Search

found 4850 results

Audio, Radio New Zealand

Some Canterbury homeowners are worried that missed earthquake damage to concrete slabs could result in another big bill for the taxpayer. This comes only weeks after EQC told Checkpoint that the cost of mis-scoped damage or defective repairs following the Canterbury earthquakes could cost up to $1 billion. This includes $450 million for botched repairs, including badly repaired rubble ring foundations, and $300 million for an ex gratia payment to about 1000 over-cap onsold homeowners. But some Canterbury homeowners who bought after the earthquakes - and did their due diligence - are only discovering damage to their concrete slab foundations now. Logan Church reports.

Audio, Radio New Zealand

As we approach the tenth anniversary of the Christchurch earthquake there are renewed calls for an inquiry into how Southern Response dealt with Canterbury earthquake claimants. Last year the government set up a support package for those who were short changed by Southern Response for their earthquake repairs. It came after a landmark High Court case found Southern Response misled and deceived Karl and Alison Dodds. Insurance claimants advocate, Ali Jones, says ten years on, lessons haven't been learned from how people were treated by Southern Response. She told RNZ reporter Sally Murphy that dealing with them is hell.

Audio, Radio New Zealand

New Zealanders are paying too much for house and contents insurance, according to a new survey. Consumer NZ's price comparison survey shows climate and natural hazard risk is being factored in, and is more expensive than ever. Quotes for a large house differed by more than $3,000 across Auckland, Hamilton, Wellington, Christchurch, and Dunedin, and there's a more than $2,000 difference between the cheapest and most expensive policies on offer for a standard-sized house. If you live somewhere with a higher chance of earthquakes - such as Wellington or Christchurch - you'll be charged more for insurance. The cost of house and contents insurance has risen by 5.6% this year, over the past ten years it's gone up 150%. Kathryn is joined by Consumer NZ's Gemma Rasmussen and Katrina Shanks Chief Executive of Financial Advice New Zealand, which represents independent and professional financial advisors.

Research papers, University of Canterbury Library

Recent advances in timber design at the University of Canterbury have led to new structural systems that are appropriate for a wide range of building types, including multi-storey commercial office structures. These buildings are competitive with more traditional construction materials in terms of cost, sustainability and structural performance. This paper provides seismic design recommendations and analytical modelling approaches, appropriate for the seismic design of post-tensioned coupled timber wall systems. The models are based on existing seismic design theory for precast post-tensioned concrete, modified to more accurately account for elastic deformation of the timber wall systems and the influence of the floor system. Experimental test data from a two storey post-tensioned timber building, designed, constructed and tested at the University of Canterbury is used to validate the analytical models.

Images, Alexander Turnbull Library

The cartoon shows a family standing proudly in front of their tent which has 'No leaks!', is 'Earthquake-proof!', and 'Affordable!' An 'Optional extra' is an 'inflatable base for tsunami-prone areas'. Text below reads 'Not suitable for volcanic areas. Refers to the problems that have been experienced in the last couple of decades with leaky homes because of slack building codes (which have now been tightened), refers also to the Canterbury earthquake of 4th September with its aftermath of rebuilding for greater earthquake proofing and lastly refers to the problem of people being unable to afford houses. Quantity: 1 digital cartoon(s).

Research papers, University of Canterbury Library

This paper concerns the explicit consideration of near-fault directivity in conventional ground motion prediction models, and its implication for probabilistic seismic hazard analysis (PSHA) in New Zealand. The proposed approach utilises recently developed models by Shahi & Baker (2011), which account for both the 'narrowband' nature of the directivity pulse on spectral ordinates, and the probability of pulse occurrence at the site of interest. Furthermore, in order to correctly consider directivity, distributed seismicity sources are considered as finite-faults, as opposed to their (incorrect) conventional treatment as point-sources. The significance of directivity on hazard analysis results is illustrated for various vibration periods at generic sites located in Christchurch and Otira, two locations whose seismic hazard is comprised of notably different seismic sources. When compared to the PSHA results considering directivity and distributed seismicity as finite faults, it is shown that the NZS1170.5:2004 directivity factor is notably unconservative for all vibration periods in Otira (i.e. high seismic hazard region); and unconservative for Christchurch at short-to-moderate vibration periods ( < 3s); but conservative at long periods ( > 4s).

