Search

found 2306 results

Research papers, University of Canterbury Library

Peri-urban environments are critical to the connections between urban and rural ecosystems and their respective communities. Lowland floodplains are important examples that are attractive for urbanisation and often associated with the loss of rural lands and resources. In Christchurch, New Zealand, damage from major earthquakes led to the large-scale abandonment of urban residential properties in former floodplain areas creating a rare opportunity to re-imagine the future of these lands. This has posed a unique governance challenge involving the reassessment of land-use options and a renewed focus on disaster risk and climate change adaptation. Urban-rural tensions have emerged through decisions on relocating residential development, alternative proposals for land uses, and an unprecedented opportunity for redress of degraded traditional values for indigenous (Māori) people. Immediately following the earthquakes, existing statutory arrangements applied to many recovery needs and identified institutional responsibilities. Bespoke legislation was also created to address the scale of impacts. Characteristics of the approach have included attention to information acquisition, iterative assessment of land - use options, and a wide variety of opportunities for community participation. Challenges have included a protracted decision-making process with accompanying transaction costs, and a high requirement for coordination. The case typifies the challenges of achieving ecosystem governance where both urban and rural stakeholders have strong desires and an opportunity to exert influence. It presents a unique context for applying the latest thinking on ecosystem management, adaptation, and resilience, and offers transferable learning for the governance of peri-urban floodplains worldwide.

Research papers, University of Canterbury Library

This research employs a deterministic seismic risk assessment methodology to assess the potential damage and loss at meshblock level in the Christchurch CBD and Mount Pleasant primarily due to building damage caused by earthquake ground shaking. Expected losses in terms of dollar value and casualties are calculated for two earthquake scenarios. Findings are based on: (1) data describing the earthquake ground shaking and microzonation effects; (2) an inventory of buildings by value, floor area, replacement value, occupancy and age; (3) damage ratios defining the performance of buildings as a function of earthquake intensity; (4) daytime and night-time population distribution data and (5) casualty functions defining casualty risk as a function of building damage. A GIS serves as a platform for collecting, storing and analyzing the original and the derived data. It also allows for easy display of input and output data, providing a critical functionality for communication of outcomes. The results of this study suggest that economic losses due to building damage in the Christchurch CBD and Mount Pleasant will possibly be in the order of $5.6 and $35.3 million in a magnitude 8.0 Alpine fault earthquake and a magnitude 7.0 Ashley fault earthquake respectively. Damage to non-residential buildings constitutes the vast majority of the economic loss. Casualty numbers are expected to be between 0 and 10.

Research papers, University of Canterbury Library

This paper presents the probabilistic seismic performance and loss assessment of an actual bridge– foundation–soil system, the Fitzgerald Avenue twin bridges in Christchurch, New Zealand. A two-dimensional finite element model of the longitudinal direction of the system is modelled using advanced soil and structural constitutive models. Ground motions at multiple levels of intensity are selected based on the seismic hazard deaggregation at the site. Based on rigorous examination of several deterministic analyses, engineering demand parameters (EDP’s), which capture the global and local demand, and consequent damage to the bridge and foundation are determined. A probabilistic seismic loss assessment of the structure considering both direct repair and loss of functionality consequences was performed to holistically assess the seismi risk of the system. It was found that the non-horizontal stratification of the soils, liquefaction, and soil–structure interaction had pronounced effects on the seismic demand distribution of the bridge components, of which the north abutment piles and central pier were critical in the systems seismic performance. The consequences due to loss of functionality of the bridge during repair were significantly larger than the direct repair costs, with over a 2% in 50 year probability of the total loss exceeding twice the book-value of the structure.

Research papers, University of Canterbury Library

This study analyses the success and limitations of the recovery process following the 2010–11 earthquake sequence in Christchurch, New Zealand. Data were obtained from in-depth interviews with 32 relocated households in Christchurch, and from a review of recovery policies implemented by the government. A top-down approach to disaster recovery was evident, with the creation of multiple government agencies and processes that made grassroots input into decision-making difficult. Although insurance proceeds enabled the repair and rebuilding of many dwellings, the complexity and adversarial nature of the claim procedures also impaired recovery. Householders’ perceptions of recovery reflected key aspects of their post-earthquake experiences (e.g. the housing offer they received, and the negotiations involved), and the outcomes of their relocation (including the value of the new home, their subjective well-being, and lifestyle after relocation). Protracted insurance negotiations, unfair offers and hardships in post-earthquake life were major challenges to recovery. Less-thanfavourable recovery experiences also transformed patterns of trust in local communities, as relocated householders came to doubt both the government and private insurance companies’ ability to successfully manage a disaster. At the same time, many relocated households expressed trust in their neighbours and communities. This study illuminates how government policies influence disaster recovery while also suggesting a need to reconsider centralised, top-down approaches to managing recovery.

Research papers, University of Canterbury Library

Pumice materials, which are problematic from an engineering viewpoint, are widespread in the central part of the North Island. Considering the impacts of the 2010-2011 Christchurch earthquakes, a clear understanding of their properties under earthquake loading is necessary. For example, the 1987 Edgecumbe earthquake showed evidence of localised liquefaction of sands of volcanic origin. To elucidate on this, research was undertaken to investigate whether existing empirical field-based methods to evaluate the liquefaction potential of sands, which were originally developed for hard-grained soils, are applicable to crushable pumice-rich deposits. For this purpose, two sites, one in Whakatane and another in Edgecumbe, were selected where the occurrence of liquefaction was reported following the Edgecumbe earthquake. Manifestations of soil liquefaction, such as sand boils and ejected materials, have been reported at both sites. Field tests, including cone penetration tests (CPT), shear-wave velocity profiling, and screw driving sounding (SDS) tests were performed at the sites. Then, considering estimated peak ground accelerations (PGAs) at the sites based on recorded motions and possible range of ground water table locations, liquefaction analysis was conducted at the sites using available empirical approaches. To clarify the results of the analysis, undisturbed soil samples were obtained at both sites to investigate the laboratory-derived cyclic resistance ratios and to compare with the field-estimated values. Research results clearly showed that these pumice-rich soils do not fit existing liquefaction assessment frameworks and alternate methods are necessary to characterise them.

