
Photograph captioned by Fairfax, "Workmen repairing to remove dangerous rocks/boulders on Castle Hill above the Lyttelton tunnel road".
Computers and desks wrapped up and stacked on level 2 of the James Hight Library, while repairs are made.
A crane sits beside the sewage treatment ponds in Bromley. The photographer comments, "Bromley sewage treatment ponds, under repair".
A crane sits beside the sewage treatment ponds in Bromley. The photographer comments, "Bromley sewage treatment ponds, under repair".
A crane sits beside the sewage treatment ponds in Bromley. The photographer comments, "Bromley sewage treatment ponds, under repair".
Christchurch builders are worried asbestos repairs in the earthquake rebuild will continue to cause problems for years to come.
Sewer repairs due to earthquake damage have our street totally closed off apart from pedestrian traffic down the footpath.
Many Christchurch residents have used shipping containers and other temporary structures to store belongings in while repairs were carried out after the earthquakes. But the Christchurch City Council says it's had an increase in complaints from residents about containers and other temporary structures obscuring neighbours' views or obstructing council berms. Chairman of the council's regulation and consents committee David East says if earthquake repairs are completed, the container may have to go.
It's almost eight years to the day since the first Christchurch earthquake, and as anyone who lives in Christchurch knows, some insurance claims are still in dispute. Dodgy repairs are still being discovered and previously undiscovered damage is being found. Earthquake Commission minister Megan Woods says as problems emerge, people can come back and ask for re-repairs or have their home looked at. But just how much money is in the National Disaster Fund?
Workers repairing the James Hight building at the University of Canterbury, seen from inside the library. The photographer comments, "Yet another change of workplace for our E-Learning group, as the University juggles people and buildings to carry out earthquake repairs. Our area looks over a central roof space that has seating areas. It may be a while before we're allowed out there though".
Some 10 years on from the devastating Canterbury quakes, the wait is still not over when it comes to law changes needed to improve the Earthquake Commission. The government will not get it done until 2021, if it's re-elected. Meanwhile cases of botched quake repairs needing a fix are still flooding into EQC, Greater Christchurch Regeneration Minister Megan Woods told Checkpoint.
One landscape colour digital photograph taken on 14 July 2011 showing the temporary repairs made to the retaining wall in the middle of Ripon Street. The temporary wall replaces two sections of red stone wall which collapsed in the June 2011 Earthquake. It is made from stacked concrete cubes with coarse fill and the top is covered with black pla...
It could be up to 18 months before 660 Christchurch homeowners know who will pay for earthquake damage repairs with a $1 billion price tag. The bill to fix houses in Christchurch that weren't repaired properly the first time round, or have suffered more damage in aftershocks, is climbing - and the government can't say who's liable. The problem is the homes have new owners who can't claim on theri insurance because the damage pre-dates them owning the home. Earlier Greater Christchurch Regeneration Minister Megan Woods told us the previous National government put no plan in place, and the current government is being left to pick up the pieces. Former Christchurch earthquake recovery minister Gerry Brownlee disputes the issue.
The front page graphic for an earthquake edition of The Press. The main headline reads, "100,000 homes need repairs".
Photograph captioned by Fairfax, "City Care workers repair broken water pipes on Matipo Street, probably caused by the morning's earthquake".
A document which describes how SCIRT led the co-ordination of its huge repair programme with those of other utilities.
Photograph captioned by Fairfax, "Damage from the February 22nd earthquake in Christchurch. Chimney repair work on Hackthorne Road, Cashmere".
A photograph of Helen Campbell repairing Crack'd for Christchurch's armchair mosaic in the Green Room garden on Colombo Street.
Tape and glue has been used to repair a window on the Cathedral of the Blessed Sacrament on Barbadoes Street.
Canterbury homeowners are questioning the validity of a survey which was supposed to independently test the quality of earthquake repairs.
The damaged (and once iconic Christchurch Cathedral) waits it's fate (repaired or demolish/rebuild) with the Millenium hotel in background.
More repairs to the infrastructure as a result of the 2010 & 2011 earthquakes. Boat ramp at New Brighton. Avon River.
More repairs to the infrastructure as a result of the 2010 & 2011 earthquakes. Boat ramp at New Brighton. Avon River.
Photograph captioned by BeckerFraserPhotos, "Facade of the McKenzie & Willis building corner High and Tuam Streets (to be repaired)".
Photograph captioned by BeckerFraserPhotos, "The almost-repaired west end of Woodham Road where the ground rose about 40 cm".
Photograph captioned by Fairfax, "St John's Church in Hororata undergoes repairs after it was damaged in the Canterbury earthquake last month".
The Transport Agency says initial repairs to State Highways damaged in the Canterbury earthquake could cost up to six million dollars.
17 jobs have gone at the Christchurch Art Gallery, which is closed for earthquake repairs until at least June next year.
A consent granted by the Christchurch City Council, providing consent to carry out earthquake repair work that may affect protected vegetation.
A paper prepared for the Ozwater 2013 conference detailing the story of the damage to, and subsequent repair of, Huntsbury Reservoir.