A poster which outlines the dewatering process.
A design guideline which defined the role of the technical forums within SCIRT.
A research project which presents the traffic and transport planning that has been undertaken to achieve the overarching goal of rebuilding Christchurch, whilst keeping the traffic moving.
A memorandum which summarises the outcomes of the SCIRT/New Zealand Red Cross introductory session and the design thinking workshop.
A document which sets out the 12d standards at SCIRT.
A pdf copy of a PowerPoint presentation used by Duncan Gibb when presenting his Brunel lecture.
A pdf copy of a SCIRT school visit feedback form from Richmond Primary School.
A magazine article which outlines the observations of engineers working on SCIRT retaining wall and ground improvement projects.
A diagram which shows outputs from SCIRT's March 2012 capability survey, detailing the number and type of positions that needed to be filled.
A document which summarises the outcomes of the SCIRT/New Zealand Red Cross Datasync project collaboration.
A PowerPoint presentation which evaluates and analyses the effectiveness of The Lonely Cone Recall campaign.
A document describing the use of 3D modelling for construction methodology.
A guideline to inform designers of the pipe profilometer operation, including requesting profile surveys, standards and assessments of the survey results.
A copy of the plan, created in 2011, detailing how the rebuild of the three waters and road infrastructure was to be coordinated with other utility operators.
A best practice traffic management guideline, produced in February 2014, which helps traffic management team members slow motorists through road work sites safely.
An award submission nominating SCIRT for the 2016 New Zealand Spatial Excellence Awards: Category: Award for Technical Excellence.
A promotional brochure explaining the Forward Works Viewer and that the tool was a key to cost-effective and efficient project delivery in Christchurch.
A formal guideline to dewatering.
An example of a checklist used by SCIRT traffic management teams to perform site checks.
A document which describes the process that SCIRT took to work with industry organisations to develop a civil trade qualification.
A flyer which was attached to an email inviting people to the Humaneers action learning group.
An example of a tool SCIRT has used to communicate its projects to a community.
A plan which outlines the function, roles and responsibilities of SCIRT during an emergency event affecting SCIRT construction works. The first version of this plan was produced on 30 April 2012. Note that personal details of key personnel have been removed from this document.
A plan which aims to ensure an environment of Zero Harm on SCIRT worksites. The first version of this plan was produced on 29 July 2011.
A document which describes SCIRT's experience with the trenchless technology of pipe lining.
This document contains a list of the roles of people that have requested access to the SCIRT GIS viewer.
A design guideline which provides guidance to project definition and design teams on how to use Pipe Damage Assessment Tool (PDAT) outputs in their scoping and concept design work.
A document providing an overview of the SCIRT Communication Team, including its purpose, objectives and decision-making processes.
A document that outlines objectives and ways of working collaboratively, which team members signed to show their commitment.
An advertisement from April 2016 informing residents that local businesses are still open, despite detours and roadworks.