Shows two frames. First frame shows man with moustache. The second frame shows an unshaven bald man with a black eye and bandaged head wearing a daffodil. Text reads 'The changing face of Christchurch', 'Then' and 'Now'. Context: Sport Canterbury called for Hagley Park land to be used for an aquatic facility or indoor stadium (Stuff 9 May 2012) Quantity: 1 digital cartoon(s).
Test results are presented for wall-diaphragm plate anchor connections that were axially loaded to rupture. These connection samples were extracted post-earthquake by sorting through the demolition debris from unreinforced masonry (URM) buildings damaged in the Christchurch earthquakes. Unfortunately the number of samples available for testing was small due to the difficulties associated with sample collection in an environment of continuing aftershocks and extensive demolition activity, when personal safety combined with commercial activity involving large demolition machinery were imperatives that inhibited more extensive sample collection for research purposes. Nevertheless, the presented data is expected to be of assistance to structural engineers undertaking seismic assessment of URM buildings that have existing wall-diaphragm anchor plate connections installed, where it may be necessary to estimate the capacity of the existing connection as an important parameter linked with determining the current seismic capacity of the building and therefore influencing the decision regarding whether supplementary connections should be installed.
Ingham and Biggs were in Christchurch during the M6.3, 22 February 2011 earthquake and Moon arrived the next day. They were enlisted by officials to provide rapid assessment of buildings within the Central Business District (CBD). In addition, they were asked to: 1) provide a rapid assessment of the numbers and types of buildings that had been damaged, and 2) identify indicator buildings that represent classes of structures that can be used to monitor changing conditions for each class following continuing aftershocks and subsequent damage. This paper explains how transect methodology was incorporated into the rapid damage assessment that was performed 48 hours after the earthquake. Approximately 300 buildings were assessed using exterior Level 1 reporting techniques. That data was used to draw conclusions on the condition of the entire CBD of approximately 4400 buildings. In the context of a disaster investigation, a transect involves traveling a selected path assessing the condition of the buildings and documenting the class of each building, and using the results in conjunction with prior knowledge relating to the overall population of buildings affected in the area of the study. Read More: http://ascelibrary.org/doi/abs/10.1061/9780784412640.033
This paper shows an understanding of the availability of resources in post-disaster reconstruction and recovery in Christchurch, New Zealand following its September 4, 2010 and February 22, 2011 earthquakes. Overseas experience in recovery demonstrates how delays and additional costs may incur if the availability of resources is not aligned with the reconstruction needs. In the case of reconstruction following Christchurch earthquakes, access to normal resource levels will be insufficient. An on-line questionnaire survey, combined with in-depth interviews was used to collect data from the construction professionals that had been participated in the post-earthquake reconstruction. The study identified the resources that are subject to short supply and resourcing challenges that are currently faced by the construction industry. There was a varied degree of impacts felt by the surveyed organisations from resource shortages. Resource pressures were primarily concentrated on human resources associated with structural, architectural and land issues. The challenges that may continue playing out in the longer-term reconstruction of Christchurch include limited capacity of the construction industry, competition for skills among residential, infrastructure and commercial sectors, and uncertainties with respect to decision making. Findings provide implications informing the ongoing recovery and rebuild in New Zealand. http://www.iiirr.ucalgary.ca/Conference-2012
The 22nd February 2011, Mw 6.3 Christchurch earthquake in New Zealand caused major damage to critical infrastructure, including the healthcare system. The Natural Hazard Platform of NZ funded a short-term project called “Hospital Functions and Services” to support the Canterbury District Health Board’s (CDHB) efforts in capturing standardized data that describe the effects of the earthquake on the Canterbury region’s main hospital system. The project utilised a survey tool originally developed by researchers at Johns Hopkins University (JHU) to assess the loss of function of hospitals in the Maule and Bío-Bío regions following the 27th February 2010, Mw 8.8 Maule earthquake in Chile. This paper describes the application of the JHU tool for surveying the impact of Christchurch earthquake on the CDHB Hospital System, including the system’s residual capacity to deliver emergency response and health care. A short summary of the impact of the Christchurch earthquake on other CDHB public and private hospitals is also provided. This study demonstrates that, as was observed in other earthquakes around the world, the effects of damage to non-structural building components, equipment, utility lifelines, and transportation were far more disruptive than the minor structural damage observed in buildings (FEMA 2007). Earthquake related complications with re-supply and other organizational aspects also impacted the emergency response and the healthcare facilities’ residual capacity to deliver services in the short and long terms.
