On the second anniversary of the 2010 earthquake Canterbury weeps. Quantity: 1 digital cartoon(s).
Two workers inspect fuses placed in an embankment during reinforcement work. The photographer comments, "This is the reinforcing of an embankment in the port of Lyttelton, which partly collapsed in the Christchurch earthquakes. They are using the same equipment as used for blowing up rock faces to mend them".
Trees being cut down on the bank of the Avon, near the Student Health Centre.
Trees being cut down on the bank of the Avon, near the Student Health Centre.
Trees being cut down on the bank of the Avon, near the Student Health Centre.
Slides from the presentation by Dr Marlene Villeneuve (Department of Geological Sciences) on "Towards Understanding Mechanisms of Failure in the Port Hills and Banks Peninsula".
The badly twisted Medway Street footbridge. The photographer comments, "The September 4th 2010 earthquake in Christchurch was so violent that the banks of the Avon River moved towards each other. This footbridge being metal had to twist sideways to release the pressure of being pushed from both river banks. It looked like it had been wrung out like a wet towel".
A video about people buying marmite from the Fresh Choice supermarket in Merivale. The supermarket has a secret stash of marmite which they have made available to customers in exchange for a bank note. The bank notes will be donated to the Christchurch Women's Refuge. Marmite went missing from supermarket shelves across the country after the 22 February 2011 earthquake damaged the factory in Christchurch.
A video of students at Banks Avenue School participating in the nationwide ShakeOut earthquake drill. The ShakeOut earthquake drill was held on 29 September 2012 to help people prepare for an earthquake. More than 1.3 million New Zealanders participated in 2012.
A digitally manipulated photograph of broken windows on Shadbolt House. The photographer comments, "This was close to the start of the demolition of the earthquake damaged Shadbolt House building in the Port of Lyttelton, New Zealand. In the bright sun the glass reflected the blue sky, but the broken windows only reflected the blackness of the interior of the empty broken building".
The 4 September 2010 Darfield and 22 February 2011 Christchurch earthquakes caused significant damage to Christchurch and surrounding suburbs as a result of the widespread liquefaction and lateral spreading that occurred. Ground surveying-based field investigations were conducted following these two events in order to measure permanent ground displacements in areas significantly affected by lateral spreading. Data was analysed with respect to the distribution of lateral spreading vs. distance from the waterway, and the failure patterns observed. Two types of failure distribution patterns were observed, a typical distributed pattern and an atypical block failure. Differences in lateral spreading measurements along adjacent banks of the Avon River in the area of Dallington were also examined. The spreading patterns between the adjacent banks varied with the respective river geometry and/or geotechnical conditions at the banks.
A digitally manipulated image of the word 'Lyttelton' made out of damaged bricks. The photographer comments, "This shows the courage and humour of the earthquake wrecked port of Lyttelton. There is lots of little things that make you smile that the locals and volunteers from around the area have created".
A video of Prime Minister John Key taking part in a tree planting ceremony on the banks of the Avon River in Christchurch. The trees were planted to symbolise the beginning of the rebuild of the Christchurch central city.
A photograph of volunteers working at the Fitzgerald Avenue Community Garden.
After a damning report into the CTV building, how many other Christchurch buildings had faults when the earthquake struck? Police investigate the tragic death of a five year old and when so many businesses are struggling, how did the country's big banks increase profits by a quarter?
A digitally manipulated photograph of the badly twisted Medway Street footbridge. The photographer comments, "This bridge over the Avon River in Christchurch, New Zealand has been left in place since the first major earthquake back in September 2010. Graffiti artists or taggers are still leaving their marks on it even though it is nearly twisted at 90 degrees at one point".
With the land dropping about 1metre to 1.4metres after the earthquakes, a few roads besides the Avon and Heathcote Rivers are flooded with very high tides. Extra stop banks (on right) erected after the quakes have helped, but the road is now well below high water level. New Brighton Road, just short of New Brighton. The Pages Road bridge may b...
A 22-year-old self-employed dairy farmer hopes his success through winning a new Maori farming award will inspire other young troubled Maori to follow their dreams; The Chairperson of Nelson's first Maori language immersion school says there's been a shift in attitude among members of the public - who now understand the school won't be exclusive; The former National MP Sandra Goudie is calling for Waikato ratepayers to oppose two Maori seats that the Regional Council is introducing at next year's election; Liquefaction from the Christchurch earthquakes may have unearthed four taonga on the banks of the Heathcote river.
