Police cordoned off roads to the CBD following the magnitude 7 earthquake in Christchurch on Saturday 4-9-2010.
Police cordoned off roads to the CBD following the magnitude 7 earthquake in Christchurch on Saturday 4-9-2010.
None
None
Looking towards the Christchurch CBD, with road cones, cranes and buildings being construction in the background.
Photograph captioned by Fairfax, "Earthquake and demolition destruction in Christchurch CBD. Rydges Hotel, Brannigans building and Clarendon Towers, Oxford Terrace".
Photograph captioned by BeckerFraserPhotos, "Christchurch Casino, at the intersection Peterborough and Durham Streets. Looking west".
None
None
Clean-up in the CBD of Christchurch is well under way after the 6.3 magnitude quake 22 Febraury 2011.
An infographic showing planned changes to transport in the central city.
A map showing proposed public transport routes in the central city.
Photograph captioned by Fairfax, "Damage to Christchurch CBD buildings after the September 4th earthquake. The MLC building on Manchester Street".
A photograph of the spire of ChristChurch Cathedral sitting on the ground in Cathedral Square. The photograph is captioned by BeckerFraserPhotos, "The dry summer grass shows the passing of the seasons while the top of the spire of the ChristChurch Cathedral stays still".
Photograph captioned by BeckerFraserPhotos, "Christchurch Cathedral".
Photograph captioned by BeckerFraserPhotos, "Christchurch Cathedral".
A map showing proposed cycling and walking routes in the central city.
A page banner promoting an article titled, "Change of heart: 70-year-old aerial photo found".
A diagram created in 2011, showing the communication structure across rebuild agencies.
An outline, created in 2011, of the levels of service and condition of the horizontal infrastructure within the central city, providing a broad indication of damage, service levels provided to residents and business owners, and used to estimate the cost of repairs following the earthquake events.
A document created in 2011, demonstrating the design parameters for the rebuild of wastewater, storm water, water supply and roading in the central city.
A document outlining the methodology for rebuilding horizontal infrastructure in the central city, covering wastewater (local reticulation and trunk), wastewater pump stations, storm water (local reticulation and trunk), potable water, roads, and bridges.
A document outlining how the rebuild of wastewater, water supply, storm water and roading infrastructure was to be managed and coordinated with other programmes of work in the central city.
A copy of the plan, developed in 2011, outlining the communication and community engagement that supported SCIRT's central city programme and kept Christchurch residents informed about this work.
A PDF copy of a spreadsheet used to identify the impacts of traffic management in the central city.
A detailed presentation created in 2011, outlining the approach to the central city rebuild and associated risk management.
A shortened version of a presentation created in 2011, outlining the approach to the central city rebuild.
A diagram illustrating how the rebuild of the three waters and roading infrastructure was to be managed and coordinated with other programmes of work in the central city.
A copy of the plan developed in 2011 to facilitate a collaborative approach between all stakeholders and minimise the impact on the traffic network, because of the extensive repair works necessary to repair vertical and horizontal infrastructure.
A copy of the plan, created in 2011, detailing how the rebuild of the three waters and road infrastructure was to be coordinated with other utility operators.