A study by the Department of Labour shows 24,000 extra workers will be needed to complete the rebuild of Christchurch. The workers to be housed at Burnham or on a ship in Lyttelton, there are so many advantages to this scheme that the man in the cartoon decides it cannot possibly work. Colour and black and white versions available Quantity: 2 digital cartoon(s).
20160415_0029_1D3-24 Red Zone Closures The permanent closure (to motor vehicles) of the Bexley red zone streets has started. This was once the main south-north route just west of the Avon River in the New Brighton area, till an expressway (ring road) was built about 80m to the west (right) about 12-13 years ago. Then it became just another ...
This report presents the simplified seismic assessment of a case study reinforced concrete (RC) building following the newly developed and refined NZSEE/MBIE guidelines on seismic assessment (NZSEE/MBIE, semi-final draft 26 October 2016). After an overview of the step-by-step ‘diagnostic’ process, including an holistic and qualitative description of the expected vulnerabilities and of the assessment strategy/methodology, focus is given, whilst not limited, to the implementation of a Detailed Seismic Assessment (DSA) (NZSEE/MBIE, 2016c). The DSA is intended to provide a more reliable and consistent outcome than what can be provided by an initial seismic assessment (ISA). In fact, while the Initial Seismic Assessment (ISA), of which the Initial Evaluation Procedure is only a part of, is the more natural and still recommended first step in the overall assessment process, it is mostly intended to be a coarse evaluation involving as few resources as reasonably possible. It is thus expected that an ISA will be followed by a Detailed Seismic Assessment (DSA) not only where the threshold of 33%NBS is not achieved but also where important decisions are intended that are reliant on the seismic status of the building. The use of %NBS (% New Building Standard) as a capacity/demand ratio to describe the result of the seismic assessment at all levels of assessment procedure (ISA through to DSA) is deliberate by the NZSEE/MBIE guidelines (Part A) (NZSEE/MBIE 2016a). The rating for the building needs only be based on the lowest level of assessment that is warranted for the particular circumstances. Discussion on how the %NBS rating is to be determined can be found in Section A3.3 (NZSEE/MBIE 2016a), and, more specifically, in Part B for the ISA (NZSEE/MBIE 2016b) and Part C for the DSA (NZSEE/MBIE 2016c). As per other international approaches, the DSA can be based on several analysis procedures to assess the structural behaviour (linear, nonlinear, static or dynamic, force or displacement-based). The significantly revamped NZSEE 2016 Seismic Assessment Guidelines strongly recommend the use of an analytical (basically ‘by hand’) method, referred to the Simple Lateral Mechanism Analysis (SLaMA) as a first phase of any other numerically-based analysis method. Significant effort has thus been dedicated to provide within the NZSEE 2016 guidelines (NZSEE/MBIE 2016c) a step-by-step description of the procedure, either in general terms (Chapter 2) or with specific reference to Reinforced Concrete Buildings (Chapter 5). More specifically, extract from the guidelines, NZSEE “recommend using the Simple Lateral Mechanism Analysis (SLaMA) procedure as a first step in any assessment. While SLaMA is essentially an analysis technique, it enables assessors to investigate (and present in a simple form) the potential contribution and interaction of a number of structural elements and their likely effect on the building’s global capacity. In some cases, the results of a SLaMA will only be indicative. However, it is expected that its use should help assessors achieve a more reliable outcome than if they only carried out a detailed analysis, especially if that analysis is limited to the elastic range For complex structural systems, a 3D dynamic analysis may be necessary to supplement the simplified nonlinear Simple Lateral Mechanism Analysis (SLaMA).” This report presents the development of a full design example for the the implementation of the SLaMA method on a case study buildings and a validation/comparison with a non-linear static (pushover) analysis. The step-by-step-procedure, summarized in Figure 1, will be herein demonstrated from a component level (beams, columns, wall elements) to a subassembly level (hierarchy of strength in a beam-column joint) and to a system level (frame, C-Wall) assuming initially a 2D behaviour of the key structural system, and then incorporating a by-hand 3D behaviour (torsional effects).
