Industrial steel storage pallet racking systems are used extensively worldwide to store goods. Forty percent of all goods are stored on storage racks at some time during their manufactureto- consumption life. In 2017, goods worth USD 16.5 billion were carried on cold-formed steel racking systems in seismically active regions worldwide. Historically, these racks are particularly vulnerable to collapse in severe earthquakes. In the 2010/2011 Christchurch earthquakes, around NZD 100 million of pallet racking stored goods were lost, with much greater associated economic losses due to disruptions to the national supply chain. A novel component, the friction slipper baseplate, has been designed and developed to very significantly improve the seismic performance of a selective pallet racking system in both the cross-aisle and the down-aisle directions. This thesis documents the whole progress of the development of the friction slipper baseplate from the design concept development to experimental verification and incorporation into the seismic design procedure for selective pallet racking systems. The test results on the component joint tests, full-scale pull-over and snap-back tests and fullscale shaking table tests of a steel storage racking system are presented. The extensive experimental observations show that the friction slipper baseplate exhibits the best seismic performance in both the cross-aisle and the down-aisle directions compared with all the other base-connections tested. It protects the rack frame and concrete floor from damage, reduces the risk of overturning in the cross-aisle direction, and minimises the damage at beam-end connectors in the down-aisle direction, without sustaining damage to the connection itself. Moreover, this high level of seismic performance can be delivered by a simple and costeffective baseplate with almost no additional cost. The significantly reduced internal force and frame acceleration response enable the more cost-effective and safer design of the pallet racking system with minimal extra cost for the baseplate. The friction slipper baseplate also provides enhanced protection to the column base from operational impact damage compared with other seismic resisting and standard baseplates.
An often overlooked aspect of urban housing development is the composition of the space between buildings; the streetscape. The pressures of suppressing suburban sprawl have seen housing developments respond by increasing residential density within more centralised city sites. Medium-density housing typologies are often used as urban infill in response to the challenge of accommodating an increasing population. A by-product of these renewed areas is the creation of new open space which serves as the fundamental public space for sociability to develop in communities. Street space should emphasise this public expression by encouraging social exchange and interaction. As a result, a neighbourhood owes its liveliness (or lack thereof) to its streets. The issue of density when applied to the urban housing landscape encompasses two major components: the occupancy of both the private realms, constituting the residential built form, and the public spaces that adjoins them, the streets. STREETSCAPE: dialogues of street + house. Continual transition between the realms of public and private (building and street space) enact active edges, giving way to public stimulation; the opportunity for experiencing other people. The advent of seeing and hearing other people in connection with daily comings and goings encourages social events to evolve, enhancing the notion of neighbourly conduct. Within New Zealand, and specifically in Christchurch as considered here, the compositions of current streetscapes lack the demeanor to really encourage and facilitate the idea of neighbourly interaction and public expression. Here lies the potential for new street design to significantly heighten the interplay of human activity. In response, this research project operates under the notion that the street spaces of urban residential areas are largely underutilised. This lack is particularly evident in the street. Street design should strive to produce spaces which stimulate the public life of residents. There exists a need to reassert eminence of the street as a space for vibrant neighbourhood life. This thesis employs design as a tool for researching and will involve using numerous concept generators to trigger the production of multiple scenarios. These scenarios are to explore the ways in which the streetscapes within medium-density urban communities could respond in the event of (re) development.
Deborah Nation recalls how it was in the Sound Archives and Radio New Zealand offices in Christchurch on the day of the February earthquake. The building on the corner of Durham and Chester Street West has been condemned. Please be aware that the first sounds of this report may be upsetting, especially to listenners who experienced the earthquake.
Professor Jacky Bowring has been a consultant to both the Ministry for Culture and Heritage, and CERA for the process for the EQ Memorial, as well as for the Christchurch City Council from the early days of the Recovery Plan, when the section on 'Remembering the Earthquakes' was developed. It was one of those times when her areas of research and passion suddenly became very real.
