A photograph of demolition debris. The photograph is captioned by Paul Corliss, "TUC demolition".
A photograph of demolition debris. The photograph is captioned by Paul Corliss, "TUC demolition".
A photograph of demolition debris. The photograph is captioned by Paul Corliss, "TUC demolition".
A photograph of demolition debris. The photograph is captioned by Paul Corliss, "TUC demolition".
A photograph of demolition debris. The photograph is captioned by Paul Corliss, "TUC demolition".
A photograph of demolition debris. The photograph is captioned by Paul Corliss, "TUC demolition".
A photograph of demolition debris. The photograph is captioned by Paul Corliss, "TUC demolition".
A photograph captioned by BeckerFraserPhotos, "Demolition debris piled in front of the Brannigans building during the course of its demolition".
published as USB.The timeliness and quality of recovery activities are impacted by the organisation and human resourcing of the physical works. This research addresses the suitability of different resourcing strategies on post-disaster demolition and debris management programmes. This qualitative analysis primarily draws on five international case studies including 2010 Canterbury earthquake, 2009 L’Aquila earthquake, 2009 Samoan Tsunami, 2009 Victorian Bushfires and 2005 Hurricane Katrina. The implementation strategies are divided into two categories: collectively and individually facilitated works. The impacts of the implementation strategies chosen are assessed for all disaster waste management activities including demolition, waste collection, transportation, treatment and waste disposal. The impacts assessed include: timeliness, completeness of projects; and environmental, economic and social impacts. Generally, the case studies demonstrate that detritus waste removal and debris from major repair work is managed at an individual property level. Debris collection, demolition and disposal are generally and most effectively carried out as a collective activity. However, implementation strategies are affected by contextual factors (such as funding and legal constraints) and the nature of the disaster waste (degree of hazardous waste, geographical spread of waste etc.) and need to be designed accordingly. Community involvement in recovery activities such as demolition and debris removal is shown to contribute positively to psychosocial recovery.
One digital photograph showing the Cathedral of the Blessed Sacrament interior during demolition. The nave columns are still intact but debris lines the floor. Taken by photographer Helen McLeod in November 2020.
A digger sits beside rubble from a demolished building on the corner of Bealey Avenue and Springfield Road. The photographer comments, "Demolition debris".
Disaster recovery is significantly affected by funding availability. The timeliness and quality of recovery activities are not only impacted by the extent of the funding but also the mechanisms with which funding is prioritised, allocated and delivered. This research addresses the impact of funding mechanisms on the effectiveness and efficiency of post-disaster demolition and debris management programmes. A qualitative assessment of the impacts on recovery of different funding sources and mechanisms was carried out, using the 2010 Canterbury Earthquake as well as other recent international events as case studies. The impacts assessed include: timeliness, completeness, environmental, economic and social impacts. Of the case studies investigated, the Canterbury Earthquake was the only disaster response to rely solely on a privatised approach to insurance for debris management. Due to the low level of resident displacement and low level of hazard in the waste, this was a satisfactory approach, though not ideal. This approach has led to greater organisational complexity and delays. For many other events, the potential community wide impacts caused by the prolonged presence of disaster debris means that publicly funded and centrally facilitated programmes appear to be the most common and effective method of managing disaster waste.
Photograph captioned by BeckerFraserPhotos, "Cashel Mall".
Photograph captioned by BeckerFraserPhotos, "Hereford Street with a digger parked on the demolition debris from IBIS House (home of Alliance Francaise). Torrens House is to the right".
A photograph captioned by BeckerFraserPhotos, "Demolition of the Brannigans building. The container is being placed against the end of the building being demolished to protect the building below from falling debris".
Photograph captioned by BeckerFraserPhotos, "Mounds of demolition debris at the site of the Copthorne Durham on the corner of Durham and Kilmore Streets being sprayed with water to keep the dust down".
A digitally manipulated image of an excavator demolishing a house. The photographer comments, "My neighbour I thought was going to be one of the first to be rebuilt in the area after being damaged in the 22 February 2011 earthquake, but the builders have knocked it down and not returned yet".
The Harbourlight Theatre on London Street in Lyttelton. There is cracking along the side of the building and damage to the domes on top of the towers. Bracing has been placed at the top to limit further damage and to stop debris from falling on the road.
A photograph submitted by Gaynor James to the QuakeStories website. The description reads, "DTZ building going, 20 July 2011. A small crowd watches the demolition …There is an eerie silence- no excited buzz – people watching yet another part of their history turning into rubble. The wrecking ball, delicately positioned, drops and is followed by the cracking and rending of floor after floor and the debris tumbles down … It starts to clear and an extraordinary sight greets us. Hundreds and hundreds of sheets of paper drift down like giant confetti.".
Minister for Christchurch Recovery, Gerry Brownlee drives a huge tractor among debris that spells out 'Due Process' and says 'In order to get Christchurch back on its feet again we have to bring parliament to its knees. Context - The minister says he is happy with the speed of the work being done, as he wants tomake sure those involved in the rebuild portion of the recovery effort are well prepared. The bill establishes the Canterbury Earthquake Recovery Authority (Cera) and empowers it to lead reconstruction efforts in Christchurch. It gives Cera specific powers to get information from any source, to requisition and build on land and to carry out demolitions. It can also take over local authorities if they are not working effectively on recovery work. Quantity: 1 digital cartoon(s).
Copyright 2014. Earthquake Engineering Research Institute. This article may be downloaded for personal use only. Any other use requires prior permission of the Earthquake Engineering Research Institute.The Canterbury earthquakes, which involved widespread damage in the February 2011 event and ongoing aftershocks near the Christchurch central business district (CBD), presented decision-makers with many recovery challenges. This paper identifies major government decisions, challenges, and lessons in the early recovery of Christchurch based on 23 key-informant interviews conducted 15 months after the February 2011 earthquake. It then focuses on one of the most important decisions – maintaining the cordon around the heavily damaged CBD – and investigates its impacts. The cordon displaced 50,000 central city jobs, raised questions about (and provided new opportunities for) the long-term viability of downtown, influenced the number and practice of building demolitions, and affected debris management; despite being associated with substantial losses, the cordon was commonly viewed as necessary, and provided some benefits in facilitating recovery. Management of the cordon poses important lessons for planning for catastrophic urban earthquakes around the world.