Search

found 153496 results

Images, eqnz.chch.2010

It's five years since the earthquake, and for the first time I feel a sense that the rebuild is taking effect. In this photo - the left hand building is on the way up, and the right hand building is on the way down.

Images, eqnz.chch.2010

It's five years since the earthquake, and for the first time I feel a sense that the rebuild is taking effect. 113/115 - Natural Framing. In the middle of the rebuild, wall murals are everywhere is Christchurch. The framing is wire fence around ballet dancer, although there is plenty of evidence of framing/boxing around the foundations.

Images, eqnz.chch.2010

Porritt Park was, before the earthquakes, the headquarters of hockey in this region. Two astro-turf fields (the main one was to the left of the building), and corporate offices etc. The earthquakes buckled all the playing surfaces and damaged the buildings; a couple of smaller ones have been removed. Hockey shifted the other side of the cit...

Images, eqnz.chch.2010

Porritt Park was, before the earthquakes, the headquarters of hockey in this region. Two astro-turf fields (the main one was other side of the building), and corporate offices etc. The earthquakes buckled all the playing surfaces and damaged the buildings; a couple of smaller ones have been removed. Hockey shifted the other side of the city t...

Images, eqnz.chch.2010

Pigeons sit on the remains of one of the tallest buildings in Christchurch that was 95% demolished two or three years ago. The basement (now filled with water) and the columns remain. Demolished due to damage from the Christchurch 2011 earthquake.

Images, eqnz.chch.2010

20160419_7732_7D2-400 The City is in Rebuild phase (110/366) A totally different view to a few years ago. Most of the tall buildings have gone and construction is underway on a lot of new buildings, View from across the Estuary in Redcliffs. A couple of days ago the government agency controlling the post-earthquake work (CERA - Canterbury Ea...