Topics - ready with the pumps at last this time, but thankfully not as much rain - so far - as feared for people in the low-lying Flockton Basin in Christchurch. Labour's proposing a special court be set up just to deal with earthquake insurance claims, as part of a policy around the Christchurch rebuild. The policy would see an Earthquake Court established to try to speed up the settling of 9,755 outstanding "over cap" insurance claims. John Banks will be gone by Friday from Parliament, at the behest of the ACT party with a gentle nudge from the Nats as well. The PM thinks it's a joke that the Civilian political party, run by Ben Uffindell and named after his satirical webite, will receive $33,000 of taxpayer funding for the coming election.
A Christchurch homeowner in a five year battle with the Earthquake Commission over the damaged house she unwittingly bought says a critical new report about EQC tells her nothing new. The 27 page review by Independent Ministerial Advisor Christine Stevenson looks at how to resolve the 3,600 claims that still haven't been settled after the 2010 and 2011 quakes. The recommendations include getting the Commission to hire more staff and to stop forcing people to use the Official Information Act to get their files. It also suggests giving EQC more power to settle the on-sold claims where people bought houses under the impression all damage had been identified and fixed. Georgina Hannafin has a home that needs $260,000 worth of repairs but EQC has offered her just $48,000.
Paul Nicholls from the University of Canterbury's E-Learning team and Digital Media Group Manager Wayne Riggall in their temporary office in KB02 in Kirkwood Village, the complex of prefabs set up after the earthquakes to provide temporary office and classroom space for the university. The photographer comments, "The e-learning group and the video conferencing team are now located in the Kirkwood Village at the University of Canterbury. It's a very impressive project, about 60 buildings arranged in various configurations with some used for teaching or computer labs, and others as staff offices. We will probably stay here for several years now. Adjoining our area is a space for Wayne, the Digital Media Group Manager, who will organise a sitting area for visitors and small meetings. Beyond Wayne is a closed-off meeting room".
This study led on from Earthquake hazard and risk assessment study Stage 1 Part A: Earthquake source identification and characterisation (Pettinga et al, 1998). It used the location and characteristics of active faults in the Canterbury region, and the historic record of earthquakes to estimate levels of ground shaking (MM intensity, peak ground acceleration and spectral accelerations) across Canterbury for different return periods. The study also provided earthquake scenarios for selected towns and cities in Canterbury, and undertook detailed investigations into the largest historic earthquakes in Christchurch and parts of the Canterbury region. See Object Overview for background and usage information.
A video about the restoration of the dome of the Isaac Theatre Royal. The video includes an interview with Vanessa Carswell, Associate at Warren and Mahoney, about the dimensions of the dome. Because the dome is not a perfect circle, the dome and the canvas that cover it have to be reinstalled in exactly the same way, and the dimensions have to be measured accurately so that the new steelwork fits correctly. The video also includes an interview with art restorer Carolina Izzo about restoring the canvas covering of the dome. Izzo says that the theatre lights have burnt the edges of the canvas, and some patches have been affected by mould. She also explains the process for cleaning the artwork.
A video of a press conference with Christchurch Mayor Lianne Dalziel and Raf Manji, Chair of the Christchurch City Council Finance Committee, about the KordaMentha report. KordaMentha is an independent auditing firm which specialises in insolvencies and corporate recovery. The report analysed the Christchurch City Council's three year budgeting plan and the financial strategies that lay behind it. Much of this budget dealt with the challenges in Christchurch caused by the 2010 and 2011 earthquakes. Dalziel talks about the cost of mending Christchurch's infrastructure, the Council's insurance settlement, and the need to address the findings in the report. Manji talks about the Council's financial options following the report.
Aerial footage of Christchurch recorded the day after the 22 February 2011 earthquake. The footage shows damage to the Smith City car park, the Cathedral of the Blessed Sacrament, the CTV Building, the PGC Building, the Durham Street Methodist Church, the Lyttelton Timeball Station, the roads alongside the Avon River, and the ChristChurch Cathedral. It also shows New Zealand Army road blocks outside the hospital, crushed buses on Colombo Street, a Royal New Zealand Navy vessel in Lyttelton Harbour, rock fall on the Summit Road, collapsed cliffs in Sumner and Redcliffs, tents set up in a park, flooding in New Brighton, and liquefaction in QEII Park.