Research papers, University of Canterbury Library

This chapter will draw on recent literature and practice experience to discuss the nature of field education in Aotearoa New Zealand. Social work education in this country is provided by academic institutions that are approved by the Social Workers Registration Board. The field education curriculum is therefore shaped by both the regulatory body and the tertiary institutions. Significant numbers of students undertake field education annually which places pressure on industry and raises concerns as to the quality of student experience. Although the importance of field education is undisputed it remains poised in a liminal space between the tertiary education and social service sectors where it is not sufficiently resourced by either. This affects the provision of practice placements as well as the establishment of long-term cross-sector partnerships. Significant events such as the 2010 and 2011 Christchurch earthquakes and recent terrorist attacks have exposed students to different field education experiences signalling the need for programmes to be responsive. Examples of creative learning opportunities in diverse environments, including in indigenous contexts, will be described. Drawing upon recent research, we comment on student and field educator experiences of supervision in the field. Recommendations to further develop social work field education in Aotearoa New Zealand relate to resourcing, infrastructure and quality, support for field educators, and assessment.

Research papers, University of Canterbury Library

Seismic behaviour of typical unreinforced masonry (URM) brick houses, that were common in early last century in New Zealand and still common in many developing countries, is experimentally investigated at University of Canterbury, New Zealand in this research. A one halfscale model URM house is constructed and tested under earthquake ground motions on a shaking table. The model structure with aspect ratio of 1.5:1 in plan was initially tested in the longitudinal direction for several earthquakes with peak ground acceleration (PGA) up to 0.5g. Toppling of end gables (above the eaves line) and minor to moderate cracking around window and door piers was observed in this phase. The structure was then rotated 90º and tested in the transverse (short) direction for ground motions with PGA up to 0.8g. Partial out-of-plane failure of the face loaded walls in the second storey and global rocking of the model was observed in this phase. A finite element analysis and a mechanism analysis are conducted to assess the dynamic properties and lateral strength of the model house. Seismic fragility function of URM houses is developed based on the experimental results. Damping at different phases of the response is estimated using an amplitude dependent equivalent viscous damping model. Financial risk of similar URM houses is then estimated in term of expected annual loss (EAL) following a probabilistic financial risk assessment framework. Risks posed by different levels of damage and by earthquakes of different frequencies are then examined.

Research papers, University of Canterbury Library

© 2017 The Royal Society of New Zealand. This paper discusses simulated ground motion intensity, and its underlying modelling assumptions, for great earthquakes on the Alpine Fault. The simulations utilise the latest understanding of wave propagation physics, kinematic earthquake rupture descriptions and the three-dimensional nature of the Earth's crust in the South Island of New Zealand. The effect of hypocentre location is explicitly examined, which is found to lead to significant differences in ground motion intensities (quantified in the form of peak ground velocity, PGV) over the northern half and southwest of the South Island. Comparison with previously adopted empirical ground motion models also illustrates that the simulations, which explicitly model rupture directivity and basin-generated surface waves, lead to notably larger PGV amplitudes than the empirical predictions in the northern half of the South Island and Canterbury. The simulations performed in this paper have been adopted, as one possible ground motion prediction, in the ‘Project AF8’ Civil Defence Emergency Management exercise scenario. The similarity of the modelled ground motion features with those observed in recent worldwide earthquakes as well as similar simulations in other regions, and the notably higher simulated amplitudes than those from empirical predictions, may warrant a re-examination of regional impact assessments for major Alpine Fault earthquakes.

Images, Alexander Turnbull Library

The cartoon shows Christchurch obscured by ash. Text reads 'Christchurch recovery package' and below are the words 'Cash cloud'. Context - Beginning on the 6th of June the Puyehue-Cordon Caulle volcano has been erupting for more than a week. Drifting ash clouds have been interupting flights. On Thursday 23 June Prime Minister John Key, Canterbury Earthquake Recovery Minister Gerry Brownlee and representatives from engineering consultants Tonkin & Taylor announced the first part of the Government's long-awaited land report that revealed the fate of up to 5000 quake-damaged homes. These homes were in the 'red zone'. But 10,500 owners in the orange zone were left in limbo, with their properties requiring further assessment. One of the options presented to residents in the red zone, ideal for people with replacement policies, was the government bought your land, and you dealt directly with your insurers about your house. However they got a shock when insurers told them they won't replace their homes, they'll only repair them, even though they're earmarked for certain demolition. Quantity: 1 digital cartoon(s).

Research Papers, Lincoln University

"Prior to the devastating 2010-2011 Canterbury earthquakes, the city of Christchurch was already exhibiting signs of a housing affordability crisis. The causes and symptoms were similar to those being experienced in Auckland, but the substantial damage to the housing stock caused by the earthquakes added new dimensions and impetus to the problem. Large swathes of the most affordable housing stock in the east of the city were effectively destroyed by the earthquakes. In itself this would have pushed the mean house price upwards, but compounding problems exacerbated the situation. These include the price effects of reduced supply of both rented and owned housing and increased demand from both displaced residents and an influx of rebuild workers. The need for additional temporary housing while repairs were undertaken and the associated insurance pay-outs bidding up rents with improved rental returns leading to increased interest in property investment. Land supply constraints and consenting issues inhibiting the build of new housing and political infighting and uncertainty regarding the future of parts of the city leading to a flight of development activity to peripheral locations and adjoining local authorities. Concerns that the erosion of the city council rating base combined with inadequacy of insurance cover for infrastructure will lead to large rates increases, increased development costs and reduced amenities and services in future years. These and other issuers will be elaborated on in this paper with a view to exploring the way forward for affordable housing Christchurch City."