The Canterbury earthquake sequence in New Zealand’s South Island induced widespread liquefaction phenomena across the Christchurch urban area on four occasions (4 Sept 2010; 22 Feb; 13 June; 23 Dec 2011), that resulted in widespread ejection of silt and fine sand. This impacted transport networks as well as infiltrated and contaminated the damaged storm water system, making rapid clean-up an immediate post-earthquake priority. In some places the ejecta was contaminated by raw sewage and was readily remobilised in dry windy conditions, creating a long-term health risk to the population. Thousands of residential properties were inundated with liquefaction ejecta, however residents typically lacked the capacity (time or resources) to clean-up without external assistance. The liquefaction silt clean-up response was co-ordinated by the Christchurch City Council and executed by a network of contractors and volunteer groups, including the ‘Farmy-Army’ and the ‘Student-Army’. The duration of clean-up time of residential properties and the road network was approximately 2 months for each of the 3 main liquefaction inducing earthquakes; despite each event producing different volumes of ejecta. Preliminary cost estimates indicate total clean-up costs will be over NZ$25 million. Over 500,000 tonnes of ejecta has been stockpiled at Burwood landfill since the beginning of the Canterbury earthquakes sequence. The liquefaction clean-up experience in Christchurch following the 2010-2011 earthquake sequence has emerged as a valuable case study to support further analysis and research on the coordination, management and costs of large volume deposition of fine grained sediment in urban areas.
This thesis is about many things, not least of all the September 4th 2010 and February 22nd 2011 earthquakes that shook Christchurch, New Zealand. A city was shaken, events which worked to lay open the normally invisible yet vital objects, processes and technologies which are the focus of inquiry: the sewers, pipes, pumps, the digital technologies, the land and politics which constitute the Christchurch wastewater networks. The thesis is an eclectic mix drawing together methods and concepts from Bruno Latour, John Law, Giles Deleuze and Felix Guattari, Nigel Thrift, Donna Haraway and Patrick Joyce. It is an exploration of how the technologies and objects of sanitation perform the city, and how such things which are normally hidden and obscured, are made visible. The question of visibility is also turned toward the research itself: how does one observe, and describe? How are sociological visibilities constructed? Through the research, the encountering of objects in the field, the processes of method, the pedagogy of concepts, and the construction of risk, the thesis comes to be understood as a particular kind of social scientific artefact which assembles four different accounts: the first regards the construction of visibility; the second explores Christchurch city from the control room where the urban sanitary infrastructures are monitored; the third chapter looks at the formatted and embodied practices which emerge with the correlation of the city and sanitation; the fourth looks at the changing politics of a city grappling with severely damaged essential services, land and structures. The final chapter considers how the differences between romantic and baroque sensibilities mean that these four accounts elicit knowing not through smoothness or uniformity, but in partiality and non-coherence. This thesis is about pipes, pump stations, and treatment plants; about the effluent of a city; about the messiness of social science when confronted by the equally messy world of wastewater.
Shows rain falling over two gondolas of people floating past flooded Christchurch damaged houses. One person points to people in balaclavas climbing over the houses and calls out 'And look...the wildlife's returning!'. Context: Heavy rain and flooding hit Christchurch suburbs, including earthquake damaged homes (Newstalk website 14 August 2012). At the same time, wildlife (possums and rare birds) are moving into abandoned suburbs (Stuff 13 August 2012) Quantity: 1 digital cartoon(s).