A video of a panel discussion at the 2014 Seismics and the City forum. The theme of this section was Building Momentum, and it addressed panellists' views on the progress of the rebuild, the main obstacles, and how they can be resolved. The panellists are as follows: Christchurch Mayor Lianne Dalziel; Waimakariri Mayor David Ayers; Roger Sutton, CEO of CERA; Ian Simpson, CEO of the NZ Earthquake Commission; Peter Townsend, CEO of Canterbury Employers' Chamber of Commerce; and Joanna Norris, Editor of The Press.
Members of the University of Canterbury's Digital Media Group in their temporary office in KB02 in Kirkwood Village, the complex of prefabs set up after the earthquakes to provide temporary office and classroom space for the university. The photographer comments, "The e-learning group and the video conferencing team are now located in the Kirkwood Village at the University of Canterbury. It's a very impressive project, about 60 buildings arranged in various configurations with some used for teaching or computer labs, and others as staff offices. We will probably stay here for several years now. Looking up the centre of the room towards the front doors. The video conferencing team and Nikki Saunders, the course reader publisher, sit here. (The pizzas are for a moving-in celebration held just after I took these photos.)
The dome of the Isaac Theatre Royal covered in sheeting and suspended in the backstage area. In the foreground, a small digger sits on the bed of a truck, and a crane is visible to the left. The photographer comments, "This is the 'dome' of the Isaac Theatre Royal's heritage stage. The front section of the theatre has stayed and so has the back, but the middle has been completely demolished. The best way to hide a secret is in plain sight. Could this really be an ancient UFO stored secretly in the old theatre for decades and now exposed by the earthquake? Is the waiting crane and transporter ready to whip it away to another secret location in the dead of night?".
People gather at the corner of Colombo and St Asaph Streets shortly after the 22 February earthquake. A building has collapsed, and bricks and rubble litter the street. The photographer comments, "Just after the aftershock settled on Tuesday afternoon, myself and colleagues fled our Tuam Street office to absolute devastation outside. We couldn't see more than a block in either direction due to the clouds of dust that had arisen from buildings that had just collapsed ... From here, we picked up our vehicles from the CCC car park and headed out to get out of the chaos to a position where we could check on loved ones. Heading first along Manchester Street, buildings that were already heavily damaged were now completely written off. We couldn't get much further down Manchester Street so eventually made it to Colombo Street".
An audio recording of a mayoral debate hosted by Generation Zero in partnership with 350 Christchurch. The event was titled Mayoral Debate: a climate-smart Christchurch. It was held on campus at the University of Canterbury on Thursday 22 September, 2016 and was moderated by Catarina Gutierrez of the Ministry of Awesome. The debate was structured as follows: Section 1: Candidates answered set questions sent prior to the event Section 2: Candidates answered set questions they have not seen before Interval Section 3: Candidates answered written questions from the audience (climate-related questions were submitted during the interval and a selection of these were given to the moderator). The audio recording was taken through the University's Echo system.
A video of Ladi6 and All Right? staff member Ciaran Fox "getting out and about", being shown around the Chart BeatBox Studio by Deanne Simmonds, CHART/BeatBox manager. BeatBox is located on the corner of St Asaph St and Madras St, and it has provided a studio space in the CBD for musicians and other creatives. BeatBox has also received support from government agencies and community organisations for providing an essential central city project in transitional Christchurch. All Right? uploaded the video to YouTube on 21 April 2015 and posted a link to the video on their Facebook Timeline on 4 May 2015 at 7:00pm.
A report written by Christchurch East Youth MP Beth Walters in 2016. The purpose of the report is to present the views of young people from Eastern Christchurch. More than 50 young people from Aranui High School, Linwood College and Mairehau High School were surveyed on a range of questions related to living in the East: Use one word to describe how you feel about living in the Eastside of Christchurch What do you like about living in the Eastside of Christchurch? What don't you like about your community? What do you think can be done to change it? If you had the option would you stay? The report contains raw data, themes and overall findings from the survey.
