquake claims process? 2. Hon PHIL GOFF to the Prime Minister: Does he stand by his statement that "the vast majority" of people will be "better off" as a result of his tax switch on 1 October 2010? 3. KEVIN HAGUE to the Minister of Conservation: Does she agree with Forest and Bird that "many endangered species will meet a watery death, or be rudely shunted from their homes", if the Mōkihinui dam is given the green light? 4. Hon ANNETTE KING to the Minister for ACC: Is he satisfied with the performance of ACC? 5. NICKY WAGNER to the Minister for Economic Development: What steps will the Government take to aid the recovery of the Canterbury region from the recent major earthquake? 6. Hon DAVID CUNLIFFE to the Minister of Finance: What advice, if any, did Treasury receive from KordaMentha in relation to South Canterbury Finance's financial condition prior to approving the extension of the Crown Retail Deposit Guarantee Scheme, and did this advice question whether such an extension was appropriate? 7. COLIN KING to the Minister of Transport: What is the Government doing to address challenges in delivering supplies into the area affected by the Canterbury earthquake? 8. Hon RUTH DYSON to the Minister of Health: When will all the District Health Board Annual Plans for 2010/11 be publicly available? 9. JO GOODHEW to the Minister of Education: How were Canterbury schools affected by last Saturday's earthquake, and what is the current situation for schools in the region? 10. Hon DAVID PARKER to the Attorney-General: Is his objective under the new foreshore and seabed bill to settle the protracted controversy around foreshore and seabed? 11. AMY ADAMS to the Minister of Agriculture: What is the Government doing to support the rural Canterbury community through the earthquake recovery? 12. DARIEN FENTON to the Minister of Labour: Does she stand by all of the statements made on her behalf in response to question for oral answer No. 11 on 9 September 2010? Questions to Members 1. DARIEN FENTON to the Chairperson of the Transport and Industrial Relations Committee: How many submissions were received on the Employment Relations Amendment Bill (No. 2) as at 5pm Monday, 13 September 2010?