The focus of this paper is to identify potential benefits of community involvement in master planning in the post-earthquake recovery context in Christchurch; and to identify considerations for planners involved in the design of master planning processes that involve the community. Findings are based on the results of an information sharing event on these topics convened by The Habitat Project in December 2011, and a review of the relevant literature.
A runsheet created for the initial SCIRT and New Zealand Red Cross collaboration workshop.
The aim of this study is to explore the main contributors and obstacles to employee learning in the context of an alliance using the framework of a complex embedded multiple-case study. The two participant alliance partner organisations (APOs) are natural competitors that have joined to respond to urgent community needs of the city of Christchurch following the major earthquakes in September 2010 and February 2011. At the moment of the in-depth interviews, it had been about four years since those events occurred. There are continuous, unexpected circumstances that still require attention. However, the alliance has an expiry date, thus reinforcing the uncertain work environment. The main enablers found were participative, collaborative learning encouraged by leaders who embraced the alliance’s “learning organisational culture”. Employees generated innovations mostly in social interaction with others, while taking on responsibility for their learning by learning from mistakes. The main obstacle found is competition, as inhibitor of collaboratively sharing their knowledge out of fear of losing their competitiveness.
This article presents a subset of findings from a larger mixed methods CEISMIC1 funded study of twenty teachers’ earthquake experiences and post-earthquake adjustment eighteen months after a fatal earthquake struck Christchurch New Zealand, in the middle of a school day (Geonet Science, 2011; O’Toole & Friesen, 2016). This earthquake was a significant national and personal disaster with teachers’ emotional self-management as first responders being crucial to the students’ immediate safety (O’Toole & Friesen, 2016). At the beginning of their semi-structured interviews conducted eighteen months later, the teachers shared their earthquake stories (O’Toole & Friesen, 2016). They recalled the moment it struck in vivid detail, describing their experiences in terms of what they saw (destruction), heard (sonic boom, screaming children) and felt (fright and fear) as though they were back in that moment similar to flashbulb memory (Brown & Kulik, 1977). Their memories of the early aftermath were similarly vivid (Rubin & Kozin, 1984). This article focuses on how the mood meter (Brackett & Kremenitzer, 2011) was then used (with permission) to further explore the teachers’ perceived affect to enlighten their lived experiences.
A video of the open forum at the 2016 Seismics in the City Conference, facilitated by Brendon Burns, Communications Consultant at Brendon Burns and Associates.
The Stone Jug Fault (SJF) ruptured during the November 14th, 2016 (at 12:02 am), Mw 7.8 Kaikōura Earthquake which initiated ~40 km west-southwest of the study area, at a depth of approximately 15 km. Preliminary post-earthquake mapping indicated that the SJF connects the Conway-Charwell and Hundalee faults, which form continuous surface rupture, however, detailed study of the SJF had not been undertaken prior to this thesis due to its remote location and mountainous topography. The SJF is 19 km long, has an average strike of ~160° and generally carries approximately equal components of sinistral and reverse displacement. The primary fault trace is sigmoidal in shape with the northern and southern tips rotating in strike from NNW to NW, as the SJF approaches the Hope and Hundalee faults. It comprises several steps and bends and is associated with many (N=48) secondary faults, which are commonly near irregularities in the main fault geometry and in a distributed fault zone at the southern tip. The SJF is generally parallel to Torlesse basement bedding where it may utilise pre-existing zones of weakness. Horizontal, vertical and net displacements range up to 1.4 m, with displacement profiles along the primary trace showing two main maxima separated by a minima towards the middle and ends of the fault. Average net displacement along the primary trace is ~0.4m, with local changes in relative values of horizontal and vertical displacement at least partly controlled by fault strike. Two trenches excavated across the northern segment of the fault revealed displacement of mainly Holocene stratigraphy dated using radiocarbon (N=2) and OSL (N=4) samples. Five surface-rupturing paleoearthquakes displaying vertical displacements of <1 m occurred at: 11,000±1000, 7500±1000, 6500±1000, 3500±100 and 3 (2016 Kaikōura) years BP. These events produce an average slip rate since ~11 ka of 0.2-0.4 mm/yr and recurrence intervals of up to 5500 years with an average recurrence interval of 2750 yrs. Comparison of these results with unpublished trench data suggests that synchronous rupture of the Hundalee, Stone Jug, Conway-Charwell, and Humps faults at ~3500 yrs BP cannot be discounted and it is possible that multi-fault ruptures in north Canterbury are more common than previously thought.
