A photograph of members of the Wellington Emergency Management Office Emergency Response Team inside an earthquake-damaged house. One of the ERT members is climbing a staircase covered in rubble from a collapsed interior wall.
A photograph of the badly-damaged Edward Gibbon building on Tuam Street. The building has been cordoned off with wire fencing and road cones and the footpath behind the fence is covered in fallen bricks.
A photograph of a cordon made from wire fencing, road cones and tape on the intersection of Manchester and Welles Streets. In the background, bricks from a earthquake-damaged building are piled on the footpath.
Tents set up in the Arts car park at the University of Canterbury after the 22 February 2011 earthquake. The tents were used as temporary lecture rooms while the buildings were being checked for damage.
A photograph of members of the Wellington Emergency Management Office Emergency Response Team working on Tuam Street near the intersection of High Street. In the background are several piles of rubble from earthquake-damaged buildings.
The Cathedral of the Blessed Sacrament on Barbadoes Street, severely damaged after the 22 February 2011 earthquake. The domes on either side of the Cathedral have collapsed and are lying in the area in front.
Photograph captioned by Fairfax, "Hugh Hobden, the Model Yacht Club's Commodore, said the club's sailing has been disrupted with the September earthquake severely damaging Victoria Lake, forcing their members to relocate to the Groynes ponds".
Photograph captioned by Fairfax, "Hugh Hobden, the Model Yacht Club's Commodore, said the club's sailing has been disrupted with the September earthquake severely damaging Victoria Lake, forcing their members to relocate to the Groynes ponds".
A photograph of the earthquake damage to the back of a building on Madras Street. The outer walls of the building have collapsed and the bricks and other rubble have spilled onto the car park.
A close-up photograph of the damaged tiles and stonework on the roof on the north side of Christ Church Cathedral. The small stained-glass window at the top of the gable has been broken.
Photograph captioned by Fairfax, "Gunyah homestead was badly damaged during the September 4th 2010 earthquake, but the Cottrell family are picking up the pieces and rebuilding. The dining room directly below the master bedroom".
Photograph captioned by Fairfax, "Gunyah homestead was badly damaged during the September 4th 2010 earthquake, but the Cottrell family are picking up the pieces and rebuilding. The dining room directly below the master bedroom".
20130312_4425_1D3-150 South New Brighton boardwalk track [Explored] Damaged in the earthquakes, now with more bends and not level as it was before. Selected for Explore. #306 12/05/13 #3402
This building at the corner of Barbadoes Street / St Asaph Street was so badly damaged in the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010 that it had to be demolished
By closely examining the performance of a 22-storey steel framed building in Christchurch subject to various earthquakes over the past seven years, it is shown that a number of lessons can be learnt regarding the cost-effective consideration of non-structural elements. The first point in this work is that non-structural elements significantly affected the costs associated with repairing steel eccentrically braced frame (EBF) links. The decommissioning or rerouting of non-structural elements in the vicinity of damaged links in the case study building attributed to approximately half the total cost of their repair. Such costs could be significantly reduced if the original positioning of non-structural elements took account of the potential need to repair the EBF links. The second point highlighted is the role that pre-cast cladding apparently played on the distribution and type of damage in the building. Loss estimates obtained following the FEMA P-58 framework vary considerably when cladding is or isnt modelled, both because of changes to drift demands up the height of the building and because certain types of subsequent damage are likely to be cheaper to repair than others. Finally, costly repairs to non-structural partition walls were required not only after the moment magnitude 7.1 earthquake in 2010 but also in multiple aftershocks in the years that followed. Repair costs associated with aftershock events exceeded those from the main event, emphasizing the need to consider aftershocks within modern performance-based earthquake engineering and also the opportunity that exists to make more cost-effective repair strategies following damaging earthquakes.
In recent Canterbury earthquakes, structures have performed well in terms of life safety but the estimated total cost of the rebuild was as high as $40 billion. The major contributors to this cost are repair/demolition/rebuild cost, the resulting downtime and business interruption. For this reason, the authors are exploring alternate building systems that can minimize the downtime and business interruption due to building damage in an earthquake; thereby greatly reducing the financial implications of seismic events. In this paper, a sustainable and demountable precast reinforced concrete (RC) frame system in which the precast members are connected via steel tubes/plates or steel angles/plates and high strength friction grip (HSFG) bolts is introduced. In the proposed system, damaged structural elements in seismic frames can be easily replaced with new ones; thereby making it an easily and quickly repairable and a low-loss system. The column to foundation connection in the proposed system can be designed either as fixed or pinned depending on the requirement of strength and stiffness. In a fixed base frame system, ground storey columns will also be damaged along with beams in seismic events, which are to be replaced after seismic events; whereas in a pin base frame only beams (which are easy to replace) will be damaged. Low to medium rise (3-6 storey) precast RC frame buildings with fixed and pin bases are analyzed in this paper; and their lateral capacity, lateral stiffness and natural period are scrutinized to better understand the pros and cons of the demountable precast frame system with fixed and pin base connections.