Damage to River Road in Richmond. The road is badly cracked and slumped, and is closed off with a row of road cones tied with warning tape. The word "closed" has been spray painted on the road surface. The photographer comments, "These photos show our old house in River Rd and recovery work around Richmond and St Albans. River Rd was again subject to severe lateral spreading. The river is still grey with silt, the road is ripped and sunken, and power poles lean at random angles. The red car belonged to a postie, who had to come back with a tow truck to extricate the car from the hole that had opened underneath it. Looking along River Road to the north-east. Taken outside 79 Medway St".
Paul Nicholls, a member of the University of Canterbury's E-Learning team, in their temporary office in KB02 in Kirkwood Village, the complex of prefabs set up after the earthquakes to provide temporary office and classroom space for the university. The photographer comments, "The e-learning group and the video conferencing team are now located in the Kirkwood Village at the University of Canterbury. It's a very impressive project, about 60 buildings arranged in various configurations with some used for teaching or computer labs, and others as staff offices. We will probably stay here for several years now. Our "techy corner", with Paul waiting for the desk-assembler to come back and put his desk together. My desk is in the corner, and Jess is on the right of the window".
A review of the week's news including... New questions are raised by leaked video footage showing a robot and two workers inside the Pike River mine just months after the 2010 disaster, fresh happy faces in the newly announced Labour list line up, the country's two biggest media companies have been given a strong message from the regions after their proposed merger is knocked back, a full biosecurity operation launched in Kerikeri, Wellington house prices soar, a helicopter pilot describes his crash north of Wellington as 'frightening', women in the Mongrel Mob say there is now less violence towards women, a review of the Kaikoura earthquake reveals it generated a tsunami of nearly 7 metres, the most annoying driving habits on Christchurch roads and one half of a champion rowing crew is surprised by the other half's retirement announcement.
Christchurch's historic Theatre Royal will reopen for business in November, with bookings about to open for the first show, the Royal New Zealand Ballet season of "A Christmas Carol" The 106-year old theatre has been closed for almost four years because of earthquake damage in the 2010 and 2011 earthquakes. The $40million rebuild and restoration project will be completed over the next five months and on 17 November 2014, the 'Grand Old Lady' of New Zealand theatre will reopen her doors for performances. With so few venues for performance left in the city, including the Town Hall out of commission indefinitely, the rebuild of the Theatre Royal is very good news for Christchurch audiences Chief executive Neil Cox explains the process of getting oldest Edwardian theatre in the country back in use and mounting the large scale theatrical productions it has been famous for.
Five years on since the first major earthquake struck the Canterbury region, the reconstruction is well advanced. Christchurch is a city in transition. This report considers trends in resourcing and employment practice of Canterbury construction organisations in response to the projected market changes (2015-2016). The report draws on the interviews with 18 personnel from 16 construction organisations and recovery agencies in October 2015. It provides a summary of perceived changes in the construction market in Canterbury, evidence of what steps construction businesses have been taking, how they have prepared for likely changes in the reconstruction sector, as well as the perceived alignment of public policies with the industry response.
A Christchurch seismic monitor churns out reams of paper with wild fluctuations showing earthquakes and aftershocks. Nearby two men examine a second monitor and one of them says 'This one's connected to Gerry Brownlee!' The reams of paper show a perfectly straight line - it appears that nothing is going on in Gerry Brownlee's head. Context - A sense that the Minister for Earthquake Recovery is being less than effective. Colour and black and white versions available Quantity: 2 digital cartoon(s).
Part one of the audio that makes up Gap Filler's 29th project, the Transitional City Audio Tour. This part of the tour begins at the Pallet Pavilion on the corner of Kilmore and Durham Streets. It includes commentary on the Crowne Plaza Hotel and the Town Hall, as well as the Captain Cook and Queen Victoria statues in Victoria Square. The tour then moves down Armagh Street to New Regent Street where there is a discussion of Trambiance, a series of sound performances in the Christchurch tram. The tour also includes commentary on the rebuild of New Regent Street and the Isaac Theatre Royal.