Shows Bishop Victoria Matthews reading a brochure offering cheap deals for cathedrals and their various accoutrements. Context: refers to the debate about the fate of the Christchurch Cathedral. Bishop Victoria Matthews is in favour of demolishing the cathedral to a certain safe level. The lobby for saving the cathedral, wrecked by the earthquakes of 2010 and 2011, is very strong. Quantity: 1 digital cartoon(s).
Website of the St Albans Residents Association Incorporated (SARA), dedicated to the recovery of St Albans and its city, Christchurch after the 2010 and 2011 earthquakes.
On the second anniversary of the 2010 earthquake Canterbury weeps. Quantity: 1 digital cartoon(s).
The cartoon shows a man, a woman and a dog all yelling with fright. Refers to the series of severe aftershocks that again rocked Christchurch on January 2nd. The largest was a magnitude-5.5 shake shortly before 6am. All were centred at sea off New Brighton. Mayor Bob Parker said that fear that larger quakes could be triggered had been raised by residents, but the tsunami threat was "highly unlikely". Quantity: 1 digital cartoon(s).
A man labeled `rate payers' lifts an elephant labeled `convention centre' high over his head. Refers to recent calls for tenders from groups to build a new convention centre in Christchurch. Quantity: 1 digital cartoon(s).
A contractor with a roller stands in an enormous hole, and shouts up to a family standing at the top that it's now ready to be built on. Refers to efforts to compact soil in Christchurch to prevent further liquefaction following the Canterbury earthquakes. Quantity: 1 digital cartoon(s).
Shows a doctor trying to test the heart of New Zealand who sits on a chair shaking uncontrolably. The doctor thinks it must be substance abuse or alcoholism. Context: refers to the Christchurch earthquakes and earthquakes elsewhere in New Zealand. Quantity: 1 digital cartoon(s).
Shows a dragon labelled Alpine Fault asleep beneath mountains while mountaineers traverse the range. Context: scientific study shows South Island alpine fault could be 200 years away from generating its next earthquake of magnitude 8.0 (Stuff 3 April 2012) Quantity: 1 digital cartoon(s).
Shows huge mosquitoes attacking a man. Context: It could be that there is a larger population of mosquitoes in Christchurch at the moment because of stagnant areas left by the earthquakes. And it could be that a new mosquito species may be causing Cantabrians to suffer bad reactions to bites. The species is known as the striped mosquito, or Aedes notscriptus. Quantity: 1 digital cartoon(s).
Prime Minister John Key tells the Minister for Earthquake recovery, Gerry Brownlee, to 'fill it in before it climbs back out!' Gerry Brownlee is sweeping rubble into a deep pit. The rubble represents many of the problems that New Zealand faces like Pike River, earthquakes, the Rena, child abuse, Winston Peters, gas pipeline damage and so on. Quantity: 1 digital cartoon(s).
Scientists stand before a model that will predict earthquakes. The model is a large arm attached to wires and switches with a thumb that flicks coins '"Heads" we have big quake at five-o-clock... "tails" we don't'. Context: short term predictions (hours to days) are in general unlikely to be possible, at present. Relates to the Christchurch earthquakes which experts have said could go on for years. Quantity: 1 digital cartoon(s).
During the Christchurch earthquake of February 2011, several midrise buildings of Reinforced Concrete Masonry (RCM) construction achieved performance levels in the range of life safety to near collapse levels. These buildings were subjected to seismic demands higher than the building code requirements of the time and higher than the current New Zealand Loadings Standard (NZS-1170.5:2004). Structural damage to these buildings has been documented and is currently being studied to establish lessons to be learned from their performance and how to incorporate these lessons into future RCM design and construction practices. This paper presents a case study of a six story RCM building deemed to have reached the near collapse performance level. The RCM walls on the 2nd floor failed due to toe crushing reducing the building’s lateral resistance in the east-west direction. A nonlinear dynamic analysis on a 3D model was conducted to simulate the development of the governing failure mechanism. Preliminary analysis results show that the damaged walls were initially under large compression forces from gravity loads which caused increase in their lateral strength and reduced their ductility. After toe crushing failure developed, axial instability of the model was prevented by a redistribution of gravity loads.
