A car on Rowses Road has its entire front half embedded in liquefaction after falling into a sink hole. Two other cars have their wheels stuck in the silt. The photographer comments, "Perhaps the most impressively stuck car was this small silver hatchback that went head first into a large hole in a street just off Shortland Street (between Shortland and Breezes Road) in Aranui. The rear hatch was open when we came across it. Apparently there had been one person and a dog inside but they managed to escape. The silt has now settled around and inside the car, making the vehicle an intimidating monument to the earthquake".
A car on Rowses Road has its entire front half embedded in liquefaction after falling into a sink hole. Behind it, another car has its wheels stuck in the silt. The photographer comments, "Perhaps the most impressively stuck car was this small silver hatchback that went head first into a large hole in a street just off Shortland Street (between Shortland and Breezes Road) in Aranui. The rear hatch was open when we came across it. Apparently there had been one person and a dog inside but they managed to escape. The silt has now settled around and inside the car, making the vehicle an intimidating monument to the earthquake".
A PDF document which discusses the lessons learned by the Christchurch Migrant Inter-Agency group after the 22 February 2011 earthquake. The group was set up to support migrants and refugees following the February 22 earthquake in 2011, and has now been dis-established. However, the Christchurch Migrant Centre continues to co-ordinate services and help migrants settle into life in Christchurch. The purpose of the report is to provide a record of key events and responses of the group in the immediate aftermath of the February 22 earthquake, and to offer some candid discussion and insight with respect to their success or otherwise.
A car on Rowses Road has its entire front half embedded in liquefaction after falling into a sink hole. Behind it, another car has its wheels stuck in the silt. The photographer comments, "Perhaps the most impressively stuck car was this small silver hatchback that went head first into a large hole in a street just off Shortland Street (between Shortland and Breezes Road) in Aranui. The rear hatch was open when we came across it. Apparently there had been one person and a dog inside but they managed to escape. The silt has now settled around and inside the car, making the vehicle an intimidating monument to the earthquake".
Members of the University of Canterbury's Digital Media Group in their temporary office in KB02 in Kirkwood Village, the complex of prefabs set up after the earthquakes to provide temporary office and classroom space for the university. The photographer comments, "The e-learning group and the video conferencing team are now located in the Kirkwood Village at the University of Canterbury. It's a very impressive project, about 60 buildings arranged in various configurations with some used for teaching or computer labs, and others as staff offices. We will probably stay here for several years now. Looking across the centre desks to the advisers' area".
The entrance to KB02, the University of Canterbury's Digital Media Group temporary office in Kirkwood Village, the complex of prefabs set up after the earthquakes to provide temporary office and classroom space for the university. The photographer comments, "The e-learning group and the video conferencing team are now located in the Kirkwood Village at the University of Canterbury. It's a very impressive project, about 60 buildings arranged in various configurations with some used for teaching or computer labs, and others as staff offices. We will probably stay here for several years now. The front doors. We'll need to advertise our presence once we're settled in".
A photograph of a sign from the Christchurch City Council, ECan and the Canterbury District Health Board warning people over the contamination in the rivers after the September earthquake. The sign reads, "Warning, contaminated water. Due to sewage overflows this water is unsafe for human contact and activity and is a Public Health Risk. Please keep all people and pets out of contact with the water and do not consume any seafood or shellfish collected from this area". In the background, workers from Treetech clean up wood and leaves from felled trees.
Members of the University of Canterbury's Digital Media Group in their temporary office in KB02 in Kirkwood Village, the complex of prefabs set up after the earthquakes to provide temporary office and classroom space for the university. The photographer comments, "The e-learning group and the video conferencing team are now located in the Kirkwood Village at the University of Canterbury. It's a very impressive project, about 60 buildings arranged in various configurations with some used for teaching or computer labs, and others as staff offices. We will probably stay here for several years now. Looking along the south wall, Herbert Thomas and Susan Tull already settled in and working".
Members of the University of Canterbury's Digital Media Group in their temporary office in KB02 in Kirkwood Village, the complex of prefabs set up after the earthquakes to provide temporary office and classroom space for the university. The photographer comments, "The e-learning group and the video conferencing team are now located in the Kirkwood Village at the University of Canterbury. It's a very impressive project, about 60 buildings arranged in various configurations with some used for teaching or computer labs, and others as staff offices. We will probably stay here for several years now. Nikki Saunders, Lei Zhang (on the far wall), Nathan Gardiner and Blair - unpacking and settling in".
Introduction This poster presents the inferred initial performance and recovery of the water supply network of Christchurch following the 22 February 2011 Mw 6.2 earthquake. Results are presented in a geospatial and temporal fashion. This work strengthens the current understanding of the restoration of such a system after a disaster and quantifies the losses caused by this earthquake in respect with the Christchurch community. Figure 1 presents the topology of the water supply network as well as the spatial distribution of the buildings and their use.
