Search

found 45 results

Images, UC QuakeStudies

A photograph of a model city at the Rebuild Central office on Lichfield Street. The model was created by members of the public as part of the Christchurch City Council's Transitional City consultation project.

Images, UC QuakeStudies

A photograph of a model city at the Rebuild Central office on Lichfield Street. The model was created by members of the public as part of the Christchurch City Council's Transitional City consultation project.

Videos, UC QuakeStudies

A video montage of LUXCITY, a city of lights that existed for one night on Saturday 20 October 2012. LUXCITY was the main event of FESTA 2012 and included 16 interactive installations, designed and fabricated by architecture and design students from across New Zealand. The film depicts the construction and set up, through to the public event on Saturday night.

Images, UC QuakeStudies

A poster created by Empowered Christchurch to advertise their submission to the CERA Draft Transition Recovery Plan on social media.The poster reads, "Submission, CERA Draft Transition Recovery Plan. Future Insurability. In an article in the New Zealand Herald of 5 November 2014, the CEO of IAG refers to cooperation with the NZ Government on a strategic intent in 2011 to avoid depopulation of Christchurch. Now that the ICNZ has signalled its intention to withdraw from high-risk areas and the CCC also plans to redefine the boundaries of the city so as to exclude properties below the Mean High Water Springs. We ask whether a 'recovery' involves abandoning people once the insurance and bank sectors have managed a retreat? We need a city that is driven by the people that live in it, and enabled by a bureaucracy that accepts and mitigates risks, rather than transferring them to the most vulnerable of its residents".