Search

found 2306 results

Research papers, University of Canterbury Library

Mr Wayne Tobeck, Director of Southrim Group (SRG), sponsored this 2013 MEM Project titled; A Technical and Economic Feasibility Study for the Integration of GSHP Technology in the Christchurch Rebuild. Following the recent Christchurch earthquakes, a significant amount of land has become too unstable to support traditional building foundations. This creates an opportunity to implement new and unique foundation designs previously unconsidered due to high costs compared to traditional methods. One such design proposes that an Injection Micro-Piling technique could be used. This can also be coupled with HVAC technology to create a Ground Source Heat Pump (GSHP) arrangement in both new buildings and as retrofits for building requiring foundation repair. The purpose of this study was to complete a feasibility study on the merits of SRG pursuing this proposed product. A significant market for such a product was found to exist, while the product was also found to be technically and legally feasible. However, the proposed product was found to not be economically feasible with respect to Air Source Heat Pumps due to the significantly higher capital and installation costs required. Further analysis suggests GSHPs may become more economically attractive in operating temperatures lower than -9oC, though the existence of markets with this climate in NZ has not been studied. It is therefore suggested that SRG do not proceed with plans to develop a GSHP coupled foundation solution for the Christchurch rebuild.

Research papers, University of Canterbury Library

Tertiary students, not just working populations, might be experiencing feelings of burnout following the Christchurch earthquakes of 2010 and 2011. In the aftermath of a major disaster, the gap between the resources available to handle pressures (e.g., support) and the demands inherent in the pursuit of an academic degree (e.g., heavy workload) may lead to feelings of burnout among students. This study hypothesised that burnout dimensions (emotional exhaustion and disengagement) would be related to students’ perceptions of immediate institutional support, extended institutional support, peer support, family support, and work overload. Additionally, it was proposed that institutional and social support would moderate the relationship between work overload and burnout. Two hundred and seventy one third and fourth year students were sampled using an online questionnaire. These particular students were expected to be at greater risk of emotional exhaustion and academic disengagement because they were at the earliest stage of their tertiary education when the major earthquakes first hit. Family support and extended institutional support were found to be associated with decreased levels of emotional exhaustion and disengagement. Meanwhile, work overload was found to be related to increased levels of emotional exhaustion and disengagement. Furthermore, both peer support and immediate institutional support were found to have a moderating effect on the relationship between work overload and disengagement. This study has exposed unique findings which contribute to burnout research especially in a post-disaster context, and raises the importance of providing the right types of support for individuals who are particularly dealing with the consequences of a natural disaster.

Research papers, University of Canterbury Library

On 22 February 2011, Canterbury and its largest city Christchurch experienced its second major earthquake within six months. The region is facing major economic and organisational challenges in the aftermath of these events. Approximately 25% of all buildings in the Christchurch CBD have been “red tagged” or deemed unsafe to enter. The New Zealand Treasury estimates that the combined cost of the February earthquake and the September earthquake is approximately NZ$15 billion[2]. This paper examines the national and regional economic climate prior to the event, discusses the immediate economic implications of this event, and the challenges and opportunities faced by organisations affected by this event. In order to facilitate recovery of the Christchurch area, organisations must adjust to a new norm; finding ways not only to continue functioning, but to grow in the months and years following these earthquakes. Some organisations relocated within days to areas that have been less affected by the earthquakes. Others are taking advantage of government subsidised aid packages to help retain their employees until they can make long-term decisions about the future of their organisation. This paper is framed as a “report from the field” in order to provide insight into the early recovery scenario as it applies to organisations affected by the February 2011 earthquake. It is intended both to inform and facilitate discussion about how organisations can and should pursue recovery in Canterbury, and how organisations can become more resilient in the face of the next crisis.

Research papers, University of Canterbury Library

The south Leader Fault (SLF) is a newly documented active structure that ruptured the surface during the Mw 7.8 Kaikoura earthquake. The Leader Fault is a NNE trending oblique left lateral thrust that links the predominantly right lateral ‘The Humps’ and Conway-Charwell faults. The present research uses LiDAR at 0.5 m resolution and field mapping to determine the factors controlling the surface geometries and kinematics of the south Leader Fault ruptures at the ground surface. The SLF zone is up to 2km wide and comprises a series of echelon NE-striking thrusts linked by near-vertical N-S striking faults. The thrusts are upthrown to the west by up to 1 m and dip 35-45°. Thrust slip surfaces are parallel with Cretaceous-Cenozoic bedding and may reflect flexural slip folding. By contrast, the northerly striking faults dip steeply (65° west- 85° east), and accommodate up to 3m of oblique left lateral displacement at the ground surface and displace Cenozoic bedding. Some of the SLF has been mapped in bedrock, although none were known to be active prior to the earthquake or have a strong topographic expression. The complexity of fault rupture and the width of the fault zone appears to reflect the occurrence of faulting and folding at the ground surface during the earthquake.