Research papers, The University of Auckland Library

This article argues that teachers deserve more recognition for their roles as first responders in the immediate aftermath of a disaster and for the significant role they play in supporting students and their families through post-disaster recovery. The data are drawn from a larger study, 'Christchurch Schools Tell Their Earthquake Stories' funded by the United Nations Educational, Scientific and Cultural Organisation and the University of Auckland, in which schools were invited to record their earthquake stories for themselves and for historical archives. Data were gathered from five primary schools between 2012 and 2014. Methods concerned mainly semi-structured individual or group interviews and which were analysed thematically. The approach was sensitive, flexible and participatory with each school being able to choose its focus, participants and outcome. Participants from each school generally included the principal and a selection of teachers, students and parents. In this study, the data relating to the roles of teachers were separated out for closer analysis. The findings are presented as four themes: immediate response; returning to (new) normal; care and support; and long term effects.

Images, Alexander Turnbull Library

Shows Minister for Christchurch Earthquake Recovery Gerry Brownlee delighted with his plan to rebuild Christchurch and to have it paid for buy the PM's casino. Context: Refers to the Christchurch Central Development Unit that Minister for Christchurch Earthquake Recovery Gerry Brownlee has put in place. Refers also to the very controversial deal that Prime Minister John Key has made with Auckland's SkyCity to the effect that SkyCity will pay the full construction cost of a new convention centre - estimated at $350 million, in return for being allowed to add more gaming tables and machines, and extending its licence beyond 2021. Colour and black and white versions of this cartoon are available Quantity: 2 digital cartoon(s).

Research papers, University of Canterbury Library

Over 900 buildings in the Christchurch central business district and 10,000 residential homes were demolished following the 22nd of February 2011 Canterbury earthquake, significantly disrupting the rebuild progress. This study looks to quantify the time required for demolitions during this event which will be useful for future earthquake recovery planning. This was done using the Canterbury Earthquake Recovery Authority (CERA) demolition database, which allowed an in-depth look into the duration of each phase of the demolition process. The effect of building location, building height, and the stakeholder which initiated the demolition process (i.e. building owner or CERA) was investigated. The demolition process comprises of five phases; (i) decision making, (ii) procurement and planning, (iii) demolition, (iv) site clean-up, and (v) completion certification. It was found that the time required to decide to demolish the building made up majority of the total demolition duration. Demolition projects initiated by CERA had longer procurement and planning durations, but was quicker in other phases. Demolished buildings in the suburbs had a longer decision making duration, but had little effect on other phases of the demolition process. The decision making and procurement and planning phases of the demolition process were shorter for taller buildings, though the other phases took longer. Fragility functions for the duration of each phase in the demolition process are provided for the various categories of buildings for use in future studies.

Research papers, University of Canterbury Library

The development of cheap, whilst effective and relatively non-invasive structural retrofit techniques for existing non-ductile reinforced concrete (RC) structures still remains the most challenging issue for a wide implementation on a macro scale. Seismic retrofit is too often being confused as purely structural strengthening. As part of a six-years national project on “Seismic retrofit solutions for NZ multi-storey building”, focus has been given at the University of Canterbury on the development of a counter-intuitive retrofit strategy for earthquake vulnerable existing rc frame, based on a “selective weakening” (SW) approach. After an overview of the SW concept, this paper presents the experimental and numerical validation of a SW retrofit strategy for earthquake vulnerable existing RC frame with particular focus on the exterior beam-column (b-c) joints. The exterior b-c joint is a critically vulnerable region in many existing pre-1970s RC frames. By selectively weakening the beam by cutting the bottom longitudinal reinforcements and/or adding external pre-stressing to the b-c joint, a more desirable inelastic mechanism can be attained, leading to improved global seismic performance. The so-called SW retrofit is implemented on four 2/3-scaled exterior RC b-c joint subassemblies, tested under quasi-static cyclic loading at the University of Canterbury. Complemented by refined 3D Finite Element (FE) models and dynamic time-history analyses results, the experimental results have shown the potential of a simple and cost-effective yet structurally efficient structural rehabilitation technique. The research also demonstrated the potential of advanced 3D fracture-mechanics-based microplane concrete modelling for refined FE analysis of non-ductile RC b-c joints.

