SCIRT Webmap User Guide
Articles, UC QuakeStudies
A document which explains how to use the SCIRT GIS Viewer.
A document which explains how to use the SCIRT GIS Viewer.
A document which sets out the 12d standards at SCIRT.
A document created to summarise the initial SCIRT and New Zealand Red Cross collaboration workshop.
A document which summarises the outcomes of the SCIRT/New Zealand Red Cross Datasync project collaboration.
A document containing the flipcharts from the SCIRT and the New Zealand Red Cross design thinking workshop.
A document describing Downer's use of column seismic clamps to prevent additional damage to the Arch columns.
A plan which outlines how projects will be estimated to generate project Target Out-turn Costs (TOCs), and how these link into the programme TOC. The first version of this plan was produced on 29 July 2011.
A plan which outlines SCIRT's approach to Human Resource Management. The first version of this plan was produced on 30 August 2011.
A plan which aims to ensure the SCIRT programme complies with set specifications, design and industry quality standards. The first version of this plan was produced on 20 July 2011.
A document which describes the processes and procedures SCIRT designers and delivery teams had to follow to locate and protect utilities.
A document that describes a case study on how SCIRT has been designed to create an environment that delivers high performance.
A document that outlines how timely and accurate information relating to estimating, actual project costs, future commitments, and total forecast cost, will be managed and reported for each project phase in the programme.
Seismic retrofitting of unreinforced masonry buildings using posttensioning has been the topic of many recent experimental research projects. However, the performance of such retrofit designs in actual design level earthquakes has previously been poorly documented. In 1984 two stone masonry buildings within The Arts Centre of Christchurch received posttensioned seismic retrofits, which were subsequently subjected to design level seismic loads during the 2010/2011 Canterbury earthquake sequence. These 26 year old retrofits were part of a global scheme to strengthen and secure the historic building complex and were subject to considerable budgetary constraints. Given the limited resources available at the time of construction and the current degraded state of the steel posttension tendons, the posttensioned retrofits performed well in preventing major damage to the overall structure of the two buildings in the Canterbury earthquakes. When compared to other similar unretrofitted structures within The Arts Centre, it is demonstrated that the posttensioning significantly improved the in-plane and out-of-plane wall strength and the ability to limit residual wall displacements. The history of The Arts Centre buildings and the details of the Canterbury earthquakes is discussed, followed by examination of the performance of the posttension retrofits and the suitability of this technique for future retrofitting of other historic unreinforced masonry buildings. http://www.aees.org.au/downloads/conference-papers/