It was so nearly lost. As the Christ Church Anglican Cathedral is being rebuilt, historian Edmund Bohan is releasing a history of the distinctive Gothic building. It shows it was controversial even before work started on designing it, let alone building in. From the laying of the foundations to the official opening, it took 40 years, after squabbles over pretty much every aspect of its construction - not to mention the huge problems raising the money to build it in the City Centre. In Heart of the City: The Story of Christchurch's Controversial Cathedral, Edmund is critical of the former Anglican Bishop Victoria Matthews' determination to demolish the badly-damaged cathedral after the Canterbury earthquakes, to replace it with a modern church. And he tells Lynn Freeman he's very much looking forward to seeing the Cathedral restored to its former glory after a lengthy and pricey rebuild. But first he sets the scene. Back in the 1860s, there was controversy over where the cathedral should go, its design, whether it should be in stone or timber - even if there should be a cathedral built at all! Heart of the City: The Story of Christchurch's Controversial Cathedral, by Edmund Bohan is published by Quentin Wilson Publishing.
A three dimensional approximately half scale experimental subassemblage is currently being tested at the University of Canterbury to investigate the effect of precast-prestressed floor units, which do not span past the internal columns, on the seismic performance of reinforced concrete moment resisting frames. This paper reports the preliminary results from the test, with the focus on elongation within the plastic hinges and strength enhancement in the frames. The preliminary results have shown that elongation between the external and internal plastic hinges varies by more than two fold. With the addition of the prestressed floor units, the strength of the moment resisting frame used in the test was found to be 25% higher than the current code specified value. In other situations, particularly where there are more than 2 bays in a moment resisting frame, greater strength enhancement may be expected. Any underestimation of beam strength is undesirable as it may result in the development of nonductile failure modes in a major earthquake.
The housing and mortgage market in Christchurch experienced significant changes since the 2011 earthquake, especially after the reconstruction of the city. The increasing speed of Christchurch average house price exceed the average house price of the whole country, as well as the number of new dwellings. By this regard, this study surveyed the households in Christchurch to analyze the effect of the earthquake on housing and mortgage market. This includes factors such as housing price, interest rate, government policy and socioeconomic factors in terms of age, gender, educational attainment, income, marital status and family life cycle. Logistic regression model is used to analyze the data. The study provides an overview of the housing market and mortgage market in Christchurch. The logistic regression, results show changes on sensitivity between the socio-economic factors and house purchase, as well as mortgage borrowing pre- and post-earthquake. The result indicates that the earthquake in Christchurch has affected households’ decision on house purchase and mortgage borrowing.
Photograph captioned by Fairfax, "Aftershock damage at the Cathedral Square site of The Press caused by the Boxing Day quakes. Damage caused by the aftershock to the wall of the old wages building. Pencil lines mark the latest movement".
Three time capsules recovered from the ruins of Christchurch in the days following the February earthquake have been opened. Two came from the John Robert Godley statue plinth in front of the Christchurch Cathedral, while the other came from the old civic building on Manchester Street.
Ever wondered what happened to some of the damaged timber from the Lyttelton wharves after the Canterbury earthquakes? The tough ironbark they were made from was too good not to be rescued and Oxford's Steve Evans was just the man for the job, as Mark Leishman discovered.
A photograph of a member of the Diabetes Centre team descending the stairs of the Diabetes Centre on Hagley Avenue. The hand rail to the left has been removed and placed on the stairs while the wall behind it is repainted.
A photograph of members of the Diabetes Centre team standing on the stairwell of the Diabetes Centre on Hagley Avenue. The hand rail to the left has been removed and placed on the stairs while the wall behind it is repainted.
A view down Victoria Street from the corner of Victoria Street and Bealey Avenue. On the left is the damaged Knox Church, where the brick has crumbled but the wooden roof frame is still intact. In front is a tent where the Army is guarding the cordon from.