The Foundation facilitates community engagement and communication through their website, providing service delivery, volunteer co-ordination and service to assist with the rebuild of Christchurch and Canterbury following the earthquakes of 2010 and 2011.
Blog of Julian, educational outreach facilitator at GNS Science. Includes information on GNS Science field trips; explanations of New Zealand geology; video clips; and sections on the Christchurch earthquakes, and New Zealand fossils.
A PDF copy of guidelines for qualitative research with older people in Christchurch. The focus groups were facilitated by Age Concern in February 2015, to inform the All Right? wellbeing campaign.
A copy of the plan developed in 2011 to facilitate a collaborative approach between all stakeholders and minimise the impact on the traffic network, because of the extensive repair works necessary to repair vertical and horizontal infrastructure.
A PDF copy of a summary of qualitative research findings on young people in Christchurch. The report resulted from focus groups facilitated by Age Concern in February 2015, to inform the All Right? wellbeing campaign.
A photograph of children and parents painting rocks for Rock on Eastside on the corner of Linwood Avenue and Aldwins Road. Rock on Eastside was an outdoor lounge and art space facilitated by Gap Filler and Youthtown. The paint was donated by Resene.
A video of an address by Brendon Burns, Facilitator at Brendon Burns & Associates MACRO Communications, at the 2014 Seismics and the City forum. This talk was part of the Building Communities section and explored the extent to which the new city core will be a 'government-flavoured doughnut', the key issues with this concept, and the possible solutions.
A photograph of students participating in a Youthtown workshop at Eastgate Mall. The students are painting rocks for the Rock on Eastside outdoor lounge and art space which is facilitated by Gap Filler and Youthtown. The rocks will be used to create artworks on the site on the corner of Aldwins Road and Linwood Avenue.
While it is well known that challenging and distressing events can negatively impact people’s psychological and physical state, increasingly researchers have investigated how challenging or stressful life circumstances can lead to the phenomenon of posttraumatic growth: positive psychological or life changes that can emerge from potentially traumatic events. Posttraumatic growth has been investigated primarily with people displaying varying levels of posttraumatic stress symptoms and other psychopathology due to theories suggesting that resilience would prohibit posttraumatic growth. Few studies have examined growth amongst resilient people. The current study examined posttraumatic growth in a sample of sixty psychologically healthy people who experienced the Canterbury earthquake sequence of 2010-2011. The current study is a follow-up study that used thematic analysis to explore: (1) Whether posttraumatic growth is evident nine years after the Canterbury earthquake sequence and approximately six years after baseline assessment; and (2) What themes may facilitate the posttraumatic growth process in psychologically healthy people. Data were collected using semi-structured interviews. Thematic analysis revealed four themes describing participants’ experiences of growth: New possibilities, reappraisal of life and priorities, positive changes in self-perception and closer more meaningful relationships. Themes describing posttraumatic growth provide evidence for research question one. Thematic analysis revealed three main themes and multiple subthemes that may facilitate the process of growth in psychologically healthy people: Hardship, optimistic positive appraisal and people helping people. Themes describing processes that may lead to growth provide evidence for research question two. Results of the current study provide insights about the experience of growth in psychologically healthy people and cognitive and psychosocial factors that may facilitate growth in resilient individuals.
A photograph of students from the University of Canterbury Student Volunteer Army at Rock on Eastside. Rock on Eastside was an outdoor lounge and art space facilitated by Gap Filler and Youthtown. The students helped other students from local high schools to build the site, which was on the corner of Aldwins Road and Linwood Avenue.
A photograph of students in Eastgate Mall with a trolley full of painted rocks. The students are participating in a workshop facilitated by Gap Filler and Youthtown where they painted these rocks. The rocks will be used to create Rock on Eastside, an outdoor lounge and art space on the corner of Aldwins Road and Linwood Avenue.
A recorded conversation about the arts in Christchurch, facilitated by Rosalee Jenkin (UC CEISMIC) and featuring Sophie Davis (UC Masters student and co-director of North Projects), Lara Strongman (Senior Curator at Christchurch Art Gallery), Gaby Montejo (visual art practitioner and teacher) and Wongi Wilson (street artist and professional graffiti artist). The podcast is the first in a series of conversations hosted by UC CEISMIC about Christchurch, five years on from the February 22 earthquake.
