Research papers, University of Canterbury Library

Natural hazard reviews reveal increases in disaster impacts nowhere more pronounced than in coastal settlements. Despite efforts to enhance hazard resilience, the common trend remains to keep producing disaster prone places. This paper explicitly explores hazard versus multi-hazard concepts to illustrate how different conceptualizations can enhance or reduce settlement resilience. Understandings gained were combined with onthe-ground lessons from earthquake and flooding experiences to develop of a novel ‘first cut’ approach for analyzing key multi-hazard interconnections, and to evaluate resilience enhancing opportunities. Traditional disaster resilience efforts often consider different hazard types discretely. However, recent events in Christchurch, a New Zealand city that is part of the 100 Resilient Cities network, highlight the need to analyze the interrelated nature of different hazards, especially for enhancing lifelines system resilience. Our overview of the Christchurch case study demonstrates that seismic, hydrological, shallow-earth, and coastal hazards can be fundamentally interconnected, with catastrophic results where such interconnections go unrecognized. In response, we have begun to develop a simple approach for use by different stakeholders to support resilience planning, pre and post disaster, by: drawing attention to natural and built environment multi-hazard links in general; illustrating a ‘first cut’ tool for uncovering earthquake-flooding multi-hazard links in particular; and providing a basis for reviewing resilience strategy effectiveness in multi-hazard prone environments. This framework has particular application to tectonically active areas exposed to climate-change issues.

Articles, UC QuakeStudies

This report was the first report in the district series, and has a different format to later reports. It includes all natural hazards, not only earthquake hazards. It describes earthquake, flooding, meteorological, landslide and coastal hazards within Hurunui district and gives details of historic events. It includes district-scale (1:250,000) active fault and flood hazard maps. The report describes an earthquake scenario for a magnitude 6.9 earthquake near Cheviot, as well as flooding, meteorological, landslide, coastal erosion, storm surge, and tsunami scenarios.

Articles, UC QuakeStudies

This report was the first report in the district series, and has a different format to later reports. It includes all natural hazards, not only earthquake hazards. It describes earthquake, flooding, meteorological, landslide and coastal hazards within Hurunui district and gives details of historic events. It includes district-scale (1:250,000) active fault and flood hazard maps. The report describes an earthquake scenario for a magnitude 6.9 earthquake near Cheviot, as well as flooding, meteorological, landslide, coastal erosion, storm surge, and tsunami scenarios. See Object Overview for background and usage information.

Research papers, University of Canterbury Library

Christchurch City Council (Council) is undertaking the Land Drainage Recovery Programme in order to assess the effects of the earthquakes on flood risk to Christchurch. In the course of these investigations it has become better understood that floodplain management should be considered in a multi natural hazards context. Council have therefore engaged the Jacobs, Beca, University of Canterbury, and HR Wallingford project team to investigate the multihazards in eastern areas of Christchurch and develop flood management options which also consider other natural hazards in that context (i.e. how other hazards contribute to flooding both through temporal and spatial coincidence). The study has three stages:  Stage 1 Gap Analysis – assessment of information known, identification of gaps and studies required to fill the gaps.  Stage 2 Hazard Studies – a gap filling stage with the studies identified in Stage 1.  Stage 3 Collating, Optioneering and Reporting – development of options to manage flood risk. This present report is to document findings of Stage 1 and recommends the studies that should be completed for Stage 2. It has also been important to consider how Stage 3 would be delivered and the gaps are prioritised to provide for this. The level of information available and hazards to consider is extensive; requiring this report to be made up of five parts each identifying individual gaps. A process of identifying information for individual hazards in Christchurch has been undertaken and documented (Part 1) followed by assessing the spatial co-location (Part 2) and probabilistic presence of multi hazards using available information. Part 3 considers multi hazard presence both as a temporal coincidence (e.g. an earthquake and flood occurring at one time) and as a cascade sequence (e.g. earthquake followed by a flood at some point in the future). Council have already undertaken a number of options studies for managing flood risk and these are documented in Part 4. Finally Part 5 provides the Gap Analysis Summary and Recommendations to Council. The key findings of Stage 1 gap analysis are: - The spatial analysis showed eastern Christchurch has a large number of hazards present with only 20% of the study area not being affected by any of the hazards mapped. Over 20% of the study area is exposed to four or more hazards at the frequencies and data available. - The majority of the Residential Red Zone is strongly exposed to multiple hazards, with 86% of the area being exposed to 4 or more hazards, and 24% being exposed to 6 or more hazards. - A wide number of gaps are present; however, prioritisation needs to consider the level of benefit and risks associated with not undertaking the studies. In light of this 10 studies ranging in scale are recommended to be done for the project team to complete the present scope of Stage 3. - Stage 3 will need to consider a number of engineering options to address hazards and compare with policy options; however, Council have not established a consistent policy on managed retreat that can be applied for equal comparison; without which substantial assumptions are required. We recommend Council undertake a study to define a managed retreat framework as an option for the city. - In undertaking Stage 1 with floodplain management as the focal point in a multi hazards context we have identified that Stage 3 requires consideration of options in the context of economics, implementation and residual risk. Presently the scope of work will provide a level of definition for floodplain options; however, this will not be at equal levels of detail for other hazard management options. Therefore, we recommend Council considers undertaking other studies with those key hazards (e.g. Coastal Hazards) as a focal point and identifies the engineering options to address such hazards. Doing so will provide equal levels of information for Council to make an informed and defendable decision on which options are progressed following Stage 3.

Articles, UC QuakeStudies

This report assesses issues and options for preparing an earthquake hazard and risk assessment programme for Canterbury. It outlines investigation options and associated costs in order to better understand Canterbury's earthquake hazard and risk. Although earthquake hazard and risk information needs and investigation priorities within Canterbury have changed over the past 15 years, the majority of the report’s recommended components have been undertaken to some degree either by Environment Canterbury or other organisations. See Object Overview for background and usage information.

Articles, UC QuakeStudies

This study determined areas of different liquefaction susceptibility in Hurunui District based mainly on geological data, with some limited borehole strata interpretation. Geotechnical data was not analysed. This was the same method used in the earthquake hazard assessments for engineering lifelines in other districts in Canterbury. Hurunui District was the first district that a hazard assessment for engineering lifelines was undertaken for (in 2000) and it did not include a liquefaction susceptibility map like the other district earthquake hazard assessments did. There are no recommendations associated with this report. See Object Overview for background and usage information.

Articles, UC QuakeStudies

This study updated the 1999 Earthquake hazard and risk assessment study Stage 1 Part B: Probabilistic seismic hazard assessment and Earthquake scenarios for the Canterbury region, and historic earthquakes in Christchurch report. It incorporated new fault data, a new distributed seismicity model and new methods for estimating Modified Mercalli intensities. See Object Overview for background and usage information.

Articles, UC QuakeStudies

This study updated the 1999 Earthquake hazard and risk assessment study Stage 1 Part B: Probabilistic seismic hazard assessment and Earthquake scenarios for the Canterbury region, and historic earthquakes in Christchurch report. It incorporated new fault data, a new distributed seismicity model and new methods for estimating Modified Mercalli intensities. See Object Overview for background and usage information.

Images, UC QuakeStudies

A hazard board for a house being demolished in Richmond. Hazards listed are dust, noise, excavator, trucks, visitors and danger from equipment working. The photographer comments, "The end of 393 River Rd".