Photograph captioned by BeckerFraserPhotos, "Remnants of the old Methodist Church, Winchester Street, Lyttelton".
Photograph captioned by BeckerFraserPhotos, "The side entrance to the Peterborough Apartments on Montreal Street".
A photograph of a digger demolishing a building. The photograph is captioned by BeckerFraserPhotos, "The old Sydenham post office on the corner of Colombo and Brougham Streets".
Stone walls have collapsed on the Cranmer Courts building, exposing the rooms within. Building jacks hold up the corner of an upper room, preventing its further collapse. The photographer comments, "A bike ride around the CBD. Cranmer Courts, Montreal St".
Photograph captioned by BeckerFraserPhotos, "The Peterborough Apartments on Montreal Street".
Photograph captioned by BeckerFraserPhotos, "The Provincial Council Chambers, Durham Street".
A photograph captioned by BeckerFraserPhotos, "Provincial Council Chambers, Durham Street".
A photograph captioned by BeckerFraserPhotos, "Provincial Council Chambers, Durham Street".
A photograph captioned by BeckerFraserPhotos, "Provincial Council Chambers, Durham Street".
A photograph captioned by BeckerFraserPhotos, "Provincial Council Chambers, Durham Street".
A photograph of paving stones lying loose on the ground. The photograph is captioned by BeckerFraserPhotos, "Hereford Street, near the Hanafins Building".
Damage to the Strange's Building on High Street. The stone facade of the upper storey has collapsed, exposing the wooden and brick structures beneath.
Damage to the Strange's Building on High Street. The stone facade of the upper storey has collapsed, exposing the wooden and brick structures beneath.
Damage to the Strange's Building on Lichfield Street. The stone facade of the upper storey has collapsed, exposing the wooden and brick structures beneath.
A photograph captioned by BeckerFraserPhotos, "Workers at the Provincial Council Chambers, Durham Street".
The Victoria clock tower on the corner of Montreal and Victoria Streets. The spire at the top of the tower has been knocked off centre and wooden bracing has been placed against the bottom of the tower to keep it secure.
A photograph of a detail of the front of Christ Church Cathedral. The upper part of the front wall has crumbled leaving the inside space exposed.
A photograph of a detail of the front of Christ Church Cathedral. The upper part of the front wall has crumbled leaving the inside space exposed.
Cracked brickwork in the Victoria clock tower on the corner of Montreal and Victoria Streets. Wooden bracing has been placed under the arch to hold the brickwork together.
A photograph of a detail of the front of Christ Church Cathedral. A stained-glass window remains intact despite the collapsed stonework that surrounds it. The upper part of the front wall has crumbled. Steel bracing has been placed against the wall to limit further damage.
A photograph of shipping containers placed in front of the north side of Christ Church Cathedral. The shipping containers are there to protect the street from falling rubble.
A close-up photograph of the damaged tiles and stonework on the roof on the north side of Christ Church Cathedral. The small stained-glass window at the top of the gable has been broken.
The southern side of the Christ Church Cathedral with boarded up windows and damage to the roof above both of the transepts. Damaged masonry has been piled on the ground in front and one of the spires has been removed and braced with steel in the foreground.
Seismic retrofitting of unreinforced masonry buildings using posttensioning has been the topic of many recent experimental research projects. However, the performance of such retrofit designs in actual design level earthquakes has previously been poorly documented. In 1984 two stone masonry buildings within The Arts Centre of Christchurch received posttensioned seismic retrofits, which were subsequently subjected to design level seismic loads during the 2010/2011 Canterbury earthquake sequence. These 26 year old retrofits were part of a global scheme to strengthen and secure the historic building complex and were subject to considerable budgetary constraints. Given the limited resources available at the time of construction and the current degraded state of the steel posttension tendons, the posttensioned retrofits performed well in preventing major damage to the overall structure of the two buildings in the Canterbury earthquakes. When compared to other similar unretrofitted structures within The Arts Centre, it is demonstrated that the posttensioning significantly improved the in-plane and out-of-plane wall strength and the ability to limit residual wall displacements. The history of The Arts Centre buildings and the details of the Canterbury earthquakes is discussed, followed by examination of the performance of the posttension retrofits and the suitability of this technique for future retrofitting of other historic unreinforced masonry buildings. http://www.aees.org.au/downloads/conference-papers/2013-2/
A mini golf course on a the site of a demolished building. It has been built by Gap Filler out of stones and green felt.
A mini golf course on a the site of a demolished building. It has been built by Gap Filler out of stones and green felt.
A photograph of the earthquake damage to the Christ Church Cathedral.
Photograph captioned by BeckerFraserPhotos, "Provincial Council Chambers viewed from Armagh Street".
A photograph of the earthquake damage to the Christ Church Cathedral.
Photograph captioned by BeckerFraserPhotos, "St John's Church, Latimer Square".