The former National MP Sandra Goudie is calling for Waikato ratepayers to oppose two Maori seats that the Regional Council is introducing at next year's election; The Chairperson of Nelson's first Maori language immersion school says there's been a shift in attitude among members of the public - who now understand the school won't be exclusive; A 22-year-old self-employed dairy farmer hopes his success through winning a new Maori farming award will inspire other young troubled Maori to follow their dreams; Liquefaction from the Christchurch earthquakes may have unearthed four taonga on the banks of the Heathcote river.
Under the caption 'Best value for money?' is a football stadium displaying a red cross. From within a voice proclaims the advantages of having a combined covered stadium, hospital and blood bank. Under CERA, the Christchurch Central Development Unit had planned for a covered sports stadium, with attached facilities and shops as one of the key sites in the Christchurch rebuild after the 2010 and 2011 earthquakes. The 'blood bin' refers to the recent practice in rugby of sending off players with flesh wounds. There were also plans for a new hospital. Quantity: 1 digital cartoon(s).
In this edition: The report into the collapse of the CTV building in the Christchurch earthquake a year ago is released, the Maori Council lodges claims with the Waitangi tribunal that could throw a spanner in the works of the Government's asset sales programme, the Earthquake Recovery Minister nearing the end of his tether with the Christchurch City Council, more from the Pike River Royal Commission, Radio Live could face a potential one hundred thousand dollar fine under the electoral act over John Key's hour long radio show in the run up to the 2011 election, banks lift their collective profits for the second half of 2011 by 25 percent and the winners are announced at the 2012 Halberg Awards.
DAVID SHEARER to the Prime Minister: Does he believe that Hon John Banks has behaved in a manner that “upholds, and is seen to uphold the highest ethical standards” as required by the Cabinet Manual? BARBARA STEWART to the Prime Minister: Did Mr Banks explain to the Prime Minister’s Chief of Staff that he would use “obfuscation” in his dealings with the media over the “anonymous” donations from Kim Dotcom? MAGGIE BARRY to the Minister of Finance: How does the Government intend to strengthen the Public Finance Act 1989 in the Budget this month? Hon DAVID PARKER to the Minister of Finance: In the most recent World Economic Outlook published by the IMF in April 2012, which of the 34 advanced economies listed is forecast to have a worse current account deficit (as a percentage of GDP) than New Zealand in 2013? METIRIA TUREI to the Prime Minister: Does he stand by all the answers he gave to Oral Question No 4 yesterday? KANWALJIT SINGH BAKSHI to the Minister for Economic Development: What action is the Government taking to improve co-ordination of the business growth agenda? Hon PHIL GOFF to the Minister of Foreign Affairs: What damage, if any, has been done to staff confidence and retention by the change proposals for his Ministry announced on 23 February 2012, and does he intend to announce on 10 May 2012 a reversal of many of the proposals? SIMON O'CONNOR to the Minister of Labour: What steps is the Government taking to improve workplace health and safety? GARETH HUGHES to the Minister of Conservation: Does her proposed extension of the Marine Mammal Sanctuary for Maui’s dolphins allow the use of set nets, drift nets, and trawl nets within the sanctuary? IAN McKELVIE to the Minister of Corrections: What reports has she received about trade training within prisons? Hon LIANNE DALZIEL to the Minister for Canterbury Earthquake Recovery: Has he required that all his Ministers involved in the Canterbury earthquake recovery read the briefing paper dated 10 May 2011 prepared by Chief Science Advisor, Professor Sir Peter Gluckman, into the psychosocial consequences of the Canterbury earthquakes; if not, why not? NIKKI KAYE to the Minister of Education: What evidence has she seen of excellent achievement in scholarship exams?
A review of the week's news, including... Maori across the country accepting a challenge set by the Maori King to battle the Government over water rights, the Government says Labour's new education policies are flawed, expensive and unnecessary while it's being accused of exploiting the Christchurch earthquakes to force through sweeping changes to schools in the city, Tuhoe is to get 170-million dollars in compensation and more control over Te Urewera National Park in its settlement with the Crown for historical grievances, hundreds of angry and stunned paper mill workers in Kawerau are in limbo over how many will lose their jobs with Norske Skog announcing its halving production, the shotputter Valerie Adams will receive her gold medal in a public ceremony in Auckland on Wednesday, details from of the police investigation into John Bank's mayoral campaign donations have been made public, a man who helped his chronically ill wife commit suicide has broken down in tears after being discharged without conviction and Invercargill has rolled out the red carpet in style, hosting the world premiere of New Zealand's latest feature film.