A photograph of a sofa made out of car tyres and a pallet at Rock on Eastside on the corner of Aldwins Road and Linwood Avenue. Rock on Eastside was a outdoor lounge and art space facilitated by Gap Filler and Youthtown. The sofa was made by students from the University of Canterbury Student Volunteer Army. Painted rocks have been placed in front of the sofa as decoration.
The Canterbury Earthquake Recovery Authority (CERA) and the Canterbury Lifeline Utilities Group have collaborated to assemble documented infra- structure-related learnings from the recent Canterbury earthquakes and other natural hazard events over the last 15 years (i.e. since publication of Risks and Realities). The project was led by the Centre for Advanced Engineering (CAE) and was undertaken to promote knowledge sharing by facilitating access to diverse documents on natural hazard learnings, a matter of ongoing relevance and very considerable current interest.
A video of a press conference with Earthquake Recovery Minister Gerry Brownlee and Mayor Lianne Dalziel. The conference was held to announce the implementation of the Accessible Transport Plan. Brownlee announces the introduction of a 30 km/h speed limit in the inner city zone, facilitating the use of bicycles and encouraging pedestrian movement within the centre city. Lianne also talks about how the plan allows for a clean, green, safe, and accessible city, reflecting the public's visions in the Share an Idea campaign.
On 22 February 2011, Canterbury and its largest city Christchurch experienced its second major earthquake within six months. The region is facing major economic and organisational challenges in the aftermath of these events. Approximately 25% of all buildings in the Christchurch CBD have been “red tagged” or deemed unsafe to enter. The New Zealand Treasury estimates that the combined cost of the February earthquake and the September earthquake is approximately NZ$15 billion[2]. This paper examines the national and regional economic climate prior to the event, discusses the immediate economic implications of this event, and the challenges and opportunities faced by organisations affected by this event. In order to facilitate recovery of the Christchurch area, organisations must adjust to a new norm; finding ways not only to continue functioning, but to grow in the months and years following these earthquakes. Some organisations relocated within days to areas that have been less affected by the earthquakes. Others are taking advantage of government subsidised aid packages to help retain their employees until they can make long-term decisions about the future of their organisation. This paper is framed as a “report from the field” in order to provide insight into the early recovery scenario as it applies to organisations affected by the February 2011 earthquake. It is intended both to inform and facilitate discussion about how organisations can and should pursue recovery in Canterbury, and how organisations can become more resilient in the face of the next crisis.
Cities need places that contribute to quality of life, places that support social interaction. Wellbeing, specifically, community wellbeing, is influenced by where people live, the quality of place is important and who they connect with socially. Social interaction and connection can come from the routine involvement with others, the behavioural acts of seeing and being with others. This research consisted of 38 interviews of residents of Christchurch, New Zealand, in the years following the 2010-12 earthquakes. Residents were asked about the place they lived and their interactions within their community. The aim was to examine the role of neighbourhood in contributing to local social connections and networks that contribute to living well. Specifically, it focused on the role and importance of social infrastructure in facilitating less formal social interactions in local neighbourhoods. It found that neighbourhood gathering places and bumping spaces can provide benefit for living well. Social infrastructure, like libraries, parks, primary schools, and pubs are some of the places of neighbourhood that contributed to how well people can encounter others for social interaction. In addition, unplanned interactions were facilitated by the existence of bumping places, such as street furniture. The wellbeing value of such spaces needs to be acknowledged and factored into planning decisions, and local rules and regulations need to allow the development of such spaces.
In the aftermath of the 22 February 2011 earthquake, the Natural Hazards Research Platform (NHRP) initiated a series of Short Term Recovery Projects (STRP) aimed at facilitating and supporting the recovery of Christchurch from the earthquake impacts. This report presents the outcomes of STRP 6: Impacts of Liquefaction on Pipe Networks, which focused on the impacts of liquefaction on the potable water and wastewater systems of Christchurch. The project was a collaborative effort of NHRP researchers with expertise in liquefaction, CCC personnel managing and designing the systems and a geotechnical practitioner with experience/expertise in Christchurch soils and seismic geotechnics.