This literature review uses research informed by disasters including the Christchurch Earthquakes, Hurricane Katrina, Red River floods, War in Israel and natural disasters in Indonesia to identify key aspects within teacher-student relationships which result in an increase in the emotional stability of our students. These aspects include prior knowledge of students and their development, psycho-social interventions and incorporation of the disaster into the curriculum. Teacher-student relationships are highlighted as vital to a child’s healing and resilience after experiencing disaster trauma.
As a result of the Canterbury earthquakes, over 60% of the concrete buildings in the Christchurch Central Business District have been demolished. This experience has highlighted the need to provide guidance on the residual capacity and repairability of earthquake-damaged concrete buildings. Experience from 2010 Chile indicates that it is possible to repair severely damaged concrete elements (see photo at right), although limited testing has been performed on such repaired components. The first phase of this project is focused on the performance of two lightly-reinforced concrete walls that are being repaired and re-tested after damage sustained during previous testing.
Prior to the devastating 2010 and 2011 earthquakes, parts of the CBD of Christchurch, New Zealand were undergoing revitalisation incorporating aspects of adaptive reuse and gentrification. Such areas were often characterised by a variety of bars, restaurants, and retail outlets of an “alternative” or “bohemian” style. These early 20th century buildings also exhibited relatively low rents and a somewhat chaotic and loosely planned property development approach by small scale developers. Almost all of these buildings were demolished following the earthquakes and a cordon placed around the CBD for several years. A paper presented at the ERES conference in 2013 presented preliminary results, from observation of post-earthquake public meetings and interviews with displaced CBD retailers. This paper highlighted a strongly held fear that the rebuild of the central city, then about to begin, would result in a very different style and cost structure from that which previously existed. As a result, permanent exclusion from the CBD of the types of businesses that previously characterised the successfully revitalised areas would occur. Five years further on, new CBD retail and office buildings have been constructed, but large areas of land between them remain vacant and the new buildings completed are often having difficulty attracting tenants. This paper reports on the further development of this long-term Christchurch case study and examines if the earlier predictions of the displaced retailers are coming true, in that a new CBD that largely mimics a suburban mall in style and tenancy mix, inherently loses some of its competitive advantage?
Members of the University of Canterbury's Digital Media Group in their temporary office in KB02 in Kirkwood Village, the complex of prefabs set up after the earthquakes to provide temporary office and classroom space for the university. The photographer comments, "The e-learning group and the video conferencing team are now located in the Kirkwood Village at the University of Canterbury. It's a very impressive project, about 60 buildings arranged in various configurations with some used for teaching or computer labs, and others as staff offices. We will probably stay here for several years now. Nick Calvert from the video-conferencing team, Blair and Paul Nicholls behind. Nathan Gardiner with his head in a box".
A car on Rowses Road has its entire front half embedded in liquefaction after falling into a sink hole. Another car has its wheels stuck in the silt. In the foreground, a car drives through flooding which covers the road. The photographer comments, "Perhaps the most impressively stuck car was this small silver hatchback that went head first into a large hole in a street just off Shortland Street (between Shortland and Breezes Road) in Aranui. The rear hatch was open when we came across it. Apparently there had been one person and a dog inside but they managed to escape. The silt has now settled around and inside the car, making the vehicle an intimidating monument to the earthquake".
Army personnel beside the damaged Colombo Street Wesleyan Church. Danger tape has been stretched across Colombo Street to create a cordon. The photographer comments, "After the 22nd February earthquake, my wife and I spent one night in a tent outside our home and then left to stay with friends in Timaru for a couple of nights. On the way along Brougham Street, we passed the Sydenham Church on the corner of Colombo Street and Brougham Street. As you can see from the photos, the upper area has been extensively damaged. Most of the damage appears to be on the east facing wall although we didn't get much of a look at the other sides or, of course, the interior".
Damage to the Colombo Street Wesleyan Church. The gable end has partially collapsed, and the window is damaged. The photographer comments, "After the 22nd February earthquake, my wife and I spent one night in a tent outside our home and then left to stay with friends in Timaru for a couple of nights. On the way along Brougham Street, we passed the Sydenham Church on the corner of Colombo Street and Brougham Street. As you can see from the photos, the upper area has been extensively damaged. Most of the damage appears to be on the east facing wall although we didn't get much of a look at the other sides or, of course, the interior".
A car on Rowses Road has its entire front half embedded in liquefaction after falling into a sink hole. Behind it, another car has its wheels stuck in the silt, and in the background a car drives through flooding. The photographer comments, "Perhaps the most impressively stuck car was this small silver hatchback that went head first into a large hole in a street just off Shortland Street (between Shortland and Breezes Road) in Aranui. The rear hatch was open when we came across it. Apparently there had been one person and a dog inside but they managed to escape. The silt has now settled around and inside the car, making the vehicle an intimidating monument to the earthquake".