Under the caption, young people carrying their baggage flutter into the air, away from Canterbury and toward 'Oz'. In September GNS Earth Sciences reported that after the earthquakes, the Greendale and associated faults were still moving as they settled into a new configuration. At the same time the young were leaving Canterbury (and New Zealand) for a better future in Australia. The population of New Zealand was moving into a new configuration. Quantity: 1 digital cartoon(s).
Shows a shamrock superimposed on the city of Christchurch. It represents the green zone. Context: Probably refers to the zoning review process for those insured residential property owners who wish to query their land zoning. Zoning of flat land in greater Christchurch began in June last year and was completed last month. Over that period 7253 properties were zoned red as unsuitable for residential occupation due to significant earthquake damage; while a further 180,000 properties were zoned green as suitable for residential occupation, some with conditions. (rebuildchristchurch, 15 June 2012) Quantity: 1 digital cartoon(s).
The top frame shows the barbed wire and watch tower of a prison. There is a comment about someone wanting the warmth of a prison cell. The second frame shows prison staff chatting at cross purposes about a petition from Christchurch with homes wrecked by earthquake pleading to be allowed to live in prison and the sentence imposed on the Bridgecorp directors who have been accused of defrauding investors. Colour and black and white versions available Quantity: 2 digital cartoon(s).
A plane flies into the distance. Attached to it by a rope is a large package containing Christchurch Mayor Bob Parker and CEO of the City Council Tony Marryatt. The package is addressed 'Deepest Siberia c/- isolated hellhole Russia'. The mayor looks on the bright side considering this to be a junket the people will approve of. Context: Public disapproval of the Mayor's two-week tour of Asian countries with a Christchurch International Airport-led delegation. The airport is paying for the mayoral couple to take part in the trip. There is public criticism that the trip take place at this time because of ongoing problems with the council and earthquake recovery. There is also criticism of Tony Marryatt's $68,000 pay increase considered poor form when so many people are struggling with earthquake related problems. Quantity: 1 digital cartoon(s).
Following the 22 February 2011, MW 6.2 earthquake located on a fault beneath the Port Hills of Christchurch, fissuring of up to several hundred metres in length was observed in the loess and loess-colluvium of foot-slope positions in north-facing valleys of the Port Hills. The fissuring was observed in all major valleys, occurred at similar low altitudes, showing a contour-parallel orientation and often accompanied by both lateral compression/extension features and spring formation in the valley floor below. Fissuring locations studied in depth included Bowenvale Valley, Hillsborough Valley, Huntlywood Terrace–Lucas Lane, Bridle Path Road, and Maffeys Road–La Costa Lane. Investigations into loess soil, its properties and mannerisms, as well as international examples of its failure were undertaken, including study of the Loess Plateau of China, the Teton Dam, and palaeo-fissuring on Banks Peninsula. These investigations lead to the conclusion that loess has the propensity to fail, often due to the infiltration of water, the presence of which can lead to its instantaneous disaggregation. Literature study and laboratory analysis of Port Hills loess concluded that is has the ability to be stable in steep, sub-vertical escarpments, and often has a sub-vertically jointed internal structure and has a peak shear strength when dry. Values for cohesion, c (kPa) and the internal friction angle, ϕ (degrees) of Port Hills loess were established. The c values for the 40 Rapaki Road, 3 Glenview Terrace loess samples were 13.4 kPa and 19.7 kPa, respectively. The corresponding ϕ values were thought unusually high, at 42.0° and 43.4°.The analysed loess behaved very plastically, with little or no peak strength visible in the plots as the test went almost directly to residual strength. A geophysics resistivity survey showed an area of low resistivity which likely corresponds to a zone of saturated clayey loess/loess colluvium, indicating a high water table in the area. This is consistent with the appearances of local springs which are located towards the northern end of each distinct section of fissure trace and chemical