Research papers, University of Canterbury Library

Structures of the Lowry Peaks Range - Waikari Valley district are complex. The majority comprise three members of a predominantly WSW -ENE striking major northwards-directed, leading edge imbricate thrust system, with associated angular, asymmetric fault-propagation folds. This system forms anomalously within a large NESW trending belt of structures characterising the entire east coast of north Canterbury, both onshore and offshore and terminates westwards against N-S striking, east facing fold-fault zone. The objectives of this study address the origin, geometry and kinematics of the interaction between these diversely trending systems. Stratigraphy and small-scale structures denote three periods of deformation, namely: i) Middle Cretaceous deformation of the basement rocks, ii) weak Middle Oligocene deformation associated with the inception of the plate boundary through the South Island, and iii) major Pliocene - Recent deformation that formed the majority of the above-mentioned structures. Stress tensor analyses within competent basement and limestone cover rocks suggest two sets of sub-horizontal compression, NE-SW and NW-SE, the former likely to relate to a localised earlier period of deformation, now overprinted by the latter. NW-SE oriented sub-horizontal compression correlates well with results from other parts of north Canterbury. The result of NW-SE compression on the W-E to WSW-ENE striking structures is a large component of oblique motion, which is manifest in four ways: i) movement on two, differently oriented splays rather than a single fault strand, ii) the development of a sinuous trace for a number of the major folds, whereby the ends are oriented normal to the compression direction, the centres parallel to the strike of the faults, iii) the development of a number of cross-folds, striking NNE-SSW and iv) the apparently recent development of a strike-slip component on at least one of the major thrust faults. The origin of the W-E, or WSW-ENE striking structures may be reactivation of Late Cretaceous faults, stratigraphic evidence for the existence of a "structural high" (the Hurunui High) over the majority of the area in the Late Cretaceous to Early Eocene times suggests the formation of a W-E trending horst structure, with a corresponding asymmetric graben to the south. The junction of WSW-ENE trending structures with N-S trending structures to the west centres on an alluvial-filled depression, Waikari Flat, into which the structures of the WSW-ENE trending imbricate thrust system plunge, locally curling to the SW at their ends to link with N-S trending structures to the south. Roof thrusting on two orientations, W-E and N-S, towards to SE is currently occurring above these structures. Currently the area is not highly seismically active, although a magnitude ~6.4 Ms earthquake in historic times has been recorded. The effects of tectonics on the drainage of the area does suggest that the majority of the systems, are still potentially active, albeit moving at a comparatively slow rate. The majority of the recent motion appears to be concentrated on the roof-thrusting occurring in Waikari Flat, and uplift along the Lowry Peaks Fault System. Increasing amounts of secondary movement on back-thrusts and cross fractures is also implied for western ends of the major imbricate thrust system. In contrast, the southern-most fault system appears to be largely sustaining dextral strike-slip motion, with some local folding in central portions.

Research papers, University of Canterbury Library

Spatial variations in river facies exerted a strong influence on the distribution of liquefaction features observed in Christchurch during the 2010-11 Canterbury Earthquake Sequence (CES). Liquefaction and liquefaction-induced ground deformation was primarily concentrated near modern waterways and areas underlain by Holocene fluvial deposits with shallow water tables (< 1 to 2 m). In southern Christchurch, spatial variations of liquefaction and subsidence were documented in the suburbs within inner meander loops of the Heathcote River. Newly acquired geospatial data, geotechnical reports and eye-witness discussions are compiled to provide a detailed account of the surficial effects of CES liquefaction and ground deformation adjacent to the Heathcote River. LiDAR data and aerial photography are used to produce a new series of original figures which reveal the locations of recurrent liquefaction and subsidence. To investigate why variable liquefaction patterns occurred, the distribution of surface ejecta and associated ground damage is compared with near-surface sedimentologic, topographic, and geomorphic variability to seek relationships between the near-surface properties and observed ground damages. The most severe liquefaction was concentrated within a topographic low in the suburb of St Martins, an inner meander loop of the Heathcote River, with liquefaction only minor or absent in the surrounding areas. Subsurface investigations at two sites in St Martins enable documentation of fluvial stratigraphy, the expressions of liquefaction, and identification of pre-CES liquefaction features. Excavation to water table depths (~1.5 m below the surface) across sand boils reveals multiple generations of CES liquefaction dikes and sills that cross-cut Holocene fluvial and anthropogenic stratigraphy. Based on in situ geotechnical tests (CPT) indicating sediment with a factor of safety < 1, the majority of surface ejecta was sourced from well-sorted fine to medium sand at < 5 m depth, with the most damaging liquefaction corresponding with the location of a low-lying sandy paleochannel, a remnant river channel from the Holocene migration of the meander in St Martins. In the adjacent suburb of Beckenham, where migration of the Heathcote River has been laterally confined by topography associated with the volcanic lithologies of Banks Peninsula, severe liquefaction was absent with only minor sand boils occurring closest to the modern river channel. Auger sampling across the suburb revealed thick (>1 m) clay-rich overbank and back swamp sediments that produced a stratigraphy which likely confined the units susceptible to liquefaction and prevented widespread ejection of liquefied material. This analysis suggests river migration promotes the formation and preservation of fluvial deposits prone to liquefaction. Trenching revealed the strongest CES earthquakes with large vertical accelerations favoured sill formation and severe subsidence at highly susceptible locations corresponding with an abandoned channel. Less vulnerable sites containing deeper and thinner sand bodies only liquefied in the strongest and most proximal earthquakes forming minor localised liquefaction features. Liquefaction was less prominent and severe subsidence was absent where lateral confinement of a Heathcote meander has promoted the formation of fluvial stratum resistant to liquefaction. Correlating CES liquefaction with geomorphic interpretations of Christchurch’s Heathcote River highlights methods in which the performance of liquefaction susceptibility models can be improved. These include developing a reliable proxy for estimating soil conditions in meandering fluvial systems by interpreting the geology and geomorphology, derived from LiDAR data and modern river morphology, to improve the methods of accounting for the susceptibility of an area. Combining geomorphic interpretations with geotechnical data can be applied elsewhere to identify regional liquefaction susceptibilities, improve existing liquefaction susceptibility datasets, and predict future earthquake damage.

Audio, Radio New Zealand

Hon PAULA BENNETT to the Prime Minister: Does she stand by all her Government’s statements, policies, and actions? Hon JAMES SHAW to the Minister of Finance: Does he think that an independent Parliamentary Budget Office will improve the standard of democratic debate? Hon MARK MITCHELL to the Minister of Immigration: Does he stand by all his statements and actions in relation to Karel Sroubek? Hon DAVID BENNETT to the Minister of Corrections: Does he stand by his statement “We have never had to manage a prisoner like this before”, in relation to the alleged Christchurch gunman? Dr DUNCAN WEBB to the Minister responsible for the Earthquake Commission: What recent announcement has he made regarding quake-damaged homes in Canterbury? Hon Dr NICK SMITH to the Minister of Justice: Does he stand by all his statements, policies, and actions on electoral law and referenda? Dr SHANE RETI to the Minister of Health: Does he stand by all his statements, policies, and actions around vaccination? RINO TIRIKATENE to the Minister of Health: What progress, if any, has been made in modernising New Zealand’s fleet of air ambulances? Hon PAULA BENNETT to the Prime Minister: Does she stand by all her Government’s statements, policies, and actions? Dr SHANE RETI to the Minister of Education: Does he stand by all his statements, policies, and actions around the Reform of Vocational Education? GINNY ANDERSEN to the Minister of Commerce and Consumer Affairs: What reports has he seen about responses to the draft report of the Commerce Commission on the New Zealand fuel market? BRETT HUDSON to the Associate Minister of Transport: What is the petrol price exclusive of taxes and carbon charges assumed in the reference scenario in the preliminary cost-benefit analysis of the Clean Car Discount for August 2019, and how does this compare to the actual present petrol price exclusive of taxes and carbon charges?