The University of Canterbury held its inaugural Earthquake Forum on the 2nd September 2011. It was an opportunity to hear the diversity of earthquake-related research currently being undertaken in Canterbury and a chance for researchers and those working on the recovery to identify further areas where the research can support the recovery effort.The morning consisted of presentations showcasing the breadth of research currently underway and the afternoon will create the opportunity for people to connect in a series of concurrent workshops on the land, buildings and people. Neil Challenger's presentation covers landscape architecture, temporary landscapes, exploration of design ideas and specific student research related to urban design and earthquake recovery.
We present the initial findings from a study of adaptive resilience of lifelines organisations providing essential infrastructure services, in Christchurch, New Zealand following the earthquakes of 2010-2011. Qualitative empirical data was collected from 200 individuals in 11 organisations. Analysis using a grounded theory method identified four major factors that aid organisational response, recovery and renewal following major disruptive events. Our data suggest that quality of top and middle-level leadership, quality of external linkages, level of internal collaboration, ability to learn from experience, and staff well-being and engagement influence adaptive resilience. Our data also suggest that adaptive resilience is a process or capacity, not an outcome and that it is contextual. Post-disaster capacity/resources and post-disaster environment influence the nature of adaptive resilience.
Liquefaction-induced lateral spreading during earthquakes poses a significant hazard to the built environment, as observed in Christchurch during the 2010 to 2011 Canterbury Earthquake Sequence (CES). It is critical that geotechnical earthquake engineers are able to adequately predict both the spatial extent of lateral spreads and magnitudes of associated ground movements for design purposes. Published empirical and semi-empirical models for predicting lateral spread displacements have been shown to vary by a factor of <0.5 to >2 from those measured in parts of Christchurch during CES. Comprehensive post- CES lateral spreading studies have clearly indicated that the spatial distribution of the horizontal displacements and extent of lateral spreading along the Avon River in eastern Christchurch were strongly influenced by geologic, stratigraphic and topographic features.
Cultural heritage is a dynamic concept, incorporating the ideas and values of many different organisations and individuals; it is heavily dependent on the context of the item or site being conserved, and transforms something from an old article into a historically significant object. A formal definition of cultural heritage did not appear in the Antarctic Treaty System until 1995, however Antarctic heritage value has been applied to various sites and monuments since the inception of the Treaty, from Shackleton’s Nimrod Hut to a heavy tractor. This report examines a number of case studies to determine the various ways in which heritage items and sites can be managed – such as the removal of the South Pole Dome – as well as their conservation after natural disasters, for instance the Christchurch earthquakes.
Existing unreinforced masonry (URM) buildings are often composed of traditional construction techniques, with poor connections between walls and diaphragms that results in poor performance when subjected to seismic actions. In these cases the application of the common equivalent static procedure is not applicable because it is not possible to assure “box like” behaviour of the structure. In such conditions the ultimate strength of the structure relies on the behaviour of the macro-elements that compose the deformation mechanisms of the whole structure. These macroelements are a single or combination of structural elements of the structure which are bonded one to each other. The Canterbury earthquake sequence was taken as a reference to estimate the most commonly occurring collapse mechanisms found in New Zealand URM buildings in order to define the most appropriate macroelements.
The latest two great earthquake sequences; 2010- 2011 Canterbury Earthquake and 2016 Kaikoura Earthquake, necessitate a better understanding of the New Zealand seismic hazard condition for new building design and detailed assessment of existing buildings. It is important to note, however, that the New Zealand seismic hazard map in NZS 1170.5.2004 is generalised in effort to cover all of New Zealand and limited to a earthquake database prior to 2001. This is “common” that site-specific studies typically provide spectral accelerations different to those shown on the national map (Z values in NZS 1170.5:2004); and sometimes even lower. Moreover, Section 5.2 of Module 1 of the Earthquake Geotechnical Engineering Practice series provide the guidelines to perform site- specific studies.