The Canterbury earthquakes, which started with the 7.1 magnitude event on September 4, 2010, caused significant damage in the region. The September 4 earthquakes brought substantial damage to land, buildings, and infrastructure, while the 6.3 magnitude earthquake on February 22, 2011 (and its subsequent aftershocks), brought even greater property damage, but also significant loss of life in addition to the region. Thousands were injured, and 185 persons died. A national State of Emergency was declared and remained in effect until April 30, 2011. A significant number of people required immediate assistance and support to deal with loss, injury, trauma experiences, and property damages. Many had to find alternate accommodation as their houses were too damaged to stay in. Of those affected, many were already vulnerable, and others had been too traumatized by the events to effectively deal with the challenges they were faced with. A number of human service organizations in the region, from both government and non-government sectors, joined forces to be able to more effectively and efficiently help those in need. This was the start of what would become known as the Earthquake Support Coordination Service. The aim of this report is to present an evaluation of the Earthquake Support Coordination Service and its collaborative organization, based on documentation and interviews with key stakeholders of the service. The aim is also to evaluate the service based on perspectives gathered among the clients as well as the coordinators working in the service. The final aim is to offer a reflection on the service model, and on what factors enabled the service, as well as recommendations regarding aspects of the service which may require review, and aspects which may be useful in other contexts.
Shows the face of a man with a large tear rolling down his cheek ; in the tear is the word 'Christchurch'. Context - On 22 February 2011 at 12:51 pm (NZDT), Christchurch experienced a major magnitude 6.3 earthquake, which resulted in severe damage and many casualties. A National State of Emergency has been declared. This followed on from an original magnitude 7.1 earthquake on 4 September 2010 which did far less damage and in which no-one died. Quantity: 1 digital cartoon(s).
Beverly Forrester farms near Harden which is down the road from Hanmer Springs. Road damage means she's cut off from the outside world, apart from her phone Beverly was caught up in the Christchurch earthquake, so the events of the last 24hrs have been quite trying for her.
A blog about the Family-owned and run bar in Poplar Lanes, Christchurch - home of live entertainment with bands and DJs, every Thursday to Saturday. Archived instances cover the Canterbury Earthquake when the bar had to close down due to damage.
Provides a map, the geological background, describes the effects, both in Christchurch and its surrounding areas, the damage to notable buildings, the financial exposure, the emergency response and relief efforts and the media coverage of the earthquake.
Site of SCIRT, an alliance between CERA, Christchurch City Council, the NZTA, and companies involved in the rebuild. Includes information about SCIRT; news; works notices; and information about damage assessment and rebuilding of roads, fresh water, wastewater and stormwater networks.
The Governors Bay community weren't going to accept a Christchurch council decision to close the 140 year old jetty following earthquake damage in 2011. Nick Harwood's part of the group and handily a geotechnical engineer.
A photograph of earthquake-damaged buildings down Manchester Street. Crowds have gathered at the intersection with High Street in the distance, after evacuating their buildings during the 22 February 2011 earthquake. Rubble from the building to the left covers the road.
A digital copy of a painting by Julia Holden. The painting is of Lichfield Street, looking east from the intersection of Colombo Street. The road has been fenced off and there are damaged buildings in the background.
A photograph of the earthquake damaged M J Knowles Building on Tuam Street. The wall has either collapsed or been removed leaving the inside of the building exposed. Loose bricks from the wall cover the footpath.
A photograph of the earthquake damaged M J Knowles Building on Tuam Street. The wall has either collapsed or been removed leaving the inside of the building exposed. Loose bricks from the wall cover the footpath.
The damaged Provincial Council Legislative Chamber on Durham Street in the aftermath of the 22 February earthquake. The building's roof and walls have collapsed, as has the scaffolding which was erected to repair it after the 4 September earthquake.
A photograph of the earthquake damaged M J Knowles Building on Tuam Street. The wall has either collapsed or been removed leaving the inside of the building exposed. Loose bricks from the wall cover the footpath.
Photograph captioned by Fairfax, "Prime Minister John Key on his visit to Kaiapoi and Hororata to meet people badly affected and see the damage from the earthquake. Standing outside Blackwell's Department Store in Kaiapoi town centre".