Research papers, University of Canterbury Library

The context of this study is the increasing need for public transport as issues over high private vehicle usage are becoming increasingly obvious. Public transport services need to compete with private transport to improve patronage, and issues with reliability need to be addressed. Bus bunching affects reliability through disruptions to the scheduled headways. The purpose of this study was to collect and analyse data to compare how travel time and dwell time vary, to explore the variation of key variables, and to better understand the sources of these variations. The Orbiter bus service in Christchurch was used as a case study, as it is particularly vulnerable to bus bunching. The dwell time was found to be more variable than travel time. It appeared the Canterbury earthquake had significantly reduced the average speeds for the Orbiter service. In 1964, Newell and Potts described a basic bus bunching theory, which was used as the basis for an Excel bus bunching model. This model allows input variables to vary stochastically. Random values were generated from four specified distributions derived from manually collected data, allowing variance across all bus platforms and buses. However the complexity resulted in stability and difficulty in achieving convergence, so the model was run in single Monte Carlo simulations. The outputs were realistic and showed a higher degree of bunching behaviour than previous models. The model demonstrated bunching phenomena that had not been observed in previous models, including spontaneously un-pairing, overtaking of buses delayed at platforms, and odd-numbered bunches of three buses. Furthermore, the study identified areas of further research for data collection and model development.

Research papers, University of Canterbury Library

After a high-intensity seismic event, inspections of structural damages need to be carried out as soon as possible in order to optimize the emergency management, as well as improving the recovery time. In the current practice, damage inspections are performed by an experienced engineer, who physically inspect the structures. This way of doing not only requires a significant amount of time and high skilled human resources, but also raises the concern about the inspector’s safety. A promising alternative is represented using new technologies, such as drones and artificial intelligence, which can perform part of the damage classification task. In fact, drones can safely access high hazard components of the structures: for instance, bridge piers or abutments, and perform the reconnaissance by using highresolution cameras. Furthermore, images can be automatically processed by machine learning algorithms, and damages detected. In this paper, the possibility of applying such technologies for inspecting New Zealand bridges is explored. Firstly, a machine-learning model for damage detection by performing image analysis is presented. Specifically, the algorithm was trained to recognize cracks in concrete members. A sensitivity analysis was carried out to evaluate the algorithm accuracy by using database images. Depending on the confidence level desired,i.e. by allowing a manual classification where the alghortim confidence is below a specific tolerance, the accuracy was found reaching up to 84.7%. In the second part, the model is applied to detect the damage observed on the Anzac Bridge (GPS coordinates -43.500865, 172.701138) in Christchurch by performing a drone reconnaissance. Reults show that the accuracy of the damage detection was equal to 88% and 63% for cracking and spalling, respectively.

Research papers, University of Canterbury Library

Since the early 1980s seismic hazard assessment in New Zealand has been based on Probabilistic Seismic Hazard Analysis (PSHA). The most recent version of the New Zealand National Seismic Hazard Model, a PSHA model, was published by Stirling et al, in 2012. This model follows standard PSHA principals and combines a nation-wide model of active faults with a gridded point-source model based on the earthquake catalogue since 1840. These models are coupled with the ground-motion prediction equation of McVerry et al (2006). Additionally, we have developed a time-dependent clustering-based PSHA model for the Canterbury region (Gerstenberger et al, 2014) in response to the Canterbury earthquake sequence. We are now in the process of revising that national model. In this process we are investigating several of the fundamental assumptions in traditional PSHA and in how we modelled hazard in the past. For this project, we have three main focuses: 1) how do we design an optimal combination of multiple sources of information to produce the best forecast of earthquake rates in the next 50 years: can we improve upon a simple hybrid of fault sources and background sources, and can we better handle the uncertainties in the data and models (e.g., fault segmentation, frequency-magnitude distributions, time-dependence & clustering, low strain-rate areas, and subduction zone modelling)? 2) developing revised and new ground-motion predictions models including better capturing of epistemic uncertainty – a key focus in this work is developing a new strong ground motion catalogue for model development; and 3) how can we best quantify if changes we have made in our modelling are truly improvements? Throughout this process we are working toward incorporating numerical modelling results from physics based synthetic seismicity and ground-motion models.

Research papers, University of Canterbury Library

We examined changes in psychological distress experienced by residents of Christchurch following two catastrophic earthquakes in late 2010 and early 2011, using data from the New Zealand Attitudes and Values Study (NZAVS), a national probability panel study of New Zealand adults. Analyses focused on the 267 participants (172 women, 95 men) who were living in central Christchurch in 2009 (i.e., before the Christchurch earthquakes), and who also provided complete responses to our yearly panel questionnaire conducted in late 2010 (largely between the two major earthquakes), late 2011, and late 2012. Levels of psychological distress were similar across the different regions of central Christchurch immediately following the September 2010 earthquake, and remained comparable across regions in 2011. By late 2012, however, average levels of psychological distress in the regions had diverged as a function of the amount of property damage experienced within each given region. Specifically, participants in the least damaged region (i.e., the Fendalton-Waimairi and Riccarton-Wigram wards) experienced greater drops in psychological distress than did those in the moderately damaged region (i.e., across the Spreydon-Heathcote and Hagley- Ferrymead wards). However, the level of psychological distress reported by participants in the most damaged region (i.e., across Shirley-Papanui and Burwood-Pegasus) were not significantly different to those in the least damaged region of central Christchurch. These findings suggest that different patterns of psychological recovery emerged across the different regions of Christchurch, with the moderately damaged region faring the worst, but only after the initial shock of the destruction had passed.

