Looking through the fence of a construction site where some ground foundation has been laid down. The heading on the sign on the fence says 'Caution. Construction Site. Authorised Personnel Only'.
Hawkins Construction site office on Creyke Road.
A photograph captioned by BeckerFraserPhotos, "A de-construction worker on the MFL House site".
A construction site where some ground foundation has been laid down. In the background is a damaged brick property.
Construction equipment parked on the former site of the Oxford on Avon, seen through the cordon fencing around Victoria Square.
A demolition site where loose cables hang from the roof. Construction workers and a digger can be seen behind the rubble.
A demolition site where loose cables hang from the roof. Construction workers and a digger can be seen behind the rubble.
A photograph of the construction of Illusions taking place on an empty site on Gloucester street. The installation is part of LUXCITY.
A photograph of the construction of Illusions taking place on an empty site on Gloucester street. The installation is part of LUXCITY.
A photograph of the construction of Illusions taking place on an empty site on Gloucester street. The installation is part of LUXCITY.
A photograph captioned by BeckerFraserPhotos, "The site of the demolished Piko Cafe, now operating just from the new piece on the left. Corner of Kilmore and Barbadoes Streets".
A photograph of the site of the Crowne Plaza Hotel on the corner of Kilmore and Durham Streets. The hotel has been demolished into large piles of rubble which two excavators are working to clear. A sign on the cordon fence indicates that the demolition is being carried out by Grant Mackay Demolition Co. and Leigh Construction.
Damage to the Cathedral of the Blessed Sacrament. Looking through the fence on to the side and front where shipping containers are being used to support the walls. On the cordon are signs that say 'Danger. Demolition in Progress. No Entry', and 'Monitored construction alarms. Site secured. No Unauthorised entry'.
Workers seen through a gap between wooden pallets in GapFiller's Pallet Pavillion. The photographer comments, "Though it looks strange and Photoshopped this is a straight shot through pallets painted blue. The Pallet Pavilion is built on the site of the demolished Crowne Plaza Hotel. It was built by volunteers, mainly students and construction engineers over 6 weeks. Here students are being given health and safety instructions before helping out on completing the temporary structure".
Earthquake Engineering is facing an extraordinarily challenging era, the ultimate target being set at increasingly higher levels by the demanding expectations of our modern society. The renewed challenge is to be able to provide low-cost, thus more widely affordable, high-seismic-performance structures capable of sustaining a design level earthquake with limited or negligible damage, minimum disruption of business (downtime) or, in more general terms, controllable socio-economical losses. The Canterbury earthquakes sequence in 2010-2011 has represented a tough reality check, confirming the current mismatch between societal expectations over the reality of seismic performance of modern buildings. In general, albeit with some unfortunate exceptions, modern multi-storey buildings performed as expected from a technical point of view, in particular when considering the intensity of the shaking (higher than new code design) they were subjected to. As per capacity design principles, plastic hinges formed in discrete regions, allowing the buildings to sway and stand and people to evacuate. Nevertheless, in many cases, these buildings were deemed too expensive to be repaired and were consequently demolished. Targeting life-safety is arguably not enough for our modern society, at least when dealing with new building construction. A paradigm shift towards damage-control design philosophy and technologies is urgently required. This paper and the associated presentation will discuss motivations, issues and, more importantly, cost-effective engineering solutions to design buildings capable of sustaining low-level of damage and thus limited business interruption after a design level earthquake. Focus will be given to the extensive research and developments in jointed ductile connections based upon controlled rocking & dissipating mechanisms for either reinforced concrete and, more recently, laminated timber structures. An overview of recent on-site applications of such systems, featuring some of the latest technical solutions developed in the laboratory and including proposals for the rebuild of Christchurch, will be provided as successful examples of practical implementation of performance-based seismic design theory and technology.