Research papers, University of Canterbury Library

High-quality ground motion records are required for engineering applications including response history analysis, seismic hazard development, and validation of physics-based ground motion simulations. However, the determination of whether a ground motion record is high-quality is poorly handled by automation with mathematical functions and can become prohibitive if done manually. Machine learning applications are well-suited to this problem, and a previous feed-forward neural network was developed (Bellagamba et al. 2019) to determine high-quality records from small crustal events in the Canterbury and Wellington regions for simulation validation. This prior work was however limited by the omission of moderate-to-large magnitude events and those from other tectonic environments, as well as a lack of explicit determination of the minimum usable frequency of the ground motion. To address these shortcomings, an updated neural network was developed to predict the quality of ground motion records for all magnitudes and all tectonic sources—active shallow crustal, subduction intraslab, and subduction interface—in New Zealand. The predictive performance of the previous feed-forward neural network was matched by the neural network in the domain of small crustal records, and this level of predictive performance is now extended to all source magnitudes and types in New Zealand making the neural network applicable to global ground motion databases. Furthermore, the neural network provides quality and minimum usable frequency predictions for each of the three orthogonal components of a record which may then be mapped into a binary quality decision or otherwise applied as desired. This framework provides flexibility for the end user to predict high-quality records with various acceptability thresholds allowing for this neural network to be used in a range of applications.

Videos, UC QuakeStudies

A video clip of young children interacting with a large-scale, temporary installation titled Orbis. The installation is on Lichfield Street. The installation was created by students from The University of Auckland for CityUps - a 'city of the future for one night only', and the main event of FESTA 2014.

Videos, UC QuakeStudies

A video clip of people interacting with a large-scale, temporary installation titled Orbis. The installation is on Lichfield Street. The installation was created by students from The University of Auckland for CityUps - a 'city of the future for one night only', and the main event of FESTA 2014.

Videos, UC QuakeStudies

A video clip of a large-scale, temporary installation titled ING. The installation is at the intersection of High Street, Lichfield Street and Manchester Street. The installation was created by students from Unitec, for CityUps - a 'city of the future for one night only', and the main event of FESTA 2014.

Videos, UC QuakeStudies

A video clip of a large-scale, temporary installation titled ING. The installation is at the intersection of High Street, Lichfield Street and Manchester Street. The installation was created by students from Unitec, for CityUps - a 'city of the future for one night only', and the main event of FESTA 2014.

Videos, UC QuakeStudies

A video clip of a large-scale, temporary installation titled Synthesis. The installation is on the corner of High Street and Lichfield Street. The installation was created by students from CPIT for CityUps - a 'city of the future for one night only', and the main event of FESTA 2014.

Videos, UC QuakeStudies

A video clip showing close up footage of a cake stand, which was part of a large-scale, temporary installation titled Antigravity. The installation was created by students from The University of Auckland for CityUps - a 'city of the future for one night only', and the main event of FESTA 2014.

Videos, UC QuakeStudies

A video clip of a large-scale, temporary installation titled ING. The installation is at the intersection of High Street, Lichfield Street and Manchester Street. The installation was created by students from Unitec, for CityUps - a 'city of the future for one night only', and the main event of FESTA 2014.

Videos, UC QuakeStudies

A video clip of a large-scale, temporary installation titled ING. The installation is at the intersection of High Street, Lichfield Street and Manchester Street. The installation was created by students from Unitec, for CityUps - a 'city of the future for one night only', and the main event of FESTA 2014.

Videos, UC QuakeStudies

A video clip of a large-scale, temporary installation titled ING. The installation is at the intersection of High Street, Lichfield Street and Manchester Street. The installation was created by students from Unitec, for CityUps - a 'city of the future for one night only', and the main event of FESTA 2014.

Videos, UC QuakeStudies

A video clip depicting part of a large-scale, temporary installation titled Continuum, and another in the distance titled Upload. The installations were created by students from The University of Auckland for CityUps - a 'city of the future for one night only', and the main event of FESTA 2014.

Videos, UC QuakeStudies

A video clip showing close-up footage of a large-scale, temporary installation titled Antigravity. The installation is on Lichfield Street. The installation was created by students from The University of Auckland for CityUps - a 'city of the future for one night only', and the main event of FESTA 2014.

Videos, UC QuakeStudies

A video clip of a large-scale, temporary installation titled Synthesis. The installation is on the corner of High Street and Lichfield Street. The installation was created by students from CPIT for CityUps - a 'city of the future for one night only', and the main event of FESTA 2014.

Videos, UC QuakeStudies

A video clip of a large-scale, temporary installation titled ING. The installation is at the intersection of High Street, Lichfield Street and Manchester Street. The installation was created by students from Unitec, for CityUps - a 'city of the future for one night only', and the main event of FESTA 2014.