During 2010 and 2011, a series of major earthquakes caused widespread damage in the city of Christchurch, New Zealand. The magnitude 6.3 quake in February 2011 caused 185 fatalities. In the ensuing months, the government progressively zoned residential land in Christchurch on the basis of its suitability for future occupation (considering damage from these quakes and future earthquake risk). Over 6,000 homes were placed in the ‘red-zone’, meaning that property owners were forced to sell their land to the Crown. This study analysed patterns of residential mobility amongst thirty-one red-zone households from the suburb of Southshore, Christchurch. Drawing on interviews and surveys, the research traced their experience from the zoning announcement until they had moved to a new residence. The research distinguished between short (before the zoning announcement) and long term (post the red zone ‘deadline’) forms of household relocation. The majority of households in the study were highly resistant to short term movement. Amongst those which did relocate before the zoning decision, the desire to maintain a valued social connection with a person outside of the earthquake environment was often an important factor. Some households also moved out of perceived necessity (e.g. due to lack of power or water). In terms of long-term relocation, concepts of affordability and safety were much more highly valued by the sample when purchasing post-quake property. This resulted in a distinct patterning of post-quake housing location choices. Perceived control over the moving process, relationship with government organisations and insurance companies, and time spent in the red-zone before moving all heavily influenced participants’ disaster experience. Contrary to previous studies, households in this study recorded higher levels of subjective well-being after relocating. The study proposed a typology of movers in the Christchurch post-disaster environment. Four mobility behaviours, or types, are identified: the Committed Stayers (CSs), the Environment Re-Creators (ERCs), the Resigned Acceptors (RAs), and the Opportunistic Movers (OMs). The CSs were defined by their immobility rather than their relocation aspirations, whilst the ERCs attempted to recreate or retain aspects of Southshore through their mobility. The RAs expressed a form of apathy towards the post-quake environment, whereas, on the other hand, the OMs moved relative to pre-earthquake plans, or opportunities that arose from the earthquake itself. Possibilities for further research include examining household adaptability to new residential environments and tracking further mobility patterns in the years following relocation from the red- zone.
The Avon-Heathcote Estuary, located in Christchurch, New Zealand, experienced coseismic deformation as a result of the February 22nd 2011 Christchurch Earthquake. The deformation is reflected as subsidence in the northern area and uplift in the southern area of the Estuary, in addition to sand volcanoes which forced up sediment throughout the floor of the Estuary altering estuary bed height and tidal flow. The first part of the research involved quantifying the change in the modern benthic foraminifera distribution as a result of the coseismic deformation caused by the February 22nd 2011 earthquake. By analysing the taxa present immediately post deformation and then the taxa present 2 years post deformation a comparison of the benthic foraminifera distribution can be made of the pre and post deformation. Both the northern and the southern areas of the Estuary were sampled to establish whether foraminifera faunas migrated landward or seaward as a result of subsidence and uplift experienced in different areas. There was no statistical change in overall species distribution in the two year time period since the coseismic deformation occurred, however, there were some noticeable changes in foraminifera distribution at BSNS-Z3 showing a landward migration of taxa. The changes that were predicted to occur as a result of the deformation of the Estuary are taking longer than expected to show up in the foraminiferal record and a longer time period is needed to establish these changes. The second stage involved establishing the modern distribution of foraminifera at Settlers Reserve in the southern area of the Avon-Heathcote Estuary by detailed sampling along a 160 m transect. Foraminifera are sensitive to environmental parameters, tidal height, grainsize, pH and salinity were recorded to evaluate the effect these parameters have on distribution. Bray-Curtis two-way cluster analysis was primarily used to assess the distribution pattern of foraminifera. The modern foraminifera distribution is comparable to that of the modern day New Zealand brackish-water benthic foraminifera distribution and includes species not yet found in other studies of the Avon-Heathcote Estuary. Differences in sampling techniques and the restricted intertidal marshland area where the transect samples were collected account for some of the differences seen between this model and past foraminifera studies. xiii The final stage involved sampling a 2.20 m core collected from Settlers Reserve and using the modern foraminiferal distribution to establish a foraminiferal history of Settlers Reserve. As foraminifera are sensitive to tidal height they may record past coseismic deformation events and the core was used to ascertain whether record of past coseismic deformation is preserved in Settlers Reserve sediments. Sampling the core for foraminifera, grainsize, trace metals and carbon material helped to build a story of estuary development. Using the modern foraminiferal distribution and the tidal height information collected, a down core model of past tidal heights was established to determine past rates of change. Foraminifera are not well preserved throughout the core, however, a sudden relative rise in sea level is recorded between 0.25 m and 0.85 m. Using trace metal and isotope analysis to develop an age profile, this sea level rise is interpreted to record coseismic subsidence associated with a palaeoseismic event in the early 1900’s. Overall, although the Avon-Heathcote Estuary experienced clear coseismic deformation as a result of the 22nd of February 2011 earthquake, modern changes in foraminiferal distribution cannot yet be tracked, however, past seismic deformation is identified in a core. The modern transect describes the foraminifera distribution which identifies species that have not been identified in the Avon-Heathcote Estuary before. This thesis enhances the current knowledge of the Avon-Heathcote Estuary and is a baseline for future studies.