Research papers, University of Canterbury Library

Background: Earthquakes are found to have lingering post-disaster effects on children that can be present for months or years after the disaster, including hyperarousal symptoms. Young children have the most difficulties in regulating their emotions, especially when they are highly aroused. Colouring-in mandala designs have been found to reduce hyperarousal symptoms of stress in young adults. The purpose of this study was to determine if the same effects of colouring-in mandalas would be seen with children showing signs of hyperarousal. Research Question: To identify what effect colouring-in mandala designs would have on the heart rate in a young child showing signs of hyperarousal. Method: Following approved procedures for informed consent, two 6-year-old girls from a Christchurch primary school were chosen for the study. Heart rate was measured using a Fitbit in a single subject design. The baseline, colouring-in and a second baseline phase were conducted during mathematics. The participants and their teacher reported on arousal, enjoyment, and positive and problem behaviours. The study took 26 school days to complete. Results: Compared with baseline, the average heart rate data showed no decrease in heart rate (i.e., calming effect) during the mandala colouring-in task phase. Conclusions: The participants enjoyed colouring-in the mandalas, but the average heart rate data did not show that colouring-in pre-drawn designs reduced heart rate, a measure of arousal. Major study limitations included; not having suitable participants or a suitable setting for the colouring-in task, and not being able to observe both participants.

Research papers, University of Canterbury Library

Post-earthquake cordons have been used after seismic events around the world. However, there is limited understanding of cordons and how contextual information of place such as geography, socio-cultural characteristics, economy, institutional and governance structure etc. affect decisions, operational procedures as well as spatial and temporal attributes of cordon establishment. This research aims to fill that gap through a qualitative comparative case study of two cities: Christchurch, New Zealand (Mw 6.2 earthquake, February 2011) and L’Aquila, Italy (Mw 6.3 earthquake, 2009). Both cities suffered comprehensive damage to its city centre and had cordons established for extended period. Data collection was done through purposive and snowball sampling methods whereby 23 key informants were interviewed in total. The interviewee varied in their roles and responsibilities i.e. council members, emergency managers, politicians, business/insurance representatives etc. We found that cordons were established to ensure safety of people and to maintain security of place in both the sites. In both cities, the extended cordon was met with resistance and protests. The extent and duration of establishment of cordon was affected by recovery approach taken in the two cities i.e. in Christchurch demolition was widely done to support recovery allowing for faster removal of cordons where as in L’Aquila, due to its historical importance, the approach to recovery was based on saving all the buildings which extended the duration of cordon. Thus, cordons are affected by site specific needs. It should be removed as soon as practicable which could be made easier with preplanning of cordons.

Research papers, University of Canterbury Library

The performance of buildings in recent New Zealand earthquakes (Canterbury, Seddon and Kaikōura), delivered stark lessons on seismic resilience. Most of our buildings, with a few notable exceptions, performed as our Codes intended them to, that is, to safeguard people from injury. Many buildings only suffered minor structural damage but were unable to be reused and occupied for significant periods of time due to the damage and failure of non-structural elements. This resulted in substantial economic losses and major disruptions to our businesses and communities. Research has attributed the damage to poor overall design coordination, inadequate or lack of seismic restraints for non structural elements and insufficient clearances between building components to cater for the interaction of non structural elements under seismic actions. Investigations have found a clear connection between the poor performance of non-structural elements and the issues causing pain in the industry (procurement methods, risk aversion, the lack of clear understanding of design and inspection responsibility and the need for better alignment of the design codes to enable a consistent integrated design approach). The challenge to improve the seismic performance of non structural elements in New Zealand is a complex one that cuts across a diverse construction industry. Adopting the key steps as recommended in this paper is expected to have significant co-benefits to the New Zealand construction industry, with improvements in productivity alongside reductions in costs and waste, as the rework which plagues the industry decreases.

