Photograph captioned by BeckerFraserPhotos, "The plaque listing the mayors of Christchurch on the wall of the old City Council Civic Offices on Manchester Street".
A crane working on a brick building in the Christchurch central city. A sign on the fence reads, "Quake repairs, keep out, for your own safety".
A photograph of an earthquake damaged building in the Christchurch central city. Some of the windows have broken and have been covered with plastic and tape.
A photograph of volunteers from the Wellington Emergency Management Office standing on a pile of bricks from an earthquake-damaged building in the Christchurch central city.
A pdf copy of a PowerPoint presentation prepared for the Christchurch City Council and CPG New Zealand, providing an overview of the investigation work completed.
Aerial image of the Christchurch central city taken by the Royal New Zealand Air Force for the Earthquake Commission. The Hotel Grand Chancellor can be seen.
An aerial photograph looking west over the northern part of the Christchurch central city with Bealey Avenue to the right and Hagley Park in the distance.
Aftermath of September 4th Earthquake in Canterbury (area covers Christchurch City) NZ. Empty fuel tanks lifted out of forecourt at petrol station on Pages Road.
Two days after the 22 February 2011 M6.3 earthquake in Christchurch, New Zealand, three of the authors conducted a transect of the central city, with the goal of deriving an estimate of building damage levels. Although smaller in magnitude than the M7.1 4 September 2010 Darfield earthquake, the ground accelerations, ground deformation and damage levels in Christchurch central city were more severe in February 2011, and the central city was closed down to the general public. Written and photographic notes of 295 buildings were taken, including construction type, damage level, and whether the building would likely need to be demolished. The results of the transect compared favourably to Civil Defence rapid assessments made over the following month. Now, more than one year and two major aftershocks after the February 2011 earthquake these initial estimates are compared to the current demolition status to provide an updated understanding of the state of central Christchurch.
A photograph of signs on the side of the Christchurch Art Gallery. The art gallery served as the temporary headquarters for Civil Defence after the 22 February 2011 earthquake. The signs read, "Media Info, Christchurch Earthquake Response" and "Media Briefings, every day 10:30 and 17:30 hours in auditorium". There is also a map showing access points into the central city.
View of the central library from Gloucester Street. USAR codes can be seen in the bottom right corner.
The entrance to the central Library on Gloucester Street has been boarded up and USAR codes have been spray-painted on the concrete pillar. A 'Library open' sign remains outside.
A photograph of participants in the walk to celebrate Chinese National Day and the Moon Festival. In the foreground, there is a man holding a Chinese flag. Behind him there are two people wearing panda bear costumes. The walk was held at the Upper Riccarton Library in September 2015. It was organised by the Canterbury Migrants Centre (formerly the Christchurch Migrants Centre) and was part of the Christchurch City Council's Walking Festival.
Introduction In 2011 Christchurch city centre was partially destroyed by an earthquake. Government-led anchor projects were tasked with bringing Christchurch back from rubble. After a period of 7 years out of 16 proposed projects, 10 are already over time for their initial completion dates and the ones completed, are under scrutiny for failing to deliver their expected outcome.
Photograph captioned by BeckerFraserPhotos, "175-179 Tuam Street".
A photograph of the Salvation Army building on Durham Street.
Photograph captioned by BeckerFraserPhotos, "ChristChurch Cathedral, Cathedral Square".
Photograph captioned by BeckerFraserPhotos, "ChristChurch Cathedral, Cathedral Square".
A photograph captioned by BeckerFraserPhotos, "Long summer grass surrounds the fallen stone on the south side of ChristChurch Cathedral".
Photograph captioned by BeckerFraserPhotos, "The Edmonds Telephone Booth on Oxford Terrace, near Madras Street".
Within four weeks of the September 4 2010 Canterbury Earthquake a new, loosely-knit community group appeared in Christchurch under the banner of “Greening the Rubble.” The general aim of those who attended the first few meetings was to do something to help plug the holes that had already appeared or were likely to appear over the coming weeks in the city fabric with some temporary landscaping and planting projects. This article charts the first eighteen months of Greening the Rubble and places the initiative in a broader context to argue that although seismic events in Christchurch acted as a “call to palms,” so to speak, the city was already in need of some remedial greening. It concludes with a reflection on lessons learned to date by GTR and commentary on the likely issues ahead for this new mini-social-environmental movement in the context of a quake-affected and still quake-prone major New Zealand city. One of the key lessons for GTR and all of those involved in Christchurch recovery activities to date is that the city is still very much in the middle of the event and is to some extent a laboratory for seismic and agency management studies alike.
Photograph captioned by BeckerFraserPhotos, "A sculpture on the Cambridge Terrace side of the River Avon which marks 15 years of the Seattle-Christchurch Sister City Association".
Photograph captioned by BeckerFraserPhotos, "Cathedral Square - front of the Christchurch Cathedral".
A poster created by Empowered Christchurch to advertise their submission to the CERA Draft Transition Recovery Plan on social media.The poster reads, "Submission. CERA Draft Transition Recovery Plan. After nearly five years of 'Emergency Response' where sustainability has been sacrificed in the interests of speed, we can assume that this phase is now behind us. We see no reason why this period should be extended until April 2016. Lessons must be learned from the past. It is time to move into the 'Restoration Phase'. Once seismic and building standards are corrected, and risks are notified, mapped and accepted, sustainability will be ensures. We need a city that is driven by the people that live in it, and enabled by a bureaucracy that accepts and mitigates risks, rather than transferring them to the most vulnerable residents. We support option 3+."
A PDF copy of The Star newspaper, published on Wednesday 22 June 2011.
Photograph captioned by BeckerFraserPhotos, "ChristChurch Cathedral, Cathedral Square".
Photograph captioned by BeckerFraserPhotos, "ChristChurch Cathedral, Cathedral Square".
Earthquake damaged building on a Walk around the city, May 1, 2014 Christchurch New Zealand. Demolition work on Christchurch's "distinctive" former civic building is under way. The category-2 heritage building was designed by G A J Hart and opened in 1939 as the Miller's department store. It featured the South Island's first escalator, which...
Earthquake damaged building on a Walk around the city, May 1, 2014 Christchurch New Zealand. Demolition work on Christchurch's "distinctive" former civic building is under way. The category-2 heritage building was designed by G A J Hart and opened in 1939 as the Miller's department store. It featured the South Island's first escalator, which...
A photograph captioned by Paul Corliss, "Porritt Park".