DAVID SHEARER to the Prime Minister: Does he stand by all his statements in relation to Kim Dotcom and the inquiry into the actions of the Government Communications Security Bureau? METIRIA TUREI to the Minister for Social Development: Does she have confidence that the Ministry of Social Development can keep private information it holds confidential? KATRINA SHANKS to the Minister of Finance: What are the main features of the Government's plan to build a more competitive economy based on more savings, higher exports and less debt? JACINDA ARDERN to the Minister for Social Development: Has the Ministry of Social Development competently managed the private information in its charge? Peseta SAM LOTU-IIGA to the Minister for Social Development: What children will the White Paper for Vulnerable Children be targeting? CHRIS HIPKINS to the Minister of Education: What specific criteria were used to determine whether a school in Christchurch was identified for restoration, consolidation or rejuvenation? Dr RUSSEL NORMAN to the Minister responsible for the GCSB: What were the dates of the three cases that the Government Communications Security Bureau audit highlighted, because they could not assure him "that the legal position is totally clear", as referred to in his statement of 3 October 2012? Rt Hon WINSTON PETERS to the Prime Minister: Does he stand by his answer to my Question for Written Answer 3326 (2012)? Hon LIANNE DALZIEL to the Minister of Civil Defence: Why did he reject the independent Civil Defence Emergency Management earthquake review's recommendation, which was made in response to the finding that duplication of control was "not only inefficient but put people and property at risk", and that "the same situation could arise in a number of different parts of New Zealand"? MIKE SABIN to the Minister of Veterans' Affairs: What is the Government doing to improve the support and recognition given to veterans? GRANT ROBERTSON to the Prime Minister: Does he have confidence in Hon John Banks; if so, why? NICKY WAGNER to the Minister responsible for the Earthquake Commission: What is the objective of the Government review of the EQC?
BRENDAN HORAN to the Minister for State Owned Enterprises: Is he satisfied with all aspects of the KiwiRail Turnaround Plan? GRANT ROBERTSON to the Prime Minister: Does he stand by his statement in relation to Hon John Banks, “The law may be very loose as I’ve said before, and the law may well need reforming and that’s something we’ll consider in due course but I’m comfortable with what he’s done”? JOHN HAYES to the Minister of Finance: What reports has he received on the international economic situation and its impact on New Zealand? Hon DAVID PARKER to the Minister of Finance: Does he stand by his statement regarding migration to Australia “What’s the point of standing in the airport crying about it?”; if so, are the numbers of people leaving New Zealand from the regions being replaced by people moving into the regions from elsewhere in New Zealand or overseas? Hon TARIANA TURIA to the Minister of Finance: Did the Minister of Māori Affairs discuss with him how the Crown would meet its Treaty obligation with respect to the Mixed Ownership Model? EUGENIE SAGE to the Minister for Canterbury Earthquake Recovery: What advice, if any, has he received on the potential sale of Christchurch City Council assets to help pay for the rebuild of Christchurch? JONATHAN YOUNG to the Minister of Energy and Resources: What reports has he received on renewable electricity generation in New Zealand? JACINDA ARDERN to the Minister for Social Development: What was discussed at the three meetings she has had with Australian company Taylor Fry, known for its actuary services to the insurance industry? Dr PAUL HUTCHISON to the Minister of Health: What investments are planned for improving health facilities in Wairoa? Hon CLAYTON COSGROVE to the Minister for State Owned Enterprises: Does he agree with the Minister of Finance that “The asset sales programme remains on track”? LOUISE UPSTON to the Minister of Labour: What advice has she received regarding the implementation of the new adventure activities regulations? Hon ANNETTE KING to the Minister of Housing: What recent reports has he received on housing in the Aranui area of Christchurch?