A video of a panel discussion at the 2016 Seismics in the City Conference. The panel is titled, "Engaging: Generating Community Input and Feedback".Leanne Curtis of Breakthrough Services, Evan Smith, Programme Manager of Eastern Vision, and André Lovatt, CEO of the Arts Centre, respond to questions from the floor. Brendon Burns, of Brendon Burns and Associates, facilitates the discussion.The theme of the panel reads, "'Regenerate Christchurch must and will engage with the community around what will be done' (André Lovatt, Chair, Regenerate Christchurch). Learning from the past by tapping the wisdom of communities and applying the lessons to the future as we shape the new city."
The University of Canterbury Dept. of Chemistry has weathered the Canterbury Earthquake of September 4, 2010 very well due to a combination of good luck, good planning and dedicated effort. We owe a great deal to university Emergency Response Team and Facilities Management Personnel. The overall emergency preparedness of the university was tested to a degree far beyond anything else in its history and shown to be well up to scratch. A strong cooperative relationship between the pan-campus controlling body and the departmental response teams greatly facilitated our efforts. Information and assistance was provided promptly, as and when we needed it without unnecessary bureaucratic overheads. At the departmental level we are indebted to the technical staff who implemented the invaluable pre-quake mitigation measures and carried the majority of the post-quake clean-up workload. These people put aside their personal concerns and anxieties at a time when magnitude-5 aftershocks were still a regular occurrence.
The devastating magnitude M6.3 earthquake, that struck the city of Christchurch at 12:51pm on Tuesday 22 February 2011, caused widespread damage to the lifeline systems. Following the event, the Natural Hazard Research Platform (NHRP) of New Zealand funded a short-term project “Recovery of Lifelines” aiming to: 1) coordinate the provision of information to meet lifeline short-term needs; and to 2) facilitate the accessibility to lifelines of best practice engineering details, along with hazards and vulnerability information already available from the local and international scientific community. This paper aims to briefly summarise the management of the recovery process for the most affected lifelines systems, including the electric system, the road, gas, and the water and wastewater networks. Further than this, the paper intends to discuss successes and issues encountered by the “Recovery of Lifelines” NHRP project in supporting lifelines utilities.
The recent Christchurch earthquakes provide a unique opportunity to better understand the relationship between pre-disaster social fault-lines and post-disaster community fracture. As a resident of Christchurch, this paper presents some of my reflections on the social structures and systems, activities, attitudes and decisions that have helped different Canterbury ‘communities’ along their road to recovery, and highlights some issues that have, unfortunately, held us back. These reflections help answer the most crucial question asked of disaster scholarship: what can recovery agencies (including local authorities) do - both before and after disaster - to promote resilience and facilitate recovery. This paper – based on three different definitions of resilience - presents a thematic account of the social recovery landscape. I argue that ‘coping’ might best be associated with adaptive capacity, however ‘thriving’ or ‘bounce forward’ versions of resilience are a function of a community’s participative capacity.
The Canterbury earthquakes, which involved widespread damage in the February 2011 event and ongoing aftershocks near the Christchurch central business district (CBD), presented decision-makers with many recovery challenges. This paper identifies major government decisions, challenges, and lessons in the early recovery of Christchurch based on 23 key-informant interviews conducted 15 months after the February 2011 earthquake. It then focuses on one of the most important decisions – maintaining the cordon around the heavily damaged CBD – and investigates its impacts. The cordon displaced 50,000 central city jobs, raised questions about (and provided new opportunities for) the long-term viability of downtown, influenced the number and practice of building demolitions, and affected debris management; despite being associated with substantial losses, the cordon was commonly viewed as necessary, and provided some benefits in facilitating recovery. Management of the cordon poses important lessons for planning for catastrophic urban earthquakes around the world.
The 2010-2011 Canterbury earthquake sequence, and the resulting extensive data sets on damaged buildings that have been collected, provide a unique opportunity to exercise and evaluate previously published seismic performance assessment procedures. This poster provides an overview of the authors’ methodology to perform evaluations with two such assessment procedures, namely the P-58 guidelines and the REDi Rating System. P-58, produced by the Federal Emergency Management Agency (FEMA) in the United States, aims to facilitate risk assessment and decision-making by quantifying earthquake ground shaking, structural demands, component damage and resulting consequences in a logical framework. The REDi framework, developed by the engineering firm ARUP, aids stakeholders in implementing resilience-based earthquake design. Preliminary results from the evaluations are presented. These have the potential to provide insights on the ability of the assessment procedures to predict impacts using “real-world” data. However, further work remains to critically analyse these results and to broaden the scope of buildings studied and of impacts predicted.