Research papers, University of Canterbury Library

In recent Canterbury earthquakes, structures have performed well in terms of life safety but the estimated total cost of the rebuild was as high as $40 billion. The major contributors to this cost are repair/demolition/rebuild cost, the resulting downtime and business interruption. For this reason, the authors are exploring alternate building systems that can minimize the downtime and business interruption due to building damage in an earthquake; thereby greatly reducing the financial implications of seismic events. In this paper, a sustainable and demountable precast reinforced concrete (RC) frame system in which the precast members are connected via steel tubes/plates or steel angles/plates and high strength friction grip (HSFG) bolts is introduced. In the proposed system, damaged structural elements in seismic frames can be easily replaced with new ones; thereby making it an easily and quickly repairable and a low-loss system. The column to foundation connection in the proposed system can be designed either as fixed or pinned depending on the requirement of strength and stiffness. In a fixed base frame system, ground storey columns will also be damaged along with beams in seismic events, which are to be replaced after seismic events; whereas in a pin base frame only beams (which are easy to replace) will be damaged. Low to medium rise (3-6 storey) precast RC frame buildings with fixed and pin bases are analyzed in this paper; and their lateral capacity, lateral stiffness and natural period are scrutinized to better understand the pros and cons of the demountable precast frame system with fixed and pin base connections.

Research papers, University of Canterbury Library

The magnitude Mw7.8 ‘Kaikōura’ earthquake occurred shortly after midnight on 14 November 2016. This paper presents an overview of the geotechnical impacts on the South Island of New Zealand recorded during the postevent reconnaissance. Despite the large moment magnitude of this earthquake, relatively little liquefaction was observed across the South Island, with the only severe manifestation occurring in the young, loose alluvial deposits in the floodplains of the Wairau and Opaoa Rivers near Blenheim. The spatial extent and volume of liquefaction ejecta across South Island is significantly less than that observed in Christchurch during the 2010-2011 Canterbury Earthquake Sequence, and the impact of its occurrence to the built environment was largely negligible on account of the severe manifestations occurring away from the areas of major development. Large localised lateral displacements occurred in Kaikōura around Lyell Creek. The soft fine-grained material in the upper portions of the soil profile and the free face at the creek channel were responsible for the accumulation of displacement during the ground shaking. These movements had severely impacted the houses which were built close (within the zone of large displacement) to Lyell Creek. The wastewater treatment facility located just north of Kaikōura also suffered tears in the liners of the oxidation ponds and distortions in the aeration system due to ground movements. Ground failures on the Amuri and Emu Plains (within the Waiau Valley) were small considering the large peak accelerations (in excess of 1g) experienced in the area. Minor to moderate lateral spreading and ejecta was observed at some bridge crossings in the area. However, most of the structural damage sustained by the bridges was a result of the inertial loading, and the damage resulting from geotechnical issues were secondary.

Research Papers, Lincoln University

Creative temporary or transitional use of vacant urban open spaces is seldom foreseen in traditional urban planning and has historically been linked to economic or political disturbances. Christchurch, like most cities, has had a relatively small stock of vacant spaces throughout much of its history. This changed dramatically after an earthquake and several damaging aftershocks hit the city in 2010 and 2011; temporary uses emerged on post-earthquake sites that ran parallel to the “official” rebuild discourse and programmes of action. The paper examines a post-earthquake transitional community-initiated open space (CIOS) in central Christchurch. CIOS have been established by local community groups as bottom-up initiatives relying on financial sponsorship, agreements with local landowners who leave their land for temporary projects until they are ready to redevelop, and volunteers who build and maintain the spaces. The paper discusses bottom-up governance approaches in depth in a single temporary post-earthquake community garden project using the concepts of community resilience and social capital. The study analyses and highlights the evolution and actions of the facilitating community organisation (Greening the Rubble) and the impact of this on the project. It discusses key actors’ motivations and values, perceived benefits and challenges, and their current involvement with the garden. The paper concludes with observations and recommendations about the initiation of such projects and the challenges for those wishing to study ephemeral social recovery phenomena.

Research papers, The University of Auckland Library

The 2010–2011 Canterbury earthquakes, which involved widespread damage during the February 2011 event and ongoing aftershocks near the Christchurch Central Business District, left this community with more than $NZD 40 billion in losses (~20 % GDP), demolition of approximately 60 % of multi-storey concrete buildings (3 storeys and up), and closure of the core business district for over 2 years. The aftermath of the earthquake sequence has revealed unique issues and complexities for the owners of commercial and multi-storey residential buildings in relation to unexpected technical, legal, and financial challenges when making decisions regarding the future of their buildings impacted by the earthquakes. The paper presents a framework to understand the factors influencing post-earthquake decisions (repair or demolish) on multi-storey concrete buildings in Christchurch. The study, conducted in 2014, includes in-depth investigations on 15 case-study buildings using 27 semi-structured interviews with various property owners, property managers, insurers, engineers, and government authorities in New Zealand. The interviews revealed insights regarding the multitude of factors influencing post-earthquake decisions and losses. As expected, the level of damage and repairability (cost to repair) generally dictated the course of action. There is strong evidence, however, that other variables have significantly influenced the decision on a number of buildings, such as insurance, business strategies, perception of risks, building regulations (and compliance costs), and government decisions. The decision-making process for each building is complex and unique, not solely driven by structural damage. Furthermore, the findings have put the spotlight on insurance policy wordings and the paradoxical effect of insurance on the recovery of Christchurch, leading to other challenges and issues going forward.

Research papers, The University of Auckland Library

During the recent devastating earthquakes in Christchurch, many residential houses were damaged due to widespread liquefaction of the ground. In-situ testing is widely used as a convenient method for evaluating liquefaction potential of soils. Cone penetration test (CPT) and standard penetration test (SPT) are the two popular in situ tests which are widely used in New Zealand for site characterization. The Screw Driving Sounding (SDS) method is a relatively new operating system developed in Japan consisting of a machine that drills a rod into the ground by applying torque at seven steps of axial loading. This machine can continuously measure the required torque, load, speed of penetration and rod friction during the test, and therefore can give a clear overview of the soil profile along the depth of penetration. In this paper, based on a number of SDS tests conducted in Christchurch, a correlation was developed between tip resistance of CPT test and SDS parameters for layers consisting of different fines contents. Moreover, using the obtained correlation, a chart was proposed which relates the cyclic resistance ratio to the appropriate SDS parameter. Using the proposed chart, liquefaction potential of soil can be estimated directly using SDS data. As SDS method is simpler, faster and more economical test than CPT and SPT, it can be a reliable alternative in-situ test for soil characterization, especially in residential house constructions.

