Repairs are being carried out on the Avondale Road bridge.
This will open up the street to the Avon River
Artist Peter Majendie's decorated tree on the corner of Manchester Street and Cambridge Terrace. The tree has been covered with a large frost cloth and hi-vis material for the launch of an earthquake fund by the Canterbury Community Trust.
A view from Cambridge Terrace of the damaged Our City O-Tautahi building, formerly the Municipal Chambers. Scaffolding and steel bracing has been placed along the front of the building.
A photograph captioned by Paul Corliss, "Cardboard Cathedral construction, corner Madras and Cashel Streets".
The partially-demolished BNZ building in Cathedral Square.
A photograph captioned by BeckerFraserPhotos, "Bonnington's on Manchester Street".
Scaffolding surrounds the Cathedral Junction building on Worcester Street. Security fences have been placed around the building to restrict access.
A photograph of people at the site of the CTV building. The photograph is captioned by Paul Corliss, "Second anniversary 22 February earthquake".
A photograph of people at the site of the CTV building. The photograph is captioned by Paul Corliss, "Second anniversary 22 February earthquake".
A signpost pointing 'West' and 'East'. The sign pointing West is intact; that indicating East is broken and barely hanging on to the post. Refers to the condition of Christchurch City after the earthquakes of 2010 and 2011; the western wealthier suburbs were less damaged than the poorer Eastern suburbs. Also, progress on repair and rehabilitation of eastern housing had been slow. The redesign of the city centre seemed to be a western suburb priority which ignored the poverty and misery of living conditions on the east. Quantity: 1 digital cartoon(s).
Listening to that was the Earthquake Recovery Authority chief executive Roger Sutton.
Diggers clearing a demolition site in Cathedral Square, seen from Worcester Street.
As seen from Hereford St over the demolition of the corner buildings.
20130817_2457_1D3-400 The story of Christchurch (Day 229/365) Many roads are closed all over eastern Christchurch as infra-structure repairs are carried out, whether it be water supplies, sewer repairs (as is the case here) or general road repairs, In just over two weeks it will be three years since the first earthquake happened (4th September...
Vehicles drive through a flooded road in New Brighton. A sign advertising the stronger Christchurch website reads, 'Rebuilding for our future'.
Earthquake engineers working on the rebuild of Christchurch have been told they are in the most painful part, two years on.
A vacant demolition site where buildings once stood is surrounded by security fencing.
A photograph captioned by Paul Corliss, "Heathcote Library successful anti-demolition protest placards".
A photograph captioned by Paul Corliss, "Heathcote Library successful anti-demolition protest placards".
A photograph captioned by Paul Corliss, "Heathcote Library successful anti-demolition protest placards".
A photograph captioned by Paul Corliss, "Heathcote Library successful anti-demolition protest placards".
The basement of the "Price Waterhouse" building after demolition after the Christchurch earthquakes...
A photograph captioned by Paul Corliss, "Packing for EQC at 38 Belleview Terrace".
A photograph captioned by Paul Corliss, "Packing for EQC at 38 Belleview Terrace".
A photograph captioned by Paul Corliss, "Packing for EQC at 38 Belleview Terrace".
A photograph captioned by Paul Corliss, "Packing for EQC at 38 Belleview Terrace".
A photograph captioned by Paul Corliss, "Packing for EQC at 38 Belleview Terrace".
A photograph captioned by Paul Corliss, "Packing for EQC at 38 Belleview Terrace".
The information board for the Riccarton House earthquake repairs and strengthening project.