Environmental assessment in New Zealand is governed by the provisions of the Resource Management Act (RMA) 1991. The Act requires persons wishing to undertake certain activities to apply for resource consent from their local or regional council - a procedure termed the Resource Consent Process. The key component of a resource consent application is an Assessment of Environmental Effects (AEE) report; a statement of the environmental effects of a proposed activity. Problems arise when environmental assessments are complicated by uncertain and abnormal circumstances such as natural hazards. Natural hazards (including earthquakes, floods, tsunami, and coastal erosion) can be catastrophic to an environment. If hazards are not avoided or successfully mitigated, they can result in serious consequences to proposed development and to the environment which the proposal relates. The aim of this study is to assess the adequacy of the resource consent process (as outlined in the Resource Management Act 1991) for dealing with proposed development affected by natural hazards. This study reviews the context of the resource consent process for dealing with natural hazards to identify potential issues in the assessment process. Guidance criteria for assessing natural hazards (termed Natural Hazard Assessment) are developed to evaluate against two resource consent applications affected by natural hazards. The findings of the consent process review and case study evaluation are discussed to determine the adequacy of the consent process for dealing with natural hazards. From the review of the consent process it was evident that the process has a number of problems for accommodating natural hazards into the assessment. Although many important traits are provided for in the process, such traits are not always reflected in environmental assessments. Evaluation of two resource consent applications against the process of Natural Hazard Assessment (NHA) showed that these consent applications did not adequately detail key information relating to natural hazards. Many problems evident in these applications were not amended by the Consent Authorities in the review process and subsequently consent was granted to information-deficient applications. Problematic issues identified in this study include: • A distinct lack of guidance (legal or otherwise) for the applicant and Consent Authority regarding the boundaries of inclusion of an effect; • Deficiencies in planning documents are reflected in AEE reports, the review of the consent application and in the end-decision; • Under-utilisation of "experts" throughout the consent process; • Minimal identification and account for the degree of uncertainty throughout the consent process; • Resource consents are being granted even though information in consent applications, and the means for assessing the information is deficient. These issues reflect that decisions are not being made based on all elements involved in a potential hazard. Subsequently, the resource consent process is not adequate for dealing with all aspects of natural hazards. The Natural Hazard Assessment process provides educated assessment criteria to assess development affected by natural hazards. By accounting for the problems evident in the consent process, the introduction of a three-tier identification, risk and vulnerability assessment, and evaluation process to account for uncertainties, Natural Hazard Assessment provides a platform for a thorough assessment of natural hazards. The application of the principles of Natural Hazard Assessment to the consent applications affected by natural hazards showed that many key issues were not covered in the assessment under the consent process. The nature of a natural event is that one may not occur in a given region over many lifetimes, however they will occur at some stage and planning and environmental assessment needs to provide for the associated hazards. Implementation of Natural Hazard Assessment is needed to help provide answers for the problems experienced in the resource consent process. Natural Hazard Assessment would allow decision-makers to make informed judgements on the situation at hand, leading to better planning and land-use options. Change to current practice is needed, as following the current path of environmental assessment will be the hazard in the end.