This thesis is concerned with modelling rockfall parameters associated with cliff collapse debris and the resultant “ramp” that formed following the high peak ground acceleration (PGA) events of 22 February 2011 and 13 June 2011. The Christchurch suburb of Redcliffs, located at the base of the Port Hills on the northern side of Banks Peninsula, New Zealand, is comprised of Miocene-age volcanics with valley-floor infilling marine sediments. The area is dominated by basaltic lava flows of the Mt Pleasant Formation, which is a suite of rocks forming part of the Lyttelton Volcanic Group that were erupted 11.0-10.0Ma. Fresh exposure enabled the identification of a basaltic ignimbrite unit at the study site overlying an orange tuff unit that forms a marker horizon spanning the length of the field area. Prior to this thesis, basaltic ignimbrite on Banks Peninsula has not been recorded, so descriptions and interpretations of this unit are the first presented. Mapping of the cliff face by remote observation, and analysis of hand samples collected from the base of the debris slopes, has identified a very strong (>200MPa), columnar-jointed, welded unit, and a very weak (<5MPa), massive, so-called brecciated unit that together represent the end-member components of the basaltic ignimbrite. Geochemical analysis shows the welded unit is picrite basalt, and the brecciated unit is hawaiite, making both clearly distinguishable from the underlying trachyandesite tuff. RocFall™ 4.0 was used to model future rockfalls at Redcliffs. RocFall™ is a two-dimensional (2D), hybrid, probabilistic modelling programme for which topographical profile data is used to generate slope profiles. GNS Science collected the data used for slope profile input in March 2011. An initial sensitivity analysis proved the Terrestrial Laser Scan (TLS)-derived slope to be too detailed to show any results when the slope roughness parameter was tested. A simplified slope profile enabled slope roughness to be varied, however the resulting model did not correlate with field observations as well. By using slope profile data from March 2011, modelled rockfall behaviour has been calibrated with observed rockfall runout at Redcliffs in the 13 June 2011 event to create a more accurate rockfall model. The rockfall model was developed on a single slope profile (Section E), with the chosen model then applied to four other section lines (A-D) to test the accuracy of the model, and to assess future rockfall runout across a wider area. Results from Section Lines A, B, and E correlate very well with field observations, with <=5% runout exceeding the modelled slope, and maximum bounce height at the toe of the slope <=1m. This is considered to lie within observed limits given the expectation that talus slopes will act as a ramp on which modelled rocks travel further downslope. Section Lines C and D produced higher runout percentage values than the other three section lines (23% and 85% exceeding the base of the slope, respectively). Section D also has a much higher maximum bounce height at the toe of the slope (~8.0m above the slope compared to <=1.0m for the other four sections). Results from modelling of all sections shows the significance of the ratio between total cliff height (H) and horizontal slope distance (x), and of maximum drop height to the top of the talus (H*) and horizontal slope distance (x). H/x can be applied to the horizontal to vertical ratio (H:V) as used commonly to identify potential slope instability. Using the maximum value from modelling at Redcliffs, the future runout limit can be identified by applying a 1.4H:1V ratio to the remainder of the cliff face. Additionally, the H*/x parameter shows that when H*/x >=0.6, the percentage of rock runout passing the toe of the slope will exceed 5%. When H*/x >=0.75, the maximum bounce height at the toe of the slope can be far greater than when H*/x is below this threshold. Both of these parameters can be easily obtained, and can contribute valuable guideline data to inform future land-use planning decisions. This thesis project has demonstrated the applicability of a 2D probabilistic-based model (RocFall™ 4.0) to evaluate rockfall runout on the talus slope (or ramp) at the base of ~35-70m high cliff with a basaltic ignimbrite source. Limitations of the modelling programme have been identified, in particular difficulties with adjusting modelled roughness of the slope profile and the inability to consider fragmentation. The runout profile using RocFall™ has been successfully calibrated against actual profiles and some anomalous results have been identified.