Images, Alexander Turnbull Library

Surrounded by mud and puddles in Christchurch Prime Minister John Key puts his arm round co-leader of the Maori Party Pita Sharples and smiles happily; behind them is a brand new plastic portaloo. On the ground lies a newspaper with a headline that reads 'Govt. to fund $2m giant RWC plastic waka'. Pita Sharples says 'and to show we're not neglecting our priorities in these austere times, Christchurch will get a new plastic portaloo!' Context - The government has hit back at criticism over a $2 million venue centre in the shape of a waka for the Rugby World Cup (RWC), defending the cost as necessary to host a world-class event. Co-leader of the Maori Party Pita Sharples says the waka will promote Maori culture during the Rugby World Cup and at other events (like the America's Cup). Labour Party MP Shane Jones asks "How can Dr Sharples and Prime Minister John Key actually believe that this expensive indulgence is a positive advertisement for Maori? The truth is they don't but they're both working together in a desperate effort to keep the Maori Party afloat. Quantity: 1 digital cartoon(s).

Images, Alexander Turnbull Library

Christchurch City has to be rebuilt after the earthquakes of 4 September 2010 and 22 February 2011. People are being invited to contribute ideas about how to rebuild on a city council website. A group of people look at ideas on computers; a boy comments that 'this one looks just like the old city' and his father comments 'but built fifty miles up the road!' A woman looks at what appears to be pre European Maori pa site and says 'Hone Harawira wants something pre-European!' Another woman looks at a map of the middle of the South Island and says 'Rodney Hide doesn't care as long as Christchurch combines with Timaru and Westport!' Context - Former ACT leader Rodney Hide in his role as Minister for Local Government likes 'supercities' and Hone Harawira has left the Maori Party, fed up with the compromises he believes they have to make to suit their coalition agreement with the National government. He seems to prefer a city that will reflect simpler pre-European times. Colour and black and white versions available Quantity: 2 digital cartoon(s).

Images, Alexander Turnbull Library

Finance Minister Bill English scratches his head with frustration as he stands up to his chest in earthquake rubble that represents the 'economy'. Allan Bollard the Governor of the Reserve Bank appears in gumboots asking if he can 'help with rebuilding..? by making an 'OCR cut'; he holds a collection box labeled 'OCR cut'. Context - Two earthquakes and hundreds of aftershocks have hit Christchurch, the first on 4 September 2010 and a second more devastating one on 22 February 2011. The Reserve Bank has made a relatively large 50-point cut in its benchmark interest rate, the Official Cash Rate (from 3% to 2.5 per cent). Critics say that inflation is already running unacceptably high and there is a threat of much higher inflation in a year or two when the rebuilding of Christchurch begins to put pressure on limited resources. The Reserve Bank acknowledged these factors, but it has chosen instead to focus on the immediate impact of the earthquake on the economy and particularly on all-important business and consumer sentiment. (Press editorial 12 March 2011) Quantity: 1 digital cartoon(s).

Images, Alexander Turnbull Library

Prime Minister John Key drives a tractor to which is attached a crane and a huge demolition ball in the shape of MP Gerry Brownlee's head; the ball smashes against a historic building bringing stone pediments down. Context - Gerry Brownlee, who is Earthquake Recovery Minister, has caused a stir by suggesting that if he had his way some of Christchurch's older buildings would be "down tomorrow". He also said the price of saving some historic buildings badly damaged in the February 22 earthquake was too high. People had died in the quake because of attempts to save historic buildings badly damaged in the September 4 quake. Brownlee said he had no regrets despite the stir his comments caused - but he was annoyed by suggestions the Cathedral and Riccarton House were among buildings he thought should be bowled. He believed those buildings should be saved, and they would be. "I'm not a philistine; I was chairman of the trust that actually saved Riccarton House from the bulldozers in 1990. "I understand conservation architecture very well and I do have an appreciation of heritage buildings." Original cartoon held at A-474-048 Quantity: 1 digital cartoon(s).

Research Papers, Lincoln University

A series of earthquakes has forced Christchurch to re-plan and rebuild. Discussions about rebuilding strategies have emphasized the intention of making it a city for the future, sustainable and vibrant. This paper discusses the relationship between microclimate and urban culture in Christchurch based upon the concept of urban comfort. It explores the relationships between environment, people and culture to help understand the local requirements for urban landscape design. In this paper we claim that cultural requirements also should be taken into account when looking for sustainable strategies. A distinctive feature of this research is its focus on the way people are adapting to both surviving prequake and new post‐quake environments. Preliminary findings from the first year of field work using participant observation and 61 in‐depth interviews with Christchurch residents are presented. The interviews were carried out in a variety of urban settings including: established sites (places sustaining relatively little damage) and emerging sites (those requiring rebuilding) during 2011‐2012. Evidence from the interviews highlight future challenges regarding sustainability and urban comfort issues. Post‐quake Christchurch presents a remarkable opportunity to design an urban landscape which provides environmental, economic, social and cultural sustainability. However, to achieve successful outcomes it is fundamental to respond to the local culture. Field data suggest that the strong connections between urban and rural settings present in local culture, lifestyle and landscape generate a particular aesthetic and recreation preference for urban spaces, which should be considered in the urban landscape design strategies.