Research papers, Victoria University of Wellington

We aim to investigate the role of insurance in business recovery following the devastating Christchurch earthquake in February, 22nd, 2011. We analyze data from two business surveys conducted after the earthquake to examine how insurance affected business operation in the aftermath of the earthquake both in the short-term and longer-term. For the short-term analysis, we use a combination of propensity score matching (PSM) and linear probability model (LPM) to analyze the data. We first estimate the propensity scores for insurance take-up of each firm conditional on the firm’s individual characteristics. Stratification based on the estimated propensity scores is used to match the treated (insured) and the control (uninsured) firms. We then estimate the probability of firms’ continuing operations with a set of control variables to account for the level of damage and disruption caused by the quake in each stratum. We find little evidence of any beneficial effect of insurance coverage on business continuity in the short-run. For the longer-term analysis, we analyze the available survey data using logistic regression. The result suggests that business interruption insurance significantly promotes increased level of long-term productivity for surviving firms following the earthquake.

Research papers, University of Canterbury Library

Sewerage systems convey sewage, or wastewater, from residential or commercial buildings through complex reticulation networks to treatment plants. During seismic events both transient ground motion and permanent ground deformation can induce physical damage to sewerage system components, limiting or impeding the operability of the whole system. The malfunction of municipal sewerage systems can result in the pollution of nearby waterways through discharge of untreated sewage, pose a public health threat by preventing the use of appropriate sanitation facilities, and cause serious inconvenience for rescuers and residents. Christchurch, the second largest city in New Zealand, was seriously affected by the Canterbury Earthquake Sequence (CES) in 2010-2011. The CES imposed widespread damage to the Christchurch sewerage system (CSS), causing a significant loss of functionality and serviceability to the system. The Christchurch City Council (CCC) relied heavily on temporary sewerage services for several months following the CES. The temporary services were supported by use of chemical and portable toilets to supplement the damaged wastewater system. The rebuild delivery agency -Stronger Christchurch Infrastructure Rebuild Team (SCIRT) was created to be responsible for repair of 85 % of the damaged horizontal infrastructure (i.e., water, wastewater, stormwater systems, and roads) in Christchurch. Numerous initiatives to create platforms/tools aiming to, on the one hand, support the understanding, management and mitigation of seismic risk for infrastructure prior to disasters, and on the other hand, to support the decision-making for post-disaster reconstruction and recovery, have been promoted worldwide. Despite this, the CES in New Zealand highlighted that none of the existing platforms/tools are either accessible and/or readable or usable by emergency managers and decision makers for restoring the CSS. Furthermore, the majority of existing tools have a sole focus on the engineering perspective, while the holistic process of formulating recovery decisions is based on system-wide approach, where a variety of factors in addition to technical considerations are involved. Lastly, there is a paucity of studies focused on the tools and frameworks for supporting decision-making specifically on sewerage system restoration after earthquakes. This thesis develops a decision support framework for sewerage pipe and system restoration after earthquakes, building on the experience and learning of the organisations involved in recovering the CSS following the CES in 2010-2011. The proposed decision support framework includes three modules: 1) Physical Damage Module (PDM); 2) Functional Impact Module (FIM); 3) Pipeline Restoration Module (PRM). The PDM provides seismic fragility matrices and functions for sewer gravity and pressure pipelines for predicting earthquake-induced physical damage, categorised by pipe materials and liquefaction zones. The FIM demonstrates a set of performance indicators that are categorised in five domains: structural, hydraulic, environmental, social and economic domains. These performance indicators are used to assess loss of wastewater system service and the induced functional impacts in three different phases: emergency response, short-term recovery and long-term restoration. Based on the knowledge of the physical and functional status-quo of the sewerage systems post-earthquake captured through the PDM and FIM, the PRM estimates restoration time of sewer networks by use of restoration models developed using a Random Forest technique and graphically represented in terms of restoration curves. The development of a decision support framework for sewer recovery after earthquakes enables decision makers to assess physical damage, evaluate functional impacts relating to hydraulic, environmental, structural, economic and social contexts, and to predict restoration time of sewerage systems. Furthermore, the decision support framework can be potentially employed to underpin system maintenance and upgrade by guiding system rehabilitation and to monitor system behaviours during business-as-usual time. In conjunction with expert judgement and best practices, this framework can be moreover applied to assist asset managers in targeting the inclusion of system resilience as part of asset maintenance programmes.