A photograph of signs on a wall in the Christchurch Art Gallery. The signs read, "Final media trip to the CTV building, 15:00 hours, media opportunity with National Controller and rescue services. This is the last scheduled media hour into the red zone", "Media Briefings, Tuesday 8 March: 10:30 hours, Wednesday 9 March: 15:00 hours, in auditorium" and "Please switch off your cell phones before entering media briefings. Thank you". There is also a diagram of the first and ground floor of the art gallery. The Christchurch Art Gallery served as the temporary Civil Defence headquarters after the 22 February 2011 earthquake.
Members of the University of Canterbury's Digital Media Group in their temporary office in KB02 in Kirkwood Village, the complex of prefabs set up after the earthquakes to provide temporary office and classroom space for the university. The photographer comments, "The e-learning group and the video conferencing team are now located in the Kirkwood Village at the University of Canterbury. It's a very impressive project, about 60 buildings arranged in various configurations with some used for teaching or computer labs, and others as staff offices. We will probably stay here for several years now. Looking back along the centre area from the doors. The e-learning advisers and Herbert Thomas, our team leader, sit along the south wall".
A video showing TV3 celebrities Hilary Barry, Mike McRoberts and Jeremy Corbett surprising customers at Under the Red Veranda. Barry, McRoberts and Corbett are shown taking orders, serving coffees and having a chat to the customers about how they are doing after the earthquakes and what they do to feel all right. The video and event were organised by All Right? as part of 'Outrageous Burst of All Right: Celebrities and Coffee'. The Press published the video in an article by Nicole Mathewson on 1 May 2014. All Right? posted a link to this article on their Facebook Timeline on 1 May 2014.
After the Christchurch earthquakes, the government declared about 8000 houses as Red Zoned, prohibiting further developments in these properties, and offering the owners to buy them out. The government provided two options for owners: the first was full payment for both land and dwelling at the 2007 property evaluation, the second was payment for land, and the rest to be paid by the owner’s insurance. Most people chose the second option. Using data from LINZ combined with data from StatNZ, this project empirically investigates what led people to choose this second option, and what were the implications of these choices for the owners’ wealth and income.
In the last two decades, the retail sector has experienced unprecedented upheaval, having severe implications for economic development and sustenance of traditional inner-city retail districts. In the city of Christchurch, New Zealand, this effect has been exacerbated by a series of earthquakes in 2010/2011 which destroyed much of the traditional retail precinct of the city. After extensive rebuild activity of the city’s infrastructure, the momentum of retailers returning to the inner city was initially sluggish but eventually gathered speed supported by increased international visitation. In early 2020, the return to retail normality came to an abrupt halt after the emergence of the COVID-19 pandemic. This study uses spending and transaction data to analyze the compounding impact of the earthquake’s aftermath, shift to online shopping, and the retail disruption in the Christchurch central retail precinct because of COVID-19. The findings illustrate how consumers through their spending respond to different types of external shocks, altering their consumption patterns and retail mode (offline and online) to cope with an ever-changing retail landscape. Each event triggers different spending patterns that have some similarities but also stark differences, having implications for a sustainable and resilient retail industry in Christchurch. Implications for urban retail precinct development are also discussed.
Paul Nicholls from the University of Canterbury's E-Learning team and Digital Media Group Manager Wayne Riggall in their temporary office in KB02 in Kirkwood Village, the complex of prefabs set up after the earthquakes to provide temporary office and classroom space for the university. The photographer comments, "The e-learning group and the video conferencing team are now located in the Kirkwood Village at the University of Canterbury. It's a very impressive project, about 60 buildings arranged in various configurations with some used for teaching or computer labs, and others as staff offices. We will probably stay here for several years now. Adjoining our area is a space for Wayne, the Digital Media Group Manager, who will organise a sitting area for visitors and small meetings. Beyond Wayne is a closed-off meeting room".
A video of Ladi6 and All Right? staff member Ciaran Fox "getting out and about in Christchurch", talking to Anni Watkin and Shaun Asi from Youth and Cultural Development (YCD). Watkin and Asi talk about their work with YCD and youth both before and after the earthquakes. YCD are an independent organisation providing opportunities to young people and support to those who are at risk of getting caught in a cycle of offending. YCD was set up by Ladi's parents in 1992. All Right? uploaded the video to YouTube on 21 April 2015 and posted a link to the video on their Facebook Timeline on 11 May 2015 at 7:00pm.