DAVID SHEARER to the Prime Minister: Does he stand by his statement "I am deeply concerned about every child in New Zealand who is in poverty"; if so, why has the number of children living in material hardship grown under his watch? TODD McCLAY to the Minister of Finance: What measures has the Government taken to support vulnerable New Zealanders through the aftermath of the domestic recession and global financial crisis? METIRIA TUREI to the Prime Minister: When he said "we don't want to see any New Zealand child suffer … children don't get to make choices, they're often the victim of circumstance" does that mean he will take tangible steps to ensure children don't suffer because of circumstances beyond their control? Rt Hon WINSTON PETERS to the Prime Minister: Does he have confidence in the Minister of Immigration? Hon DAVID PARKER to the Minister of Finance: Compared to 2012, does the Reserve Bank forecast the New Zealand dollar (as measured by the Trade Weighted Index) to strengthen or weaken in the next two years, and does he believe this will make New Zealand exporters more competitive or less competitive? DAVID BENNETT to the Minister for Economic Development: How is the Government encouraging the sustainable use of natural resources to support jobs and grow the economy? Hon MARYAN STREET to the Minister of Health: Is he satisfied with the state of children's health in New Zealand; if not, why not? COLIN KING to the Minister of Energy and Resources: What recent announcement has he made about Block Offer 2012? EUGENIE SAGE to the Minister for the Environment: Does she agree with the New Zealand Freshwater Sciences Society in relation to freshwater that "failure to act with decisiveness and urgency risks further environmental degradation and erosion of our international environmental reputation"; if not, why not? Hon LIANNE DALZIEL to the Minister for Building and Construction: How quickly will he respond to the building performance, assessment and construction recommendations of the Royal Commission of Inquiry into Building Failure caused by the Canterbury Earthquakes? NICKY WAGNER to the Minister for Building and Construction: What is the Government doing in response to the Canterbury Earthquakes Royal Commission's full report? CLARE CURRAN to the Prime Minister: Does he stand by all his statements?
Following the 22 February 2011, MW 6.2 earthquake located on a fault beneath the Port Hills of Christchurch, fissuring of up to several hundred metres in length was observed in the loess and loess-colluvium of foot-slope positions in north-facing valleys of the Port Hills. The fissuring was observed in all major valleys, occurred at similar low altitudes, showing a contour-parallel orientation and often accompanied by both lateral compression/extension features and spring formation in the valley floor below. Fissuring locations studied in depth included Bowenvale Valley, Hillsborough Valley, Huntlywood Terrace–Lucas Lane, Bridle Path Road, and Maffeys Road–La Costa Lane. Investigations into loess soil, its properties and mannerisms, as well as international examples of its failure were undertaken, including study of the Loess Plateau of China, the Teton Dam, and palaeo-fissuring on Banks Peninsula. These investigations lead to the conclusion that loess has the propensity to fail, often due to the infiltration of water, the presence of which can lead to its instantaneous disaggregation. Literature study and laboratory analysis of Port Hills loess concluded that is has the ability to be stable in steep, sub-vertical escarpments, and often has a sub-vertically jointed internal structure and has a peak shear strength when dry. Values for cohesion, c (kPa) and the internal friction angle, ϕ (degrees) of Port Hills loess were established. The c values for the 40 Rapaki Road, 3 Glenview Terrace loess samples were 13.4 kPa and 19.7 kPa, respectively. The corresponding ϕ values were thought unusually high, at 42.0° and 43.4°.The analysed loess behaved very plastically, with little or no peak strength visible in the plots as the test went almost directly to residual strength. A geophysics resistivity survey showed an area of low resistivity which likely corresponds to a zone of saturated clayey loess/loess colluvium, indicating a high water table in the area. This is consistent with the appearances of local springs which are located towards the northern end of each distinct section of fissure trace and chemical analysis shows that they are sourced from the Port Hills volcanics. Port Hills fissuring may be sub-divided into three categories, Category A, Category B, and Category C, each characterised by distinctive features of the fissures. Category A includes fissures which display evidence of, spring formation, tunnel-gullying, and lateral spreading-like behaviour or quasi-toppling. These fissures are several metres down-slope of the loess-bedrock interface, and are in valleys containing a loess-colluvium fill. Category B fissures are in wider valleys than those in Category A, and the valleys contain estuarine silty sediments which liquefied during the earthquake. Category C fissures occurred at higher elevations than the fissures in the preceding categories, being almost coincident with bedrock outcropping. It is believed that the mechanism responsible for causing the fissuring is a complex combination of three mechanisms: the trampoline effect, bedrock fracturing, and lateral spreading. These three mechanisms can be applied in varying degrees to each of the fissuring sites in categories A, B, and C, in order to provide explanation for the observations made at each. Toppling failure can describe the soil movement as a consequence of the a three causative mechanisms, and provides insight into the movement of the loess. Intra-loess water coursing and tunnel gullying is thought to have encouraged and exacerbated the fissuring, while not being the driving force per se. Incipient landsliding is considered to be the least likely of the possible fissuring interpretations.