Audio, Radio New Zealand

Questions to Ministers 1. CRAIG FOSS to the Minister of Finance: What reports has he received on the economy moving away from government spending, housing speculation and borrowing, and towards savings and exporting? 2. Hon PETE HODGSON to the Prime Minister: Does he stand by his answer to question No 11 yesterday that Sammy Wong did not accompany Pansy Wong on any ministerial trips to China? 3. HONE HARAWIRA to the Associate Minister of Health: What is the rationale behind the move to prohibit the display of tobacco products for sale in retail outlets? 4. Hon DARREN HUGHES to the Minister of Transport: Has he received any feedback or information in support of lowering the adult blood alcohol concentration to 0.05 that has given him any doubt or cause for reflection this year about his decision to retain the level at 0.08? 5. TIM MACINDOE to the Minister of Housing: What recent announcement has he made about the direction of social housing in New Zealand? 6. BRENDON BURNS to the Minister for Canterbury Earthquake Recovery: Is the Government's response package, announced last week to assist Canterbury businesses affected by the 4 September earthquake, universally supported by the Government and its supporters? 7. CATHERINE DELAHUNTY to the Minister for Social Development and Employment: Does she agree with the Alternative Welfare Working Group that welfare reform should be focused on "the relentless pursuit of well-being"? 8. Hon NANAIA MAHUTA to the Minister of Energy and Resources: Will the mining of lignite form part of his New Zealand Energy Strategy? 9. LOUISE UPSTON to the Minister of Education: What were the results of the Programme for International Assessment (PISA), which looked at New Zealand students' achievement in reading, maths and scientific literacy? 10. DARIEN FENTON to the Minister of Transport: How many emails has he received on the decision of the New Zealand Transport Agency to start charging CarJam and similar web-based information services for accessing the Agency's stored basic motor vehicle information? 11. JACQUI DEAN to the Minister of Agriculture: What recent steps has the Government taken to control bovine TB? 12. Hon TREVOR MALLARD to the Minister of Education: Which Minister is to be responsible for the enforcement of the Education Act 1989 in relation to limited attendance early childhood centres following the passing of the Education Amendment Bill (No 2)? Questions to Members 1. Hon DAVID CUNLIFFE to the Chairperson of the Finance and Expenditure Committee: How many submissions have been received on the Student Loan Scheme Bill? 2. Hon DAVID CUNLIFFE to the Chairperson of the Finance and Expenditure Committee: How many submitters on the Student Loan Scheme Bill have requested to be heard in person? 3. CHRIS HIPKINS to the Chairperson of the Local Government and Environment Committee: How many submissions have been received on the Sustainable Biofuel Bill? 4. CHRIS HIPKINS to the Chairperson of the Local Government and Environment Committee: How many submitters on the Sustainable Biofuel Bill have requested to be heard in person? 5. CHRIS HIPKINS to the Chairperson of the Local Government and Environment Committee: How many submissions have been received on the Southland District Council (Stewart Island/Rakiura Visitor Levy) Empowering Bill? 6. CHRIS HIPKINS to the Chairperson of the Local Government and Environment Committee: How many submitters on the Southland District Council (Stewart Island/Rakiura Visitor Levy) Empowering Bill have requested to be heard in person? 7. CHRIS HIPKINS to the Chairperson of the Government Administration Committee: How many submissions have been received on the Identity Information Confirmation Bill? 8. CHRIS HIPKINS to the Chairperson of the Government Administration Committee: How many submitters on the Identity Information Confirmation Bill have requested to be heard in person? 9. Hon PAREKURA HOROMIA to the Chairperson of the Māori Affairs Committee: How many submissions have been received on the Marine and Coastal Area (Takutai Moana) Bill? 10. Hon PAREKURA HOROMIA to the Chairperson of the Māori Affairs Committee: How many submitters on the Marine and Coastal Area (Takutai Moana) Bill have requested to be heard in person? 11. Hon DAVID CUNLIFFE to the Chairperson of the Finance and Expenditure Committee: Has the Finance and Expenditure Committee conducted the 2009/10 financial review of the Office of the Retirement Commissioner? 12. DARIEN FENTON to the Chairperson of the Transport and Industrial Relations Committee: How many submissions have been received on the Land Transport (Driver Licensing) Amendment Bill? 13. DARIEN FENTON to the Chairperson of the Transport and Industrial Relations Committee: How many submitters on the Land Transport (Driver Licensing) Amendment Bill have requested to be heard in person? 14. DARIEN FENTON to the Chairperson of the Transport and Industrial Relations Committee: How many submissions have been received on the Land Transport (Road Safety and Other Matters) Amendment Bill? 15. Hon DAVID PARKER to the Chairperson of the Justice and Electoral Committee: How many submissions have been received on the Lawyers and Conveyancers Amendment Bill? 16. Hon DAVID PARKER to the Chairperson of the Justice and Electoral Committee: How many submitters on the Lawyers and Conveyancers Amendment Bill have requested to be heard in person? 17. Hon DAVID PARKER to the Chairperson of the Justice and Electoral Committee: How many submissions have been received on the Legal Services Bill? 18. Hon DAVID PARKER to the Chairperson of the Justice and Electoral Committee: How many submitters on the Legal Services Bill have requested to be heard in person? 19. Hon DAVID PARKER to the Chairperson of the Justice and Electoral Committee: How many submissions have been received on the Sale and Supply of Liquor and Liquor Enforcement Bill? 20. Hon DAVID PARKER to the Chairperson of the Justice and Electoral Committee: How many submitters on the Sale and Supply of Liquor and Liquor Enforcement Bill have requested to be heard in person? 21. Hon DAMIEN O'CONNOR to the Chairperson of the Primary Production Committee: How many submissions have been received on the Food Bill? 22. Hon DAMIEN O'CONNOR to the Chairperson of the Primary Production Committee: How many submitters on the Food Bill have requested to be heard in person? 23. Hon DAMIEN O'CONNOR to the Chairperson of the Primary Production Committee: How many submissions have been received on the Dairy Industry Restructuring (New Sunset Provisions) Amendment Bill? 24. Hon DAMIEN O'CONNOR to the Chairperson of the Primary Production Committee: How many submitters on the Dairy Industry Restructuring (New Sunset Provisions) Amendment Bill have requested to be heard in person?

Audio, Radio New Zealand

Hon JUDITH COLLINS to the Prime Minister: Does she stand by all her Government’s statements and actions? HELEN WHITE to the Minister of Finance: What recent reports has he seen on the New Zealand economy? Hon PAUL GOLDSMITH to the Minister of Education: Does he stand by all his statements and policies on education? GINNY ANDERSEN to the Minister of Housing: What recent announcements has she made about the Government’s transitional housing programme? NICOLA WILLIS to the Minister of Housing: Has the Government kept the commitment made in the 2017 Speech from the Throne to develop a ‘Rent to Own’ scheme; if so, how many families has the scheme helped into houses since then? ANAHILA KANONGATA'A-SUISUIKI to the Minister for Social Development and Employment: What support has the Ministry of Social Development provided to people and families affected by recent COVID-19 restrictions? NICOLE McKEE to the Minister of Police: Will Government actions reduce gang crime and gang numbers this year? IBRAHIM OMER to the Lead Coordination Minister for the Government's Response to the Royal Commission's Report into the Terrorist Attack on the Christchurch Mosques: What recent engagement has there been with the Muslim and other ethnic communities on the Royal Commission of Inquiry into the terrorist attack on Christchurch masjidain? SIMEON BROWN to the Minister of Police: Does she stand by her commitment to achieve the Striving Towards 1800 New Police initiative; if so, when will she achieve this initiative? TEANAU TUIONO to the Minister for Economic and Regional Development: What advice, if any, has he received about the upcoming launch in New Zealand of a satellite that includes the “Gunsmoke-J” payload from the United States Army’s Space and Missile Defense Command? MARJA LUBECK to the Minister for Workplace Relations and Safety: What recent announcements has he made about improving the Holidays Act 2003? TIM VAN DE MOLEN to the Minister for Building and Construction: How many applications has the Residential Earthquake-Prone Building Financial Assistance Scheme had since its inception in September last year, and how much has been appropriated for the scheme?

