A crane working on a brick building in the Christchurch central city. A sign on the fence reads, "Quake repairs, keep out, for your own safety".
A photograph of an earthquake damaged building in the Christchurch central city. Some of the windows have broken and have been covered with plastic and tape.
A photograph of volunteers from the Wellington Emergency Management Office standing on a pile of bricks from an earthquake-damaged building in the Christchurch central city.
A pdf copy of a PowerPoint presentation prepared for the Christchurch City Council and CPG New Zealand, providing an overview of the investigation work completed.
An aerial photograph looking west over the northern part of the Christchurch central city with Bealey Avenue to the right and Hagley Park in the distance.
Aftermath of September 4th Earthquake in Canterbury (area covers Christchurch City) NZ. Empty fuel tanks lifted out of forecourt at petrol station on Pages Road.
A photograph of a plaque dedicate to those who lost their lives in City Mall during the earthquake of 22 February 2011. The plague is located under a tree in Re:START mall.
Photograph captioned by BeckerFraserPhotos, "The CCC held a road show to gather the citizens' opinions on how Christchurch should be re-developed".
Helicopter Flight over Christchurch New Zealand
A photograph captioned by BeckerFraserPhotos, "A plaque set in the pavement of Cambridge Terrace. The plaque was placed there to commemorate Christchurch's 15 years of sister city friendship with Seattle".
A photograph captioned by BeckerFraserPhotos, "The City Council building looked rather spectacular on this late autumn day".
Photograph captioned by BeckerFraserPhotos, "ChristChurch Cathedral with the war memorial".
Pws-2010-10-02-dsc03045
Colombo Street Post Quake PWS-2010-10-15-DSC03767
Photograph captioned by BeckerFraserPhotos, "The missing rose window in the Christchurch Cathedral".
Photograph captioned by BeckerFraserPhotos, "A sculpture on the Cambridge Terrace side of the River Avon which marks 15 years of the Seattle-Christchurch Sister City Association".
A photograph of a messaged spray-painted by USAR staff on the driveway of a property in the Christchurch central city. The message reads, "Overhead danger, NZRT3".
A photograph of the earthquake damage to a building in the Christchurch central city. Some of the windows have been broken, and blinds are hanging out of them.
Photograph captioned by BeckerFraserPhotos, "The site of the Latimer Square side of the Christchurch Club".
A photograph of a map at the temporary Civil Defence headquarters which was set up at the Christchurch Art Gallery after the 4 September 2010 earthquake. The map shows areas of the city that have flooded and roads that have closed.
A photograph of a map at the temporary Civil Defence headquarters which was set up at the Christchurch Art Gallery after the 4 September 2010 earthquake. The map shows areas of the city that have flooded and roads that have closed.
Photograph captioned by BeckerFraserPhotos, "ChristChurch Cathedral, Cathedral Square".
An aerial photograph of the Christchurch central city. The photograph has been captioned by BeckerFraserPhotos, "The central city, with the Majestic Theatre in the centre of the photograph. Lichfield Street runs from bottom left diagonally up the photograph to the top right. The City Council building is prominent in the bottom left corner and Latimer Square in the top left corner".
A document that defines the requirements and objectives of design activities for SCIRT's reconstruction of the city's horizontal infrastructure and describes how these activities should be implemented.
A document containing examples of items and activities SCIRT implemented as part of the programme to support businesses affected and disrupted by SCIRT central city rebuild work.
A poster created by Empowered Christchurch to advertise their submission to the CERA Draft Transition Recovery Plan on social media.The poster reads, "Submission. CERA Draft Transition Recovery Plan. After nearly five years of 'Emergency Response' where sustainability has been sacrificed in the interests of speed, we can assume that this phase is now behind us. We see no reason why this period should be extended until April 2016. Lessons must be learned from the past. It is time to move into the 'Restoration Phase'. Once seismic and building standards are corrected, and risks are notified, mapped and accepted, sustainability will be ensures. We need a city that is driven by the people that live in it, and enabled by a bureaucracy that accepts and mitigates risks, rather than transferring them to the most vulnerable residents. We support option 3+."
Earthquake damaged building on a Walk around the city, May 1, 2014 Christchurch New Zealand. Demolition work on Christchurch's "distinctive" former civic building is under way. The category-2 heritage building was designed by G A J Hart and opened in 1939 as the Miller's department store. It featured the South Island's first escalator, which...
Earthquake damaged building on a Walk around the city, May 1, 2014 Christchurch New Zealand. Demolition work on Christchurch's "distinctive" former civic building is under way. The category-2 heritage building was designed by G A J Hart and opened in 1939 as the Miller's department store. It featured the South Island's first escalator, which...
A photograph captioned by Paul Corliss, "Desalination plant, New Brighton".
A photograph captioned by Paul Corliss, "Desalination plant, New Brighton".