A story submitted by Jennifer to the QuakeStories website.
A story submitted by Hilary Lakeman to the QuakeStories website.
A story submitted by Anonymous to the QuakeStories website.
A story submitted by Anonymous to the QuakeStories website.
A story submitted by Caroline Oliver to the QuakeStories website.
A story submitted by Ginny Larsen to the QuakeStories website.
A story submitted by Matthew F to the QuakeStories website.
A story submitted by Anonymous to the QuakeStories website.
A story submitted by LC to the QuakeStories website.
A story submitted by Joan Curry to the QuakeStories website.
A story submitted by David Chilvers to the QuakeStories website.
A story submitted by Sarah to the QuakeStories website.
A story submitted by John Clark to the QuakeStories website.
A story submitted by Anonymous to the QuakeStories website.
A video made as part of Julia Holden's Boosted funding campaign. The campaign aimed to get five of Julia's paintings of post-quake Christchurch onto billboards in Auckland.
The progressive damage and subsequent demolition of unreinforced masonry (URM) buildings arising from the Canterbury earthquake sequence is reported. A dataset was compiled of all URM buildings located within the Christchurch CBD, including information on location, building characteristics, and damage levels after each major earthquake in this sequence. A general description of the overall damage and the hazard to both building occupants and to nearby pedestrians due to debris falling from URM buildings is presented with several case study buildings used to describe the accumulation of damage over the earthquake sequence. The benefit of seismic improvement techniques that had been installed to URM buildings is shown by the reduced damage ratios reported for increased levels of retrofit. Demolition statistics for URM buildings in the Christchurch CBD are also reported and discussed. VoR - Version of Record
The repair of Christchurch's earthquake damaged arts centre has revealed details hidden from view for forty years including a badminton court and the site of an old swimming pool.
Some of the men and women who risked their lives to save others in the aftermath of the February 2011 earthquakes in Christchurch have been recognised for their bravery.
A book written by two Christchurch women to help the region's children deal with the stress of the earthquakes has been endorsed by the director of Civil Defence, John Hamilton.
None
A document describing the early warning system to alert team members of ground and structural movement at the Arch.
A document outlining the methodology for rebuilding horizontal infrastructure in the central city, covering wastewater (local reticulation and trunk), wastewater pump stations, storm water (local reticulation and trunk), potable water, roads, and bridges.
A document outlining how the rebuild of wastewater, water supply, storm water and roading infrastructure was to be managed and coordinated with other programmes of work in the central city.
A PDF copy of a spreadsheet used to identify the impacts of traffic management in the central city.
A diagram illustrating how the rebuild of the three waters and roading infrastructure was to be managed and coordinated with other programmes of work in the central city.
A document which outlines several of Downer's safety initiatives, developed when working in the Central Business District.
A bowtie diagram which SCIRT used to evaluate the risks associated with and analyse the causal relationships associated with service strikes.
A pdf copy of a presentation delivered at Building a Better New Zealand (BBNZ 2014) Conference. The presentation examines the relationship between innovation and productivity improvement in the construction industry.
A video of a CTV News broadcast of a Ministry of Women's Affairs initiative to attract more women into trades and construction related jobs.
A pdf copy of a spreadsheet tool used by designers to undertake a whole of life evaluation of rebuild options.