An old advertisement for McCormick Reapers and Binders on the side of a building has been exposed by the demolition of the adjoining building.
Photograph captioned by BeckerFraserPhotos, "The PricewaterhouseCoopers building on Armagh Street under demolition. The Isaac Theatre Royal is in the foreground (being restored)".
Photograph captioned by BeckerFraserPhotos, "A large pile of concrete rubble from a demolition site in Kilmore Street. Forsyth Barr building in the background".
Our City building extensively propped up. File reference: CCL-2011-08-12-CanterburyPublic Library pre-demolition-040 From the collection of Christchurch City Libraries.
A goods train stopped on the track beside SH71 near Rangiora. Trains were unable to run until buckled tracks were inspected and repaired.
A photograph captioned by BeckerFraserPhotos, "Christ's College, Rolleston Avenue. Damage to the top of this building has had temporary repairs carried out".
A goods train stopped on the track beside SH71 near Rangiora. Trains were unable to run until buckled tracks were inspected and repaired.
A goods train stopped on the track beside SH71 near Rangiora. Trains were unable to run until buckled tracks were inspected and repaired.
A goods train stopped on the track beside SH71 near Rangiora. Trains were unable to run until buckled tracks were inspected and repaired.
A goods train stopped on the track beside SH71 near Rangiora. Trains were unable to run until buckled tracks were inspected and repaired.
A pile of tarseal scraped from the damaged River Road sits in front of a house. The photographer comments, "Road repairs and abandoned houses".
A goods train stopped on the track beside SH71 near Rangiora. Trains were unable to run until buckled tracks were inspected and repaired.
A photograph of a protest sign reading, "Pillage People" and showing the faces of key figures in the Christchurch rebuild superimposed on the bodies of the Village People. The photograph is captioned by Paul Corliss, "Woodham Road, Linwood".
Disasters are often followed by a large-scale stimulus supporting the economy through the built environment, which can last years. During this time, official economic indicators tend to suggest the economy is doing well, but as activity winds down, the sentiment can quickly change. In response to the damaging 2011 earthquakes in Canterbury, New Zealand, the regional economy outpaced national economic growth rates for several years during the rebuild. The repair work on the built environment created years of elevated building activity. However, after the peak of the rebuilding activity, as economic and employment growth retracts below national growth, we are left with the question of how the underlying economy performs during large scale stimulus activity in the built environment. This paper assesses the performance of the underlying economy by quantifying the usual, demand-driven level of building activity at this time. Applying an Input–Output approach and excluding the economic benefit gained from the investment stimulus reveals the performance of the underlying economy. The results reveal a strong growing underlying economy, and while convergence was expected as the stimulus slowed down, the results found that growth had already crossed over for some time. The results reveal that the investment stimulus provides an initial 1.5% to 2% growth buffer from the underlying economy before the growth rates cross over. This supports short-term economic recovery and enables the underlying economy to transition away from a significant rebuild stimulus. Once the growth crosses over, five years after the disaster, economic growth in the underlying economy remains buoyant even if official regional economic data suggest otherwise.
Photograph captioned by BeckerFraserPhotos, "Moira Fraser discussing options with the owner of The Twisted Hop on Poplar Lane which is under a demolition order.".
A photograph captioned by BeckerFraserPhotos, "The IRD building on Cashel Street seen from across the demolition site of the Occidental Hotel on Hereford Street".
Photograph captioned by BeckerFraserPhotos, "Millennium Hotel, Cathedral Square, with a set of stairs from the BNZ bank under demolition being craned from the building".
Photograph captioned by BeckerFraserPhotos, "High Street with the remains of the Hotel Grand Chancellor and the Holiday Inn and Westpac building (both under demolition)".
A view of Cashel Street from the High Street intersection. An empty demolition site where a building once stood has been cordoned off with security fencing.
A photograph captioned by BeckerFraserPhotos, "Loading the remains of 107 Manchester Street into a demolition truck. The water is to keep the dust down.".
A photograph of the demolition site of Forbe's Store in Lyttelton. A section of the remaining floor has the words, "Robert Forbes" inlaid in the tiles.
Photograph captioned by BeckerFraserPhotos, "Looking along Chester St West - there are already a number of empty sites and several more buildings due for demolition".
Photograph captioned by BeckerFraserPhotos, "Gloucester Street. Demolition rubble and a shop window mural reflected in a mirror on the back wall of a shop".
Photograph captioned by BeckerFraserPhotos, "The site of Kenton Chambers, 190-192 Hereford Street".
Photograph captioned by BeckerFraserPhotos, "The site of Warners Hotel at 36-50 Cathedral Square".
Photograph captioned by BeckerFraserPhotos, "The site of Warners Hotel at 36-50 Cathedral Square".
Photograph captioned by BeckerFraserPhotos, "The link between Morley House and Durham Street Methodist Church".
An aerial photograph captioned by BeckerFraserPhotos, "Intersection of Colombo and Brougham Streets".
A crane on London Street in Lyttelton, lifting a platform outside the Empire Hotel.
A crane on London Street in Lyttelton, lifting a platform outside the Empire Hotel.