Search

found 142 results

Videos, UC QuakeStudies

A video of the Christchurch central city recorded shortly after the 22 February 2011 earthquake. In the video, Press reporter Olivia Carville describes the experiences of people within the central city. There is also footage of a woman being rescued from the ChristChurch Cathedral, people trapped in the Press building, damaged buildings on Colombo Street and Manchester Street, people evacuating the Forsyth Barr building using a rope, and people gathering in Latimer Square.

Images, UC QuakeStudies

Damage to the church hall of St John the Baptist Church in Latimer Square. The roof has been weather proofed with plywood and there are cracks in the buildings masonry. The remains of fallen bricks can be seen on the footpath. A safety fence has been erected around the building.

Images, UC QuakeStudies

A photograph of a detail of the front of Christ Church Cathedral. A stained-glass window remains intact despite the collapsed stonework that surrounds it. The upper part of the front wall has crumbled. Steel bracing has been placed against the wall to limit further damage.

Images, UC QuakeStudies

A photograph captioned by BeckerFraserPhotos, "A view of Saint John the Baptist Anglican Church in Latimer Square. The church hall to the right of the church has been demolished. The empty site in the foreground is where the Arrow International building was before demolition".

Images, UC QuakeStudies

A photograph looking south down Colombo Street from the intersection of Gloucester Street. In the distance a crane is hanging over Cathedral Square. Below the crane is a pile of rubble from the partially-demolished tower of ChristChurch Cathedral. To the right is a smaller crane and a steel structure which will be used to brace the front of the Cathedral.

Images, UC QuakeStudies

Damage to the church hall of St John the Baptist Church in Latimer Square. The roof has been weather proofed with plywood and there are cracks in the buildings masonry. The remains of fallen bricks can be seen on the footpath. A safety fence has been erected around the building.