Deconstruction of the PriceWaterhouseCoopers building.
Deconstruction of the PriceWaterhouseCoopers building.
The bill to fix botched EQC repairs from the Canterbury earthquakes has hit $270 million - four times what the previous Government predicted just two years ago. The Minister responsible for the Earthquake Commission, Megan Woods, has asked Treasury to urgently crunch some figures to give the Government an idea of its future liability, with many experts warning thousands more homes may be affected. The former Canterbury Rebuild Minister Gerry Brownlee, who was in the job for six years until a year ago, speaks to Guyon Espiner.
Between demolition and rebuild stands a time of opportunity in the earthquake ravaged city of Christchurch. Greening the Rubble and Gap Filler are temporary pockets of enterprise which began as early responses and have built in momentum to define the new city.
A photograph showing deconstruction of the MFL building.
A photograph showing deconstruction of the MFL building.
Deconstruction workers in a crane basket beside the PriceWaterhouseCoopers building.
Warwick Isaacs is director of planning and transition for Civil Defence and as such has issued demolition orders for 128 buildings, 37 in the city. Gerry Brownlee has chosen the Government's 'demolition man' Warwick Isaacs to head the rebuild of central Christchurch. The buildings were damaged in the earthquakes of 2010 and 2011. Quantity: 1 digital cartoon(s).
A photograph of Mike Hewson's artwork, 'Deconstruction', on the walkway between Ballantyne's and the former bus exchange building. The photograph is taken from an angle such that the artwork gives the illusion that the walkway is transparent.
A photograph of Mike Hewson's artwork, 'Deconstruction', on the walkway between Ballantyne's and the former bus exchange building. The photograph is taken from beneath the walkway, so that the distorted perspective which enables the illusion can be seen.
A photograph of Mike Hewson's artwork, 'Deconstruction', being installed on the walkway between Ballantyne's and the former bus exchange building.
None
None
Barbadoes St.
A helicopter from Christchurch flies over New Zealand looking for somewhere to rebuild but everywhere are notices referring to fires, floods, oily beaches, volcanoes and geysers, quakes, landslides. Nowhere seems to be safe. Quantity: 1 digital cartoon(s).
Over 900 buildings in the Christchurch central business district and 10,000 residential homes were demolished following the 22nd of February 2011 Canterbury earthquake, significantly disrupting the rebuild progress. This study looks to quantify the time required for demolitions during this event which will be useful for future earthquake recovery planning. This was done using the Canterbury Earthquake Recovery Authority (CERA) demolition database, which allowed an in-depth look into the duration of each phase of the demolition process. The effect of building location, building height, and the stakeholder which initiated the demolition process (i.e. building owner or CERA) was investigated. The demolition process comprises of five phases; (i) decision making, (ii) procurement and planning, (iii) demolition, (iv) site clean-up, and (v) completion certification. It was found that the time required to decide to demolish the building made up majority of the total demolition duration. Demolition projects initiated by CERA had longer procurement and planning durations, but was quicker in other phases. Demolished buildings in the suburbs had a longer decision making duration, but had little effect on other phases of the demolition process. The decision making and procurement and planning phases of the demolition process were shorter for taller buildings, though the other phases took longer. Fragility functions for the duration of each phase in the demolition process are provided for the various categories of buildings for use in future studies.
Shows a group of snails working on the rebuild of Christchurch. Refers to the slow pace of recovery after February 2011 earthquake in Canterbury. Quantity: 1 digital cartoon(s).
Deconstruction workers in a crane basket beside the PriceWaterhouseCoopers building.
Deconstruction workers in a crane basket beside the PriceWaterhouseCoopers building.
A document which explains the pre-approval process for specialist lining contractors working on the SCIRT horizontal repair programme.This document has had sections removed and redacted to protect contractors' commercial interests.For a current list of approved contractors authorised to carry out lining works on Christchurch City Council assets, contact the Council.
Deconstruction of the Pacific Brands House on Victoria Street.
Deconstruction of the Crystal Plaza arcade on Gloucester Street.
Deconstruction of the Crystal Plaza arcade on Gloucester Street.
Deconstruction of the Forsyth Barr and PriceWaterhouseCoopers buildings.
Blog of James Dann on Sept. 2010 Christchurch earthquake and rebuilding Christchurch.
Deconstruction of the PriceWaterhouseCoopers building, with the Forsyth Barr building in the foreground.
A photograph showing partial deconstruction of the former Bus Exchange.
Photograph captioned by BeckerFraserPhotos, "Deconstruction of an apartment building, Cashel Street".
Photograph captioned by BeckerFraserPhotos, "BNZ from south under deconstruction".
A photograph showing the deconstruction of the Mutual Funds Life building.