Photograph captioned by BeckerFraserPhotos, "ChristChurch Cathedral, Cathedral Square".
Photograph captioned by BeckerFraserPhotos, "Cathedral Square - front of the Christchurch Cathedral".
Introduction In 2011 Christchurch city centre was partially destroyed by an earthquake. Government-led anchor projects were tasked with bringing Christchurch back from rubble. After a period of 7 years out of 16 proposed projects, 10 are already over time for their initial completion dates and the ones completed, are under scrutiny for failing to deliver their expected outcome.
A PDF copy of minutes from a meeting between Anglican Advocacy (formerly the Anglican Life Social Justice Unit), the City Mission, Te Whare Roimata, Presbyterian Support, and landowners from Christchurch East. The meeting took place on 7 August 2012.
Photograph captioned by BeckerFraserPhotos, "ChristChurch Cathedral, Cathedral Square".
Photograph captioned by BeckerFraserPhotos, "ChristChurch Cathedral, Cathedral Square".
View of the central library from Gloucester Street. USAR codes can be seen in the bottom right corner.
The entrance to the central Library on Gloucester Street has been boarded up and USAR codes have been spray-painted on the concrete pillar. A 'Library open' sign remains outside.
A copy of a letter from Hugo Kristinsson which was sent to Prince William, the Duke of Cambridge, on 2 March 2014 . The letter was sent on behalf of Empowered Christchurch, as a response to the letter read by the Prince at the official Civic Memorial Service on the 22 February 2014. Kristinsson thanks the Prince for his letter and updates him on the progress of the rebuild. He expresses his respect for King George VI and Queen Elizabeth for their compassion in the early 1940s to the victims of bombing raids during the war and acknowledge's Prince William and Prince Harry's philanthropy through The Royal Foundation of the Duke and Duchess of Cambridge and Prince Harry and The Princes' Charities Forum. Lastly he implores the Prince and the Duchess of Cambridge to visit residents from the 'low-lying seaside side of the city' who 'feel that their plight has been trivialised by the authorities in favour of prestigious big-budget projects'.
A poster created by Empowered Christchurch to advertise their submission to the CERA Draft Transition Recovery Plan on social media.The poster reads, "Submission, CERA Draft Transition Recovery Plan. Risk Acceptance. It is the role of insurance companies, the EQC included, to accept the risks covered under their terms of reference/policies and compensate policyholders when such risks eventuate. However, many policyholders in Christchurch have not been compensated for the damage to their homes and their lives. These responsibilities need to be faced by the entities responsible. An equitable solution needs to be found for properties with hazards such as flooding that are a direct result of the earthquakes. In tandem with this, every effort must be made to protect residents from the risks posed by climate change. We need a city that is driven by the people that live in it, and enabled by a bureaucracy that accepts and mitigates risks, rather than transferring them to the most vulnerable residents".
A photograph of a member of the Wellington Emergency Management Office Emergency Response Team using a sledgehammer to break open the window of a building in the Christchurch central city.
An aerial photograph the Christchurch Central City. The photograph has been captioned by BeckerFraserPhotos, "The Hotel Grand Chancellor closely surrounded by the Westpac Building and the Holiday Inn".
A photograph of the earthquake damage to a house in the Christchurch central city. The bricks walls of the building have collapsed and the bricks have spilt into the garden.
An entry from Jennifer Middendorf's blog for 23 December 2012 entitled, "Pallets and pop-up tearooms".
Photograph captioned by BeckerFraserPhotos, "Gloucester Street - salvaged from demolition of the Christchurch Star building".
A photograph of a side table and stool outside a temporary café in the Christchurch central city. The café was set up in a house after the 22 February 2011 earthquake.
A photograph of a side table and stool outside a temporary café in the Christchurch central city. The café was set up in a house after the 22 February 2011 earthquake.
Signs posted the fence cordoning off High Street. They read "Welcome to Limboland, just waiting!", "Christchurch Economic Recovery Abandoned", and "We're raising $50,000 for our City C96 FM".
Photograph captioned by BeckerFraserPhotos, "The Edmonds Telephone Booth on Oxford Terrace, near Madras Street".
A photograph captioned by BeckerFraserPhotos, "Detail of the roof of ChristChurch Cathedral. Taken from up high in the BNZ Building".
Photograph captioned by BeckerFraserPhotos, "175-179 Tuam Street".
A photograph of the Salvation Army building on Durham Street.
A poster created by Empowered Christchurch to advertise their submission to the CERA Draft Transition Recovery Plan on social media.The poster reads, "Submission. CERA Draft Transition Recovery Plan. 5. In your opinion, is there a better way to report on these recovery issues? Looking at the recovery from the perspective of the eastern suburbs, it is impossible to avoid thinking of phenomenon referred to as 'Disaster Capitalism' and considering the aspects that have already become evident in the recovery process. Loss of equity and quality of life, risk transfer and other substantial shifts are taking place. We suggest that a regular mini-census should be conducted through the remainder of the recovery at intervals of 6-12 months to monitor deprivation, insurance cover (or lack of it), mortgage, home equity, and rental status. If unexpected changes identified, investigation and correction measures should be implemented. We need a city that is driven by the people that live in it, and enabled by a bureaucracy that accepts and mitigates risks, rather than transferring them to the most vulnerable residents ."
A poster created by Empowered Christchurch to advertise their submission to the CERA Draft Transition Recovery Plan on social media.The poster reads, "Submission, CERA Draft Transition Recovery Plan. Seismic Risk. One thing we can learn from the past is that seismic risk in Canterbury has been underestimated before the earthquakes struck. This is confirmed in a report for EQC in 1991 (paper 2005). It is also the conclusion of the Royal Commission in the CTV report. A number of recommendations have been made but not followed. For example, neither the AS/NZS 1170.5 standard nor the New Zealand Geotechnical Society guidelines have been updated. Yet another recovery instrument is the Earthquake Prone Building Act, which is still to be passed by Parliament. As the emergency response part of the recovery is now behind us, we need to ensure sustainability for what lies ahead. We need a city that is driven by the people that live in it, and enabled by a bureaucracy that accepts and mitigates risks, rather than transferring them to the most vulnerable residents."
A photograph of a public talk about temporary street furniture. The furniture was designed and fabricated by F3 Design for the Christchurch City Council. The event was part of FESTA 2012.
A photograph of a public talk about temporary street furniture. The furniture was designed and fabricated by F3 Design for the Christchurch City Council. The event was part of FESTA 2012.
A photograph of a public talk about temporary street furniture. The furniture was designed and fabricated by F3 Design for the Christchurch City Council. The event was part of FESTA 2012.
A photograph of a public talk about temporary street furniture. The furniture was designed and fabricated by F3 Design for the Christchurch City Council. The event was part of FESTA 2012.
A photograph of a public talk about temporary street furniture. The furniture was designed and fabricated by F3 Design for the Christchurch City Council. The event was part of FESTA 2012.
A photograph an Wellington Emergency Management Office Emergency Response Team standing next to car inside a building in the Christchurch city centre. The car is a 1968 Plymouth Road Runner Super Bee.