The assessment of damage and remaining capacity after an earthquake is an immediate measure to determine whether a reinforced concrete (RC) building is usable and safe for occupants. The recent Christchurch earthquake (22 February 2011) caused a uniquely severe level of structural damage to modern buildings, resulting in extensive damage to the building stock. About 60% of damaged multistorey concrete buildings (3 storeys and up) were demolished after the earthquake, and the cost of reconstruction amounted to 40 billion NZD. The aftermath disclosed issues of great complexities regarding the future of the RC buildings damaged by the earthquakes. This highlighted the importance of post-event decision-making, as the outcome will allow the appropriate course of action—demolition, repair or acceptance of the existing building—to be considered. To adopt the proper strategy, accurate assessment of the residual capacity and the level of damage is required. This doctoral dissertation aims to assess the damage and remaining capacity at constituent material and member level (i.e., concrete material and beams) through a systematic approach in an attempt to address part of an existing gap in the available literature. Since the residual capacity of RC members is not unique and depends on previously applied loading history, post-event residual capacity in this study was assessed in terms of fraction of fatigue life (i.e., the number of cycles required to failure). This research comprises three main parts: (1) residual capacity and damage assessment at material level (i.e., concrete), (2) post-yield bond deterioration and damage assessment at the interface of steel and concrete, and, finally, (3) residual capacity and damage assessment at member level (i.e., RC beam). The first part of this research focused on damage assessment and the remaining capacity of concrete from a material point of view. It aimed to employ appropriate and reliable durability-based testing and image-detection techniques to quantify deterioration in the mechanical properties of concrete on the basis that stress-induced damage occurred in the microstructural system of the concrete material. To this end, in the first phase, a feasibility study was conducted in which a combination of oxygen permeability, electrical resistivity and porosity tests were assessed to determine if they were robust and reliable enough to reveal damage which occurred in the microstructural system of concrete. The results, in terms of change in permeability, electrical resistivity and porosity features of disk samples taken from the middle third of damaged concrete cylinders (200 mm × 100 mm) monotonically pre-loaded to 50%, 70%, 90% and 95% of the ultimate strength (f′c), showed the permeability test is a reliable tool to identify the degree of damage, due to its high sensitivity to the load-induced microcracking. In parallel, to determine the residual capacity, the companion damaged concrete cylinders already loaded to the same level of compressive strength were reloaded up to failure. Comparing the stress–strain relationship of damaged concrete with intact material, it was also found that the strain capacity of the reloaded pre-damaged concrete cylinders decreases while strength remained virtually unchanged. In the second phase of the first part, a fluorescent microscopy technique was used to assess the damage and develop a correlation between material degradation, by virtue of the geometrical features, and damage to the concrete. To account for the effect of confinement and cyclic loading, in the third phase, the residual capacity and damage assessment of unconfined and GFRP confined concrete cylinders subjected to low-cycle fatigue loading, was investigated. Similar to the first phase, permeability testing technique was used to provide an indirect evaluation of fatigue damage. Finally, in the fourth phase of the first part, the suitability of permeability testing technique to assess damage was evaluated for cored concrete taken from three types of RC members: columns, beams and a beam-column joint. In view of the fact that the composite action of an RC member is highly dependent on the bond between reinforcement and surrounding concrete, understanding the deterioration of the bond in the post-yield range of strain in steel was crucial to assess damage at member level. Therefore, in the second phase of this research, a state-of-the- art distributed fibre optic strain sensor system (DFOSSS) system was used to evaluate bond deterioration in a cantilever RC beam subjected to monotonic lateral loading. The technology allowed the continuous capture of strain, every 2.6 mm along the length, in both reinforcing bars and cover concrete. The strain profile provided a basis by which the slip, axial stress and bond stress distributions were then established. In the third part, the study focused on the damage assessment and residual capacity of seven half-scale RC beams subjected to a constant-amplitude cyclic loading protocol. In the first stage, the structural performances of three specimens under constant-amplitude fatigue at 1%, 2% and 4% chord rotation (drift) were examined. In parallel, the number of cycles to failure, degradation in strength, stiffness and energy dissipation were characterized. In the second stage, four RC beams were subjected to loading up to 70% and 90% of their fatigue life, at 2% and 4% drift, and then monotonically pulled up to failure. To determine the residual flexural capacity, the lateral force–displacement results of pre-damaged specimens were compared with an undamaged specimen subjected to only monotonic loading. The study showed significant losses in strength, deformability, stiffness and energy dissipation capacity. A nonlinear finite element analysis (FEA) using concrete damage plasticity (CDP) model was also conducted in ABAQUS to numerically investigate the behaviour of the tested specimen. The results of the FE simulations indicated a reasonable response compared with the behaviour of the test specimen in terms of force–displacement and cracking pattern. During the Christchurch earthquake it was observed that the loading history has a significant influence on structural responses. While in conventional pseudo-static loading protocol, internal forces can be redistributed along the plastic length: there is little chance for structures undergoing high initial loading amplitude to redistribute pertinent stresses. As a result, in the third phase of this part, the effect of high rate of loading on the behaviour of seismically designed RC beams was investigated. Two half-scale cantilever RC beams were subjected to similar constant-amplitude cyclic loading at 2% and 4% drifts, but at a rate of 500 mm/s. Due to the incapability of conventional measuring techniques, a motion-tracking system was employed for data acquisition with the high-speed tests. The effect of rate of loading on the fatigue life of specimens (i.e., the number of cycles required to failure), secant stiffness, failure mode, cracking pattern, beam elongations and bar fracture surface were analysed. Integrating the results of all parts of this research has resulted in a better understanding of residual capacity and the development of damage at both the material and member level by using a low-cycle fatigue approach.