Research Papers, Lincoln University

Though there is a broad consensus that communities play a key role in disaster response and recovery, most of the existing work in this area focuses on the activities of donor agencies, formal civil defence authorities, and local/central government. Consequently, there is a paucity of research addressing the on-going actions and activities undertaken by communities and ‘emergent groups’ , particularly as they develop after the immediate civil defence or ‘response’ phase is over. In an attempt to address this gap, this inventory of community-led recovery initiatives was undertaken approximately one year after the most devastating February 2011 earthquake. It is part of on-going project at Lincoln University documenting – and seeking a better understanding of - various emergent communities’ roles in recovery, their challenges, and strategies for overcoming them. This larger project also seeks to better understand how collaborative work between informal and formal recovery efforts might be facilitated at different stages of the process. This inventory was conducted over the December 2011 – February 2012 period and builds on Landcare Research’s Christchurch Earthquake Activity Inventory which was a similar snapshot taken in April 2011. The intention behind conducting this updated inventory is to gain a longitudinal perspective of how community-led recovery activities evolve over time. Each entry is ordered alphabetically and contact details have been provided where possible. A series of keywords have also been assigned that describe the main attributes of each activity to assist searches within this document.This inventory was supported by the Lincoln University Research Fund and the Royal Society Marsden Fund.

Audio, Radio New Zealand

JAMI-LEE ROSS to the Minister of Finance: What reports has he received on the competitiveness of New Zealand's business sector? ANDREW WILLIAMS to the Minister of Trade: Does he stand by his statement on the Trans-Pacific Partnership that "It's going to be big. It's going to be significant and it's going to help New Zealanders find well-paid jobs"; if so, on what evidence does he base this claim? DAVID SHEARER to the Prime Minister: Does he stand by his statement "…You can trust us. If we say we're going to do something we do it. If we don't, we don't … that's why I've stuck to my guns and I haven't campaigned on one thing and done something different."? METIRIA TUREI to the Prime Minister: Does he stand by his statement regarding investor state disputes procedures proposed in the Trans-Pacific Partnership agreement that "An exclusion solely for Australia and not for everybody else is unlikely to be something we would support"; if so, why? SIMON O'CONNOR to the Minister for Tertiary Education, Skills and Employment: What progress has the Government made to improve the viability of the Student Loan Scheme? JACINDA ARDERN to the Minister for Social Development: How many times, if any, has the Transition to Work Grant, or similar funds, been used by Work and Income New Zealand to purchase tickets to Australia for job seekers who have found work there? SHANE ARDERN to the Minister for Primary Industries: What announcements has he recently made on boosting innovation in the New Zealand primary sector? Hon DAVID PARKER to the Minister of Finance: Does he stand by his statement regarding migration to Australia "What's the point of standing in the airport crying about it?"; if so, how many people have left permanently for Australia since he took office in November 2008? TIM MACINDOE to the Minister for Social Development: What announcements has she made on the Expert Advisory Group on Information Security, who will oversee the development of the initiatives in the Government's White Paper for Vulnerable Children? CHRIS HIPKINS to the Minister of Education: Does she agree with all of the statements the Prime Minister has made regarding food in schools? MOJO MATHERS to the Associate Minister of Health: Other than the LD50 test, will he rule out other animal tests for the pending psychoactive substances testing regime? NICKY WAGNER to the Minister for Canterbury Earthquake Recovery: What progress is the Government making with rebuilding and repairing residential homes in Christchurch?