analysis shows that they are sourced from the Port Hills volcanics. Port Hills fissuring may be sub-divided into three categories, Category A, Category B, and Category C, each characterised by distinctive features of the fissures. Category A includes fissures which display evidence of, spring formation, tunnel-gullying, and lateral spreading-like behaviour or quasi-toppling. These fissures are several metres down-slope of the loess-bedrock interface, and are in valleys containing a loess-colluvium fill. Category B fissures are in wider valleys than those in Category A, and the valleys contain estuarine silty sediments which liquefied during the earthquake. Category C fissures occurred at higher elevations than the fissures in the preceding categories, being almost coincident with bedrock outcropping. It is believed that the mechanism responsible for causing the fissuring is a complex combination of three mechanisms: the trampoline effect, bedrock fracturing, and lateral spreading. These three mechanisms can be applied in varying degrees to each of the fissuring sites in categories A, B, and C, in order to provide explanation for the observations made at each. Toppling failure can describe the soil movement as a consequence of the a three causative mechanisms, and provides insight into the movement of the loess. Intra-loess water coursing and tunnel gullying is thought to have encouraged and exacerbated the fissuring, while not being the driving force per se. Incipient landsliding is considered to be the least likely of the possible fissuring interpretations.
The earthquake sequence has resulted in significant physical and reputational damage to the Canterbury tourism industry. Eighteen months after the earthquakes inbound tourism data is still below pre-earthquake levels, with Canterbury operators reporting that the industry has not bounced back to where it was before September 2010. Outcomes of the earthquakes on business performance highlight there were winners and losers in the aftermath. Recovery of inbound tourism markets is closely tied to the timeframe to rebuild the CBD of Christchurch. Reinstating critical tourism infrastructure will drive future tourism investment, and allow tourism businesses to regenerate and thrive into the future. A blueprint for rebuilding the CBD of Christchurch was released by the Christchurch City Council in July 2012, and has been well received by tourism stakeholders in the region. The challenge now is for city officials to fund the development projects outlined in the blueprint, and to rebuild the CBD as quickly as possible in order to help regenerate the tourism industry in Christchurch, Canterbury and the rest of the South Island
The devastating magnitude M6.3 earthquake, that struck the city of Christchurch at 12:51pm on Tuesday 22 February 2011, caused widespread damage to the lifeline systems. Following the event, the Natural Hazard Research Platform (NHRP) of New Zealand funded a short-term project “Recovery of Lifelines” aiming to: 1) coordinate the provision of information to meet lifeline short-term needs; and to 2) facilitate the accessibility to lifelines of best practice engineering details, along with hazards and vulnerability information already available from the local and international scientific community. This paper aims to briefly summarise the management of the recovery process for the most affected lifelines systems, including the electric system, the road, gas, and the water and wastewater networks. Further than this, the paper intends to discuss successes and issues encountered by the “Recovery of Lifelines” NHRP project in supporting lifelines utilities.
I want to talk a bit about a media project that I started work on over the summer, which is part of a larger project the Faculty of Law at Canterbury is carrying out, investigating the many legal issues that have arisen from the earthquakes.
The Mw 7.1 Darfield earthquake generated a ~30 km long surface rupture on the Greendale Fault and significant surface deformation related to related blind faults on a previously unrecognized fault system beneath the Canterbury Plains. This earthquake provided the opportunity for research into the patterns and mechanisms of co-seismic and post-seismic crustal deformation. In this thesis I use multiple across-fault EDM surveys, logic trees, surface investigations and deformation feature mapping, seismic reflection surveying, and survey mark (cadastral) re-occupation using GPS to quantify surface displacements at a variety of temporal and spatial scales. My field