TRACEY MARTIN to the Minister responsible for Novopay: Does he stand by his statement of 11 February 2014, "education payroll is the most complex in New Zealand and more work remains to be done to simplify the business processes to ensure it runs as smoothly as possible each year"? Hon DAVID CUNLIFFE to the Prime Minister: Does he stand by his statement that "the true builders of that future are the millions of New Zealanders working in the homes, the businesses, the industries of our country"? MAGGIE BARRY to the Minister of Finance: What progress is the Government making with its share offer programme, which is freeing up money for reinvestment in new public assets without having to increase Government debt? ANDREW LITTLE to the Attorney-General: Will he release all correspondence between the Christchurch Crown Solicitor or any other solicitor acting for the Ministry of Business, Innovation and Employment, and counsel for Peter Whittall on the decision not to proceed with the prosecution of Mr Whittall under the Health and Safety in Employment Act 1992 relating to conditions at the Pike River Mine that lead to the deaths of 29 miners; if not, why not? KEVIN HAGUE to the Minister of Health: When were Ministry of Health officials first informed that the dispute between the Southern District Health Board and South Link Health involved allegations of the misuse of public funding, and when were they first informed that this alleged misuse was suspected to involve elements that could be fraud? Dr CAM CALDER to the Minister for Tertiary Education, Skills and Employment: What announcements has the Government made on the Tertiary Education Strategy for New Zealand? Hon RUTH DYSON to the Minister responsible for the Earthquake Commission: Does he stand by his statement made yesterday in the House with regard to Canterbury Labour Members of Parliament that they "have made no more than five requests for assistance through the Earthquake Commission"; if not, when will he be correcting his statement and apologising? MARK MITCHELL to the Minister for Communications and Information Technology: How is the Government's Information and Communication Technology programme improving New Zealanders' access to improved technology and better connectivity? GRANT ROBERTSON to the Minister of Justice: On what date did she receive an invitation to visit the Shanghai office of Oravida Ltd during her Ministerial visit to China in October 2013, and what actions did she take to ensure this visit met her obligations under the Cabinet Manual? CATHERINE DELAHUNTY to the Associate Minister of Education: Did the communities in Christchurch, Auckland and Queenstown, where four schools are to be built using a public-private partnership (PPP) model, ask the Government for private sector management of their school buildings? PAUL FOSTER-BELL to the Minister of Health: What investment is the Government making in improving nutrition and exercise for pre-schoolers? JOANNE HAYES to the Minister of Corrections: What steps has the Government taken to improve access to alcohol and drug treatment for prisoners?
DAVID BENNETT to the Minister of Finance: How is the Government's economic programme helping to keep interest rates lower during this economic cycle, compared to the previous economic cycle in the mid-2000s? Dr RUSSEL NORMAN to the Minister of Energy and Resources: How much more is an average New Zealand household that uses 8,000kwh of power annually paying for electricity per year as of November 2013 compared to November 2008, according to the Ministry of Business, Innovation, and Employment's latest Quarterly Survey of Domestic Electricity Prices? Hon DAVID PARKER to the Minister of Finance: What will he do to "spread some of the benefits of growth" when hourly wage rates have only grown by 1.6 percent in the year to December 2013, which is close to 0 percent in real terms, when 45 percent of listed corporates have double-digit profit growth? JACQUI DEAN to the Minister for the Environment: What recent announcements has the Government made on the classification for drilling for oil and gas in New Zealand's Exclusive Economic Zone? GRANT ROBERTSON to the Minister of Justice: When she told the House yesterday "I had previously told Oravida that it could not use my name or photograph to endorse or promote its business products or services" when was that and what specific circumstances did it relate to? COLIN KING to the Minister for Tertiary Education, Skills and Employment: How is the Youth Guarantee Scheme helping the Government achieve the Better Public Services target of 85 percent of all 18-year-olds achieving NCEA Level two or an equivalent qualification in 2017? CAROL BEAUMONT to the Minister of Women's Affairs: Does she have confidence in the Ministry of Women's Affairs given their 2013 Annual Report shows that six out of seven policy outcomes have stayed the same or gone backwards in the last past year; if so, why? SCOTT SIMPSON to the Minister for Courts: How is the Government improving the way the Disputes Tribunal works to make it easier for New Zealanders to resolve civil disputes? Hon TREVOR MALLARD to the Minister of Internal Affairs: What action, if any, has he taken this year to show the Prime Minister that he has met the highest ethical standards required by Section 2.53 of the Cabinet Manual? ALFRED NGARO to the Minister of Pacific Island Affairs: What steps is the Government taking to lift the skills of Pacific people in New Zealand? DENIS O'ROURKE to the Minister for Canterbury Earthquake Recovery: Does he accept the conclusion in the Human Rights Commission's report Monitoring Human Rights in the Canterbury Earthquake Recovery that "many people affected by the earthquakes continue to experience deteriorating standards of living and impacts on their quality of life that go beyond the immediate effects of the disaster"? CATHERINE DELAHUNTY to the Minister of Energy and Resources: Has he had any discussions with any Indian Government Ministers about selling Solid Energy assets?