Audio, Radio New Zealand

1. Rt Hon WINSTON PETERS to the Prime Minister: Has he had time to read and digest the judgement of Justice Miller regarding the Crafar farm deal; if so, does he stand by his comments made in the House yesterday? 2. Hon DAVID PARKER to the Minister for Land Information: Does he believe he and the Government have conducted themselves competently and appropriately in relation to the decision to approve the purchase of the Crafar farms by a foreign buyer; if not, what did they do wrong? 3. JONATHAN YOUNG to the Minister of Finance: What reports has the Government issued on the economy? 4. JACINDA ARDERN to the Minister for Social Development: Does she have confidence that Work and Income meets their own "case management approach" expectations? 5. JAN LOGIE to the Minister for Social Development: Does she have concerns that changes to the eligibility for the Training Incentive Allowance are causing single parent beneficiaries to consider working in the sex industry? 6. Dr CAM CALDER to the Minister of Health: What improvements have there been to services for patients as a result of greater collaboration between District Health Boards? 7. Hon CLAYTON COSGROVE to the Minister for State Owned Enterprises: Does he still intend to sell 49 per cent of the four State-owned energy companies? 8. JAMI-LEE ROSS to the Minister of Local Government: What analysis has he received on rate increases across New Zealand's 78 councils following the enactment of new local government legislation in 2002? 9. Hon LIANNE DALZIEL to the Minister for Canterbury Earthquake Recovery: Does he stand by the part of his statement of 27 January, announcing the extension of the red zone offer to retirement villages, that letters of offer would be sent to each resident and CERA would work with village owners as quickly as possible to ensure the residents are assisted; if not, why not? 10. Dr RUSSEL NORMAN to the Minister for Land Information: Did Overseas Investment Office officials meet with Chinese political consul Cheng Lei late last year; if so, did they discuss Shanghai Pengxin's bid for the Crafar farms? 11. CLARE CURRAN to the Minister of Broadcasting: What is the name of the documentary which was withheld in the papers released publicly by NZ On Air titled "Records of decisions made at working group meeting"? 12. Hon TAU HENARE to the Minister for Economic Development: What progress has he made declaring the Volvo Ocean Race Stopover a major event under the Major Events Management Act 2007?

Audio, Radio New Zealand

PAUL GOLDSMITH to the Minister of Finance: What reports has he received on progress in lifting New Zealand’s household savings and reducing household debt? EUGENIE SAGE to the Minister for Canterbury Earthquake Recovery: Did the advice he has received on Christchurch City Council assets contemplate a sell off or sell down of shares in companies supervised by Christchurch City Holdings Ltd or of other council assets; if so, which ones? Hon DAVID PARKER to the Minister of Finance: Does he stand by his answer to yesterday’s primary question “as I understand it, there are no regional statistics that specifically isolate the number of people leaving any particular region to move overseas” and has the Treasury reported to him the existence of official statistics on permanent and long-term migration compiled by local council area and region? SCOTT SIMPSON to the Minister for Tertiary Education, Skills and Employment: What changes is the Government making to improve results from industry training? Hon LIANNE DALZIEL to the Minister for Canterbury Earthquake Recovery: Which of the assets identified by CERA in response to his request has he ruled out asking Christchurch City Council to sell? KATRINA SHANKS to the Minister of Justice: What changes is she making to improve the Family Court? Le'aufa'amulia ASENATI LOLE-TAYLOR to the Minister for Whānau Ora: Does she stand by her statement that “I don’t object to any vulnerable family receiving Whānau Ora support, because that’s what the money is for”? Hon ANNETTE KING to the Minister of Housing: Does he stand by all his comments on housing; if not, why not? Dr KENNEDY GRAHAM to the Minister of Foreign Affairs: What is the total number and cost of uncontested contracts given by the Ministry of Foreign Affairs and Trade to external consultants in the last two financial years? MARK MITCHELL to the Minister for Communications and Information Technology: Has she received any reports on the progress of the Government’s Ultra-Fast Broadband and Rural Broadband Initiatives? DARIEN FENTON to the Minister of Labour: Does she stand by her statement regarding foreign chartered fishing vessels “If breaches of labour law occur – such as underpayment of wages or illegal deductions or breaches of the Code of Practice, the Department of Labour will be able to investigate them and take action”? NICKY WAGNER to the Minister for the Environment: What recent announcements has she made in relation to the Waste Minimisation Fund?