A photograph of members of Crack'd for Christchurch working in their workshop. A number of mosaics of flowers and leaves have been laid out on the table in front of them. Boxes of broken china are organised on the shelf behind.Crack'd for Christchurch comments, "Back at the workshop, flower making continues. You can see a table covered with flower motifs, looking amazing. We had to make the flowers at home in the evenings as we all worked during the day. After much trial and error our flower experts (Helen, Sharon, and Jennie) came up with a clever way to attach the tiny pieces to mesh, so they could be transferred to the chair easily. From left: Sharon Wilson, Helen Campbell, and Shirley Walden."
A photograph of the back page of a Christchurch City Council form. The form allowed contractors to apply for the authorisation to enter the Christchurch Red Zone after the 22 February 2011 earthquake. Information on the back reads, "What does this authorisation mean for me? I am wearing appropriate personal protection clothing and equipment. At all times DO NOT enter any red placarded building. You may enter a yellow placarded building for a period of time (no longer than 30 minutes) and follow the instruction of the escorts. A green placarded building may be accessed for longer periods. Please note: do not enter any buildings which are not for the purpose of your authorisation".
Paul Nicholls, a member of the University of Canterbury's E-Learning team, in their temporary office in KB02 in Kirkwood Village, the complex of prefabs set up after the earthquakes to provide temporary office and classroom space for the university. The photographer comments, "The e-learning group and the video conferencing team are now located in the Kirkwood Village at the University of Canterbury. It's a very impressive project, about 60 buildings arranged in various configurations with some used for teaching or computer labs, and others as staff offices. We will probably stay here for several years now. Closer view of our corner of the building. We will have some cubicle partitions soon, but I don't know how we'll configure the space then. It's quite nice being so open, but it may be too noisy".
Paul Nicholls, a member of the University of Canterbury's E-Learning team, in their temporary office in KB02 in Kirkwood Village, the complex of prefabs set up after the earthquakes to provide temporary office and classroom space for the university. The photographer comments, "The e-learning group and the video conferencing team are now located in the Kirkwood Village at the University of Canterbury. It's a very impressive project, about 60 buildings arranged in various configurations with some used for teaching or computer labs, and others as staff offices. We will probably stay here for several years now. Our "techy corner", with Paul waiting for the desk-assembler to come back and put his desk together. My desk is in the corner, and Jess is on the right of the window".
High demolition rates were observed in New Zealand after the 2010-2011 Canterbury Earthquake Sequence despite the success of modern seismic design standards to achieve required performance objectives such as life safety and collapse prevention. Approximately 60% of the multi-storey reinforced concrete (RC) buildings in the Christchurch Central Business District were demolished after these earthquakes, even when only minor structural damage was present. Several factors influenced the decision of demolition instead of repair, one of them being the uncertainty of the seismic capacity of a damaged structure. To provide more insight into this topic, the investigation conducted in this thesis evaluated the residual capacity of moderately damaged RC walls and the effectiveness of repair techniques to restore the seismic performance of heavily damaged RC walls. The research outcome provided insights for developing guidelines for post-earthquake assessment of earthquake-damaged RC structures. The methodology used to conduct the investigation was through an experimental program divided into two phases. During the first phase, two walls were subjected to different types of pre-cyclic loading to represent the damaged condition from a prior earthquake, and a third wall represented a repair scenario with the damaged wall being repaired using epoxy injection and repair mortar after the pre-cyclic loading. Comparisons of these test walls to a control undamaged wall identified significant reductions in the stiffness of the damaged walls and a partial recovery in the wall stiffness achieved following epoxy injection. Visual damage that included distributed horizontal and diagonal cracks and spalling of the cover concrete did not affect the residual strength or displacement capacity of the walls. However, evidence of buckling of the longitudinal reinforcement during the pre-cyclic loading resulted in a slight reduction in strength recovery and a significant reduction in the displacement capacity of the damaged walls. Additional experimental programs from the literature were used to provide recommendations for modelling the response of moderately damaged RC walls and to identify a threshold that represented a potential reduction in the residual strength and displacement capacity of damaged RC walls in future earthquakes. The second phase of the experimental program conducted in this thesis addressed the replacement of concrete and reinforcing steel as repair techniques for heavily damaged RC walls. Two walls were repaired by replacing the damaged concrete and using welded connections to connect new reinforcing bars with existing bars. Different locations of the welded connections were investigated in the repaired walls to study the impact of these discontinuities at the critical section. No significant changes were observed in the stiffness, strength, and displacement capacity of the repaired walls compared to the benchmark undamaged wall. Differences in the local behaviour at the critical section were observed in one of the walls but did not impact the global response. The results of these two repaired walls were combined with other experimental programs found in the literature to assemble a database of repaired RC walls. Qualitative and quantitative analyses identified trends across various parameters, including wall types, damage before repair, and repair techniques implemented. The primary outcome of the database analysis was recommendations for concrete and reinforcing steel replacement to restore the strength and displacement capacity of heavily damaged RC walls.