Earthquakes cause significant damage to buildings due to strong vibration of the ground. Levitating houses using magnets and electromagnets would provide a complete isolation of ground motion for protecting buildings from seismic damage. Two types of initial configuration for the electromagnet system were proposed with the same air gap (10mm) between the electromagnet and reluctance plate. Both active and passive controller are modelled to investigate the feasibility of using a vibration control system for stabilizing the magnetic system within the designed air gap (10mm) in the vertical direction. A nonlinear model for the magnetic system is derived to implement numerical simulation of structural response under the earthquake record in Christchurch Botanic Gardens on 21 February 2011. The performance of the uncontrolled and the controlled systems are compared and the optimal combination of control gains are determined for the PID active controller. Simulation results show both active PID controller with constant and nonlinear attracting force are able to provide an effective displacement control within the required air gap (+/-5mm). The maximum control force demand for the PID controller in the presence of nonlinear attracting force is 4.1kN, while the attracting force in equilibrium position is 10kN provided by the electromagnet. These results show the feasibility of levitating a house using the current electromagnet and PID controller. Finally, initial results of passive control using two permanent magnets or dampers show the structural responses can be effectively reduced and centralized to +/-1mm using a nonlinear centring barrier function.
A video of Lianne Dalziel speaking to a public gathering about her reasons for standing for the mayoralty of Christchurch. Dalziel talks about starting her mayoralty where Share an Idea left off, making the Council a high performing team, and getting the community involved in the decisions about the future of the city. The video also includes footage of Dalziel taking a tour of the Christchurch central city. Dalziel visits the ChristChurch Cathedral, pointing out a sign which reads, "The earthquakes stopped us, but inept procedures are killing us". She also visits the new Westende Jewellers building, which she notes was the first rebuild in the Christchurch central city but will come down as part of CERA's Transport Plan. Dalziel is shown socialising with members of the public and watching the Christchurch Wizard bless New Regent Street.
Three excavators sit on top of the demolition rubble where the Crowne Plaza Hotel once stood. In the background are the Forsyth Barr building (left), the Victoria Apartments (centre), and the Environment Court building (right).
A photoshopped image of the front of the cathedral with its broken tower. The upper part of the front wall has crumbled completely, exposing the inside space. Security fences have been placed around the building to restrict access.
John Key farewells Parliament by remembering the funny and the proud moments of being Prime Minister, but also the heartbreak of the Christchurch earthquakes, the Pike River disaster and the deaths of troops in Afghanistan.
Roger Sutton, the chief executive of networks company Orion has taken up a five-year contract as the CEO of the Christchurch Earthquake Reconstruction Authority, the top bureaucrat in the post-quake city.
The new Wellington Venues Limited CEO discusses her ideas for the events scene in the capital, plus the addition of a new Christchurch Artists exhibition in the St James Theatre, which will raise money for artists affected by the earthquake
On the eve of the memorial service for the Christchurch earthquake, the Labour party is laying into the Government's handling of the city's ditching as a Rugby World Cup venue.
The warnings, or lack of them from the government's scientists about the likely size of aftershocks following the first Canterbury earthquake have been a focus of the Royal Commission into the quakes.
High School students in Christchurch have defied the odds and the ongoing disruption caused by the earthquakes and achieved better marks in last year's NCEA than students in the rest of the country.
Workers at the Sockburn meat works in Christchurch say the announcement that the plant will close at the end of the season is a double blow after a year of coping with the aftermath of earthquakes.