Research papers, University of Canterbury Library

The Canterbury earthquakes of 2010 and 2011 have shone the spotlight on a number of tax issues. These issues, and in particular lessons learned from them, will be relevant for revenue authorities, policymakers and taxpayers alike in the broader context of natural disasters. Issues considered by this paper include the tax treatment of insurance monies. For example, building owners will receive pay-outs for destroyed assets and buildings which have been depreciated. Where the insurance payment is more than the adjusted tax value, there will be a taxable "gain on sale" (or depreciation recovery income). If the building owner uses those insurance proceeds to purchase a replacement asset, legislative amendments specifically enacted following the earthquakes provide that rollover relief of the depreciation recovery income is available. The tax treatment of expenditure to seismically strengthen a building is another significant issue faced by building owners. Case law has determined that this expenditure will usually be capital expenditure. In the past such costs could be capitalised to the building and depreciated accordingly. However, since the 2011-2012 income year owners have been prohibited from claiming depreciation on buildings and therefore currently no deduction is available for such strengthening expenditure (whether immediate or deferred). This has significant potential implications for landlords throughout New Zealand facing significant seismic retrofit costs. Incentives, or some form of financial support, whether delivered through the tax system or some other mechanism may be required. International Financial Reporting Standards (IFRS) require insurance proceeds, including reimbursement for expenditure of a capital nature, be reported as income while expenditure itself is not recorded as a current period expense. This has the effect of overstating current income and creating a larger variation between reported income for accounting and taxation purposes. Businesses have obligations to maintain certain business records for tax purposes. Reconstructing records destroyed by a natural disaster depends on how the information was originally stored. The earthquakes have demonstrated the benefits of ‘off-site’ (outside Canterbury) storage, in particular electronic storage. This paper considers these issues and the Inland Revenue Department (Inland Revenue) Standard Practice Statement which deals with inter alia retention of business records in electronic format and offshore record storage. Employer provided accommodation is treated as income to the benefitting employee. A recent amendment to the Income Tax Act 2007 retrospectively provides that certain employer provided accommodation is exempt from tax. The time aspect of these rules is extended where the employee is involved in the Canterbury rebuild and comes from outside the region.

Research Papers, Lincoln University

Liquefaction features and the geologic environment in which they formed were carefully studied at two sites near Lincoln in southwest Christchurch. We undertook geomorphic mapping, excavated trenches, and obtained hand cores in areas with surficial evidence for liquefaction and areas where no surficial evidence for liquefaction was present at two sites (Hardwick and Marchand). The liquefaction features identified include (1) sand blows (singular and aligned along linear fissures), (2) blisters or injections of subhorizontal dikes into the topsoil, (3) dikes related to the blows and blisters, and (4) a collapse structure. The spatial distribution of these surface liquefaction features correlates strongly with the ridges of scroll bars in meander settings. In addition, we discovered paleoliquefaction features, including several dikes and a sand blow, in excavations at the sites of modern liquefaction. The paleoliquefaction event at the Hardwick site is dated at A.D. 908-1336, and the one at the Marchand site is dated at A.D. 1017-1840 (95% confidence intervals of probability density functions obtained by Bayesian analysis). If both events are the same, given proximity of the sites, the time of the event is A.D. 1019-1337. If they are not, the one at the Marchand site could have been much younger. Taking into account a preliminary liquefaction-triggering threshold of equivalent peak ground acceleration for an Mw 7.5 event (PGA7:5) of 0:07g, existing magnitude-bounded relations for paleoliquefaction, and the timing of the paleoearthquakes and the potential PGA7:5 estimated for regional faults, we propose that the Porters Pass fault, Alpine fault, or the subduction zone faults are the most likely sources that could have triggered liquefaction at the study sites. There are other nearby regional faults that may have been the source, but there is no paleoseismic data with which to make the temporal link.

Research papers, The University of Auckland Library

Following the 2010/2011 Canterbury (New Zealand) earthquakes the seismic design of buildings with precast concrete panels has received significant attention. Although this form of construction generally performed adequately in Christchurch, there were a considerable number of precast concrete panel connection failures. This observation prompted a review of more than 4700 panel details to establish representative details used in both existing and new multi-storey and low rise industrial precast concrete buildings. The detailing and quantity of each reviewed connection type in the sampled data is reported, and advantages and potential deficiencies of each connection type are discussed. Following the Canterbury earthquakes, it was observed that brittle failure had occurred in some grouted metal duct connections used for precast concrete wall panels, resulting in recommendations for more robust detailing of this connection type. A set of experimental tests was subsequently performed to investigate the in-plane seismic behaviour of precast concrete wall panel connections. This testing comprised of seven reversed cyclic in-plane tests of fullscale precast concrete wall panels having wall-to-foundation grouted metal duct connections. Walls with existing connection detailing were found to perform adequately when carrying low axial loads, but performance was found to be less satisfactory as the axial load and wall panel length increased. The use of new recommended detailing was observed to prevent brittle connection response and to improve the robustness of the reinforcement splice. A parametric investigation was conducted using the finite element method to predict the failure mode of metal duct connections. From the results of the parametric study on metal duct connections it was identified that there were three possible failure modes, being reinforcement fracture, concrete spalling without metal duct pull out, and concrete spalling with metal duct pull-out. An alternative simple analytical method was proposed in order to determine the type of connection failure without using a time-consuming finite element method. Grouted sleeves inserts are an alternative connector that is widely used to connect wall panels to the foundations. The two full-scale wall panels were subjected to reversed cyclic in-plane demands until failure of either the connection or the wall panel. Wall panel failure was due to a combination of connection reinforcement pulling-out from the coupler and reinforcement fracture. In addition, non-embedded grouted sleeve tests filled with different quality of grout were conducted by subjecting these coupler assemblages to cyclic and monotonic forces.

