A document containing examples of the technical update newsletter which detailed SCIRT innovations. The newsletters in the document were produced between 1 July 2013 and 1 May 2014.
A design guideline which provides information about how to use the SCIRT Asset Assessment Spreadsheet.
An award submission nominating SCIRT Women in Construction (SWIC) for the 2015 Diversity Awards: Category: Empowerment.
A paper delivered at Building a Better New Zealand (BBNZ 2014) Conference. The paper examines the relationship between innovation and productivity improvement in the construction industry.
A conference paper about the Pipe Damage Assessment Tool (PDAT).
An example of a paper which explains the role of an Asset Owner's Representative - Three Waters at SCIRT.
A poster which outlines the dewatering process.
A design guideline which defined the role of the technical forums within SCIRT.
A research project which presents the traffic and transport planning that has been undertaken to achieve the overarching goal of rebuilding Christchurch, whilst keeping the traffic moving.
A memorandum which summarises the outcomes of the SCIRT/New Zealand Red Cross introductory session and the design thinking workshop.
A document which sets out the 12d standards at SCIRT.
A pdf copy of a PowerPoint presentation used by Duncan Gibb when presenting his Brunel lecture.
A pdf copy of a SCIRT school visit feedback form from Richmond Primary School.
A magazine article which outlines the observations of engineers working on SCIRT retaining wall and ground improvement projects.
A diagram which shows outputs from SCIRT's March 2012 capability survey, detailing the number and type of positions that needed to be filled.
A document which summarises the outcomes of the SCIRT/New Zealand Red Cross Datasync project collaboration.
A PowerPoint presentation which evaluates and analyses the effectiveness of The Lonely Cone Recall campaign.
A document describing the use of 3D modelling for construction methodology.
A guideline to inform designers of the pipe profilometer operation, including requesting profile surveys, standards and assessments of the survey results.
A copy of the plan, created in 2011, detailing how the rebuild of the three waters and road infrastructure was to be coordinated with other utility operators.
A best practice traffic management guideline, produced in February 2014, which helps traffic management team members slow motorists through road work sites safely.
An award submission nominating SCIRT for the 2016 New Zealand Spatial Excellence Awards: Category: Award for Technical Excellence.
A promotional brochure explaining the Forward Works Viewer and that the tool was a key to cost-effective and efficient project delivery in Christchurch.
A formal guideline to dewatering.
An example of a checklist used by SCIRT traffic management teams to perform site checks.
A document which describes the process that SCIRT took to work with industry organisations to develop a civil trade qualification.
A flyer which was attached to an email inviting people to the Humaneers action learning group.
An example of a tool SCIRT has used to communicate its projects to a community.
A plan which outlines the function, roles and responsibilities of SCIRT during an emergency event affecting SCIRT construction works. The first version of this plan was produced on 30 April 2012. Note that personal details of key personnel have been removed from this document.
A plan which aims to ensure an environment of Zero Harm on SCIRT worksites. The first version of this plan was produced on 29 July 2011.