A digger scraping damaged tarseal from River Road in Richmond. The photographer comments, "Road repairs".
The Earthquake Commission could have a big job on its hands fixing quake damaged Christchurch homes for a second time.
Photograph captioned by BeckerFraserPhotos, "Freemans Restaurant undergoing repairs in London Street, Lyttelton".
A PDF copy of a handwritten journal kept by Robin Robins, documenting the repair work on his earthquake-damaged home between November 2012 and April 2017. Note that some personal information has been redacted from this document.
Photograph captioned by BeckerFraserPhotos, "Provincial Council Chambers - the careful repair work continues here".
The Medway Street footbridge in Richmond has warped beyond repair in the February 2011 earthquake.
The Medway Street footbridge in Richmond has warped beyond repair in the February 2011 earthquake.
Various rebuilding and repairing activities on Gloucester Street, with road signs and cranes in the background.
A photograph captioned by Paul Corliss, "University of Canterbury glass replacement".
A photograph captioned by Paul Corliss, "University of Canterbury glass replacement".
A photograph captioned by Paul Corliss, "University of Canterbury glass replacement".
Some Christchurch residents fear there's a risk to the region's history if headstones damaged by September's 7.1 magnitude earthquake are not repaired.
The word "repairs" painted on the side of a building has a large crack running through it.
Sewage continues to be pumped into the river while the damaged sewerage system is repaired.
One of the workers helping to repair the damage to the James Hight Library, organising the books.
One of the workers helping to repair the damage to the James Hight Library, organising the books.
One of the workers helping to repair the damage to the James Hight Library, organising the books.
Ongoing repair and deconstruction work on Victoria Street. A demolition site has been turned to a carpark.
Photograph captioned by BeckerFraserPhotos, "Repairs to a house to make it weather tight".
A photograph of a sign giving information about the repair of the Bridge Street Bridge.
A photograph of a sign giving information about the repair of the Bridge Street Bridge.
A guideline created for SCIRT Delivery Teams which outlines the requirements for working around heritage items.
Photograph captioned by BeckerFraserPhotos, "Temporary repairs to damaged windows and roof in Cranmer Court".
An aerial photograph looking south over the Arts Centre on Worcester Boulevard. Scaffolding and cranes can be seen around the building which is having extensive repairs done to it after the earthquakes.
A brochure created for Beca Heritage Week 2014, outlining SCIRT's repair work on heritage structures in the Central City. It was handed out to members of the public at SCIRT's walk and talk tours.
A 'Road Closed' sign on St Johns Street in Woolston, where underground repairs are being undertaken.
Some 10 years on from the devastating Canterbury quakes, the wait is still not over when it comes to law changes needed to improve the Earthquake Commission. The government will not get it done until 2021, if it's re-elected. Meanwhile cases of botched quake repairs needing a fix are still flooding into EQC, Greater Christchurch Regeneration Minister Megan Woods told Checkpoint.
An infographic showing estimated repair costs for major Christchurch City Council facilities.
Workers repairing power lines on Settlers Crescent in Ferrymead. Liquefaction silt can be seen on the road surface.
A cordon check point on Durham Street. The demolition site was a building that housed Laycock Collision Repairs.