Research papers, University of Canterbury Library

With origins in the South Bronx area of New York in the early 1970s, hip-hop culture is now produced and consumed globally. While hip-hop activities can be varied, hip-hop is generally considered to have four forms or “elements”: DJing, MCing, b-boying/b-girling, and graffiti. Although all four elements of hip-hop have become a part of many youth work initiatives across the globe, public debate and controversy continue to surround hip-hop activities. Very little research and literature has explored the complexities involved in the assembling of hip-hop activities in youth work sites of practice using these hip-hop elements. This study attends to the gap in hip-hop and human service literature by tracing how hip-hop activities were assembled in several sites of youth work activity in Christchurch, New Zealand. Actor-network theory (ANT) is the methodological framework used to map the assemblage of hip-hop-youth work activities in this study. ANT follows how action is distributed across both human and non-human actors. By recognising the potential agency of “things”, this research traces the roles played by human actors, such as young people and youth workers, together with those of non-human actors such as funding documents, social media, clothing, and youth venue equipment. This ethnographic study provides rich descriptions or “snapshots” of some of the key socio-material practices that shaped the enactment of hip-hop-youth work activities. These are derived from fieldwork undertaken between October 2009 and December 2011, where participant observation took place across a range of sites of hip-hop-youth work activity. In addition to this fieldwork, formal interviews were undertaken with 22 participants, the majority being youth workers, young people, and youth trust administrators. The ANT framework reveals the complexity of the task of assembling hip-hop in youth work worlds. The thesis traces the work undertaken by both human and non-human actors in generating youth engagement in hip-hop-youth work activities. Young people’s hip-hop interests are shown to be varied, multiple, and continually evolving. It is also shown how generating youth interest in hip-hop-youth work activities involved overcoming young people’s indifference or lack of awareness of the hip-hop resources a youth trust had on offer. Furthermore, the study highlights where hip-hop activities were edited or “tinkered” with to avoid hip-hop “bads”. The thesis also unpacks how needed resources were enlisted, and how funders’ interests were translated into supporting hip-hop groups and activities. By tracing the range of actors mobilised to enact hip-hop-youth work activities, this research reveals how some youth trusts could avoid having to rely on obtaining government funds for their hip-hop activities. The thesis also includes an examination of one youth trust’s efforts to reconfigure its hip-hop activities after the earthquakes that struck Christchurch city in 2010 and 2011. Working both in and on the world, the text that is this thesis is also understood as an intervention. This study constitutes a deliberate attempt to strengthen understandings of hip-hop as a complex, multiple, and fluid entity. It therefore challenges traditional media and literature representations that simplify and thus either stigmatise or celebrate hip-hop. As such, this study opens up possibilities to consider the opportunities, as well as the complexities of assembling hip-hop in youth work sites of practice.

Audio, Radio New Zealand

Topics - Twelve charges laid against the former Pike River Coal chief executive Peter Whittall in relation to the 2010 disaster at the mine have been dropped. In a shock development in the Christchurch District Court today, the Crown said that after an extensive review it was "not appropriate to continue with the prosecution against Mr Whittall''. More than half of the 2.15 million KiwiSaver members are either not contributing to the retirement scheme or not saving enough to collect the $521 annual tax credit from the Government, according to the Inland Revenue Department. The number of people with dire needs on Housing New Zealand's waiting list has tripled since the Christchurch earthquakes.

Audio, Radio New Zealand

Topics - The Gettysburg address, the short speech given by Abraham Lincoln 150 years ago today, the finest short speech in the English language, and one of the great political utterances of all time. A strong earthquake that hit Christchurch last night has been upgraded by GNS Science to a magnitude 4.6. It was also shallower than first believed, with GNS reporting it was 8km deep rather than 11km. Wallabies rugby coach Ewen McKenzie has made no apologies for suspending six of his players in what's been described as "a hard-line move designed to set the standards required to win the 2015 World Cup".

Audio, Radio New Zealand

The Devonport-Takapuna Local Board in Auckland wants Parliament to amend a Treaty Settlement Bill for Ngati Whatua o Orakei, to exclude what's called the Tamaki block of just over three hectares of land at Narrow Neck; Taranaki Maori are being called to a Treaty Update hui this weekend - to keep abreast of tribal claims against the Crown; Maori Wardens have fronted up to a researcher looking at how the Christchurch earthquake has affected emergency workers; The winner of the Golden Shears Open Women's Title for 2012 says she's keen to keep competiting for a few more years yet and hopes she can inspire more wool handlers to get to her level and to prove that it is achievable.

