David discusses the latest news in North Canterbury including updates on the earthquake damaged Glen Alton bridge funding, calls for a local driving licence test route in Kaikoura, reactions from local mayors on the government's bid to get young people off a jobseekers benefit, and there have been reports of dog attacks on little penguins along Kaikoura's coastline. David Hill is a Local Democracy Reporter with North Canterbury News, based in Rangiora.
Effective management of waste and debris generated by a disaster event is vital to ensure rapid and efficient response and recovery that supports disaster risk reduction (DRR). Disaster waste refers to any stream of debris that is created from a natural disaster that impacts the environment, infrastructure, and property. This waste can be problematic due to extensive volumes, environmental contamination and pollution, public health risks, and the disruption of response and recovery efforts. Due to the complexities in dealing with these diverse and voluminous materials, having disaster waste management (DWM) planning in place pre-event is crucial. In particular, coordinated, interagency plans that have been informed by estimates of waste volumes and types are vital to ensure management facilities, personnel, and recovery resources do not become overwhelmed. Globally, a priority when formulating DWM plans is the robust estimation of disaster waste stream types and volumes. This is a relatively under-researched area, despite the growing risk of natural disasters and increasingly inadequate waste management facilities. In Aotearoa New Zealand, a nation-wide DWM planning tool has been proposed for local government use, and waste amounts from events such as the Christchurch Earthquakes have been estimated. However, there has been little work undertaken to estimate waste types and volumes with a region-specific, multi-hazard focus, which is required to facilitate detailed regional DWM planning. This research provides estimates of potential disaster waste volumes and types in the Waitaha-Canterbury region of the South Island (Te Waipounamu) for three key hazard scenarios: a M8.0 Alpine Fault earthquake with a south-to-north rupture pattern, a far-sourced tsunami using a maximum credible event model for a Peru-sourced event, and major flooding using geospatial datasets taken from available local government modelling. Conducted in partnership with Environment Canterbury and Canterbury CDEM, this estimation work informed stakeholder engagement through multi-agency workshops at the district level. This research was comprised of two key parts. The first was enhancing and extending a disaster waste estimation model used in Wellington and applying it to the Canterbury region to quantify waste volumes and types. The second part was using this model and its estimates to inform engagement with stakeholders in multi-agency, district-level workshops in Kaikōura, Hurunui, and Waimakariri. In these workshops, the waste estimates were used to catalyse discussion around potential issues associated with the management of disaster waste. Regionally, model estimates showed that the earthquake scenario would generate the highest total volume of disaster waste (1.94 million m³), compared to the tsunami scenario (1.89 million m³) and the flood scenario (173,900 m³). Flood waste estimates are likely underrepresented due to limited flood modelling coverage, but still provide a valuable comparison. Whilst waste estimates differ significantly between districts, waste volumes were shown to be not solely dependent on building/population density. The district-level workshops showed that DWM challenges revolved around logistical constraints, public concerns, governance complexities, and environmental issues. Future work should further enhance this estimation model and apply it to other regions of Aotearoa New Zealand, to help develop a set of cohesive DWM plans for each region. The waste estimation model could also be adapted and applied internationally. The findings from this research provide a foundation for advancing DWM planning and stakeholder engagement in the Waitaha-Canterbury region. By offering region-specific waste estimates across multiple hazard scenarios, this work supports district councils and emergency managers in developing informed, proactive strategies for disaster preparedness and response. The insights gained from district-level workshops highlight key challenges that must be addressed in future planning. These outcomes contribute to a broader research agenda for DWM in Aotearoa New Zealand, and offer a framework adaptable to international contexts.
The North Canterbury and Marlborough regions of Aotearoa | New Zealand were severely impacted by almost 30,000 landslides triggered during the 2016 Kaikōura Earthquake. Of these landslides approximately 200 dammed rivers. In the study area near Waiau, rupture of The Humps and Leader faults (and associated ground motions) initiated at least 42 co-seismic landslides. The Leader Landslide is the largest of these landslides, with an area of approximately 600,000 m2 and a volume of 6-8 million m3. The landslide buried approximately 980 m of active Leader River bed length and dammed the river. The dam produced four lakes, with two remaining today and two having been breached by partial landslide collapse and knickpoint migration in the year following the earthquake. As of 2025, the landslide dam has not been completely breached and Lake Rebekah remains. The Leader Landslide dam presents a unique opportunity to chart the evolution of the active riverbed pre- and post-earthquake, for up to 2 km downstream of Lake Rebekah. The river’s evolutionary timeline was observed using LiDAR, satellite aerial imagery, and drone surveys from 2001 to 2024 to develop maps and topographic difference models. Key timeframes for riverbed change events were also constrained with information and dated photography gathered from previous communications with the landowners at Woodchester Station, where the landslide is located. Finally, Schmidt Hammer testing of the Pliocene-Miocene Greta Siltstone Formation was conducted to investigate the role of bedrock strength on the rate of riverbed erosion. I present the history of evolution of the Leader River, pre- and post-earthquake, and consider factors impacting riverbed morphology changes. Despite the stability of Lake Rebekah, these data show that the position and morphology of the Leader River has changed significantly in response to the landslide, with the formation of two knickpoint waterfalls up to 14 m-high, four waterbodies, and diversion of the river around the landslide toe. Evolution of the river is characterised by longer periods of stasis (e.g., months to years) punctuated by rapid changes in riverbed morphology (e.g., hours to weeks) associated with incision and aggradation. In particular, the knickpoints migrated upstream at variable spatial and temporal rates. Factors controlling the rates of processes include; rain-storm events, partial lake outburst flooding, spatial changes in Pliocene-Miocene siltstone bed induration and landowner intervention to stabilise the landslide dam. An overarching conclusion of this thesis is that landforms can develop rapidly (i.e., hours to weeks) and in the absence of historical accounts, could be interpreted to have formed over hundreds to thousands of years.