Research papers, University of Canterbury Library

On 22 February 2011,a magnitude Mw 6.3 earthquake occurred with an epicenter located near Lyttelton at about 10km from Christchurch in Canterbury region on the South Island of New Zealand (Figure 1). Since this earthquake occurred in the midst of the aftershock activity which had continued since the 4 September 2010 Darfield Earthquake occurrence, it was considered to be an aftershock of the initial earthquake. Because of the short distance to the city and the shallower depth of the epicenter, this earthquake caused more significant damage to pipelines, traffic facilities, residential houses/properties and multi-story buildings in the central business district than the September 2010 Darfield Earthquake in spite of its smaller earthquake magnitude. Unfortunately, this earthquake resulted in significant number of casualties due to the collapse of multi-story buildings and unreinforced masonry structures in the city center of Christchurch. As of 4 April, 172 casualties were reported and the final death toll is expected to be 181. While it is extremely regrettable that Christchurch suffered a terrible number of victims, civil and geotechnical engineers have this hard-to-find opportunity to learn the response of real ground from two gigantic earthquakes which occurred in less than six months from each other. From geotechnical engineering point of view, it is interesting to discuss the widespread liquefaction in natural sediments, repeated liquefaction within short period and further damage to earth structures which have been damaged in the previous earthquake. Following the earthquake, an intensive geotechnical reconnaissance was conducted to capture evidence and perishable data from this event. The team included the following members: Misko Cubrinovski (University of Canterbury, NZ, Team Leader), Susumu Yasuda (Tokyo Denki University, Japan, JGS Team Leader), Rolando Orense (University of Auckland, NZ), Kohji Tokimatsu (Tokyo Institute of Technology, Japan), Ryosuke Uzuoka (Tokushima University, Japan), Takashi Kiyota (University of Tokyo, Japan), Yasuyo Hosono (Toyohashi University of Technology, Japan) and Suguru Yamada (University of Tokyo, Japan).

Research papers, University of Canterbury Library

Organisations locate strategically within Business Districts (CBDs) in order to cultivate their image, increase their profile, and improve access to customers, suppliers, and services. While CBDs offer an economic benefit to organisations, they also present a unique set of hazard vulnerabilities and planning challenges for businesses. As of May 2012, the Christchurch CBD has been partially cordoned off for over 14 months. Economic activity within the cordoned CBD, which previously contained 6,000 businesses and over 51,000 workers, has been significantly diminished and organisations have been forced to find new ways of operating. The vulnerabilities and resilience of CBDs not only influences outcomes for CBD organisations, but also the broader interconnected (urban/regional/national) system. A CBD is a hub of economic, social, and built infrastructure within a network of links and nodes. When the hub is disrupted all of the people, objects, and transactions that usually flow into and out of the hub must be redirected elsewhere. In an urban situation this means traffic jams in peripheries of the city, increased prices of commercial property, and capital flight; all of which are currently being faced in Canterbury. This report presents the lessons learned from organisations in CBDs affected by the Canterbury earthquakes. Here we focus on the Christchurch CBD; however, several urban town centres were extensively disrupted by the earthquakes. The statistics and discussion presented in this report are based on the results of an ongoing study conducted by Resilient Organisations (www.resorgs.org.nz). The data was captured using two questionnaire surveys of Canterbury organisations (issued November 2010 and May 2011), interviews with key informants, and in-depth case studies of organisations. Several industry sectors were sampled, and geographic samples of organisations in the Christchurch CBD, Lyttelton, and the Kaiapoi town centre were also collected. Results in this report describing “non-CBD organisations” refer to all organisations outside of the Christchurch CBD, Lyttelton, and Kaiapoi town centres.

Research papers, University of Canterbury Library

Farming and urban regions are impacted by earthquake disasters in different ways, and feature a range of often different recovery requirements. In New Zealand, and elsewhere, most earthquake impact and recovery research is urban focused. This creates a research deficit that can lead to the application of well-researched urban recovery strategies in rural areas to suboptimal effect. To begin to reduce this deficit, in-depth case studies of the earthquake impacts and recovery of three New Zealand farms severely impacted by the 14th November 2016, M7.8 Hurunui-Kaikōura earthquake were conducted. The initial earthquake, its aftershocks and coseismic hazards (e.g., landslides, liquefaction, surface rupture) affected much of North Canterbury, Marlborough and the Wellington area. The three case study farms were chosen to broadly represent the main types of farming and topography in the Hurunui District in North Canterbury. The farms were directly and indirectly impacted by earthquakes and related hazards. On-farm infrastructure (e.g., woolsheds, homesteads) and essential services (e.g., water, power), frequently sourced from distributed networks, were severely impacted. The earthquake occurred after two years of regional drought had already stressed farm systems and farmers to restructuring or breaking point. Cascading interlinked hazards stemming from the earthquakes and coseismic hazards continued to disrupt earthquake recovery over a year after the initial earthquake. Semi-structured interviews with the farmers were conducted nine and fourteen months after the initial earthquake to capture the timeline of on-going impacts and recovery. Analysis of both geological hazard data and interview data resulted in the identification of key factors influencing farm level earthquake impact and recovery. These include pre-existing conditions (e.g., drought); farm-specific variations in recovery timelines; and resilience strategies for farm recovery resources. The earthquake recovery process presented all three farms with opportunities to change their business plans and adapt to mitigate on-going and future risk.

Research papers, University of Canterbury Library

During the past two decades, the focus has been on the need to provide communities with structures that undergo minimal damage after an earthquake event while still being cost competitive. This has led to the development of high performance seismic resisting systems, and advances in design methodologies, in order respect this demand efficiently. This paper presents the experimental response of four pre-cast, post-tensioned rocking wall systems tested on the shake-table at the University of Canterbury. The wall systems were designed as a retrofit solution for an existing frame building, but are equally applicable for use in new design. Design of the wall followed a performance-based retrofit strategy in which structural limit states appropriate to both the post-tensioned wall and the existing building were considered. Dissipation for each of the four post-tensioned walls was provided via externally mounted devices, located in parallel to post-tensioned tendons for re-centring. This allowed the dissipation devices to be easily replaced or inspected following a major earthquake. Each wall was installed with viscous fluid dampers, tension-compression yielding steel dampers, a combination of both or no devices at all – thus relying on contact damping alone. The effectiveness of both velocity and displacement dependant dissipation are investigated for protection against far-field and velocity-pulse ground motion characteristics. The experimental results validate the behaviour of ‘Advanced Flag-Shape’ rocking, dissipating solutions which have been recently proposed and numerically tested. Maximum displacements and material strains were well controlled and within acceptable bounds, and residual deformations were minimal due to the re-centring contribution from the post-tensioned tendons. Damage was confined to inelastic yielding (or fluid damping) of the external dampers.