Audio, Radio New Zealand

More than 11,000 people reported feeling the earthquake that hit just after 2am on Friday. The magnitude 4.8 quake was centred 5-kilometres south of Te Aroha, at a depth of 6-kilometres. People from Kaitaia, through to the sodden regions of Auckland, Bay of Plenty, Coromandel, and even down in Christchurch, reported feeling it. A series of weaker aftershocks began to strike 40 minutes later, although there are no immediate reports of damage as of yet. It's not the first quake to hit Te Aroha this year - a 5.1 quake rattled the town on January 4. Te Kuiti resident Zane Burdett and Kees Meinderts from Motumaoho, just south of Morrinsville, spoke to Corin Dann.

Images, UC QuakeStudies

Part of Mike Hewson's installation 'Homage To Lost Spaces' in the Cramner Courts building, photographs of people riding bicycles have been inserted into a gap in the building. The photographer comments, "Cranmer Courts was very badly damaged in the quakes that unexpectedly hit Christchurch. Originally big photographs were put into the holes where the doors and windows were, but now these massive pictures have been put across the boarded up ends of the buildings to keep them alive in the minds of the people of Christchurch. The project was thought up by Mike Hewson".

Audio, Radio New Zealand

EQC was ill-prepared to deal with the wide spread damage of the Christchurch Earthquakes and as a consequence its reputation been left in tatters with many seeing the commission as uncaring, miserly and inefficient. That is according to the findings of the inquiry into EQC and its handling of quake claims in Canterbury and Kaikōura. Inquiry Chair Dame Silvia Cartwright lays out a raft of inadequacies including EQC not being equiped to handle a mass scale managed repair programme - leading to multiple mistakes, poor staffing decisions and inadequate quality control. Damage assessments were the root of claimants disputes time and time again. Dame Silvia Cartwright described to Checkpoint the way claimants have been treated by EQC.

Audio, Radio New Zealand

Disaster teams in Papua New Guinea are still struggling to reach parts of the country hit hard by Monday's 7-point-5 earthquake: the Tongan branch of aid agency Live and Learn is still busy helping people patch up their homes two weeks on from the battering dished out by Cyclone Gita: Oceania leaders of the Anglican church gathering in Fiji will be looking at better preparing their people for natural disasters at a fono this week in Suva attended by the Archbishop of Canterbury; Pacific people call for more influence on global issues that affect the region's rapidly changing climate; a mould problem in Australia's refugee detention centre on Nauru posed a serious health threat.

Audio, Radio New Zealand

A local developer is looking to reshape Ashburton's triangle, the historic retail centre of the town. Robert Grice owns a number of buildings on Victoria Street that require earthquake strengthening and he wants to redevelop the existing shops into a new mixed use hospitality precinct named The Ash. Jonathan also discusses an attempt to add quarter of a million dollars to ECan's annual plan budget which has been labelled a "slap in the face" by Environment Canterbury councillor Ian Mackenzie. And a hold-up of plumbing parts and red tape at the border means the Staveley Ice Rink won't be open to skaters and curlers until at least mid-June. Local Democracy Reporter - Mid Canterbury c from the Ashburton Guardian

Audio, Radio New Zealand

Two teens. Two tragedies. And an unlikely friendship. Christchurch author Blair McMillan opens his novel with the escalating war in Syria, and the plight of Amir and his family. His surgeon father decides to try to send him and mother away from the violence - and Amir finds himself on a perilous journey - one that puts him on the other side of the planet. His path crosses with Milly, an angry teenager still reeling from the loss of her mother in the Christchurch earthquakes. Blair McMillan runs a swim school with his wife Karen by day - and Here Upon the Tide is his debut novel. He joins Susie to talk about it.

Audio, Radio New Zealand

The Anglican church is considering whether to sell Christchurch's cardboard cathedral to plug a shortfall in the budget for restoring the original descimated in the earthquakes. The church leadership will discuss the future of the cardboard building during meetings at the weekend. It opened opposite Latimer square in 2013 as a temporary place of worship, but soom became popular with tourists too. Meanwhile a 2017 estimate put the cost of restoring the actual Cathedral at just over $100 million, but that's since ballooned to north of $155 million. Harcourts real estate agent, Mark O'Loughlin, speaks to Lisa Owen from Christchurch. [embed] https://players.brightcove.net/6093072280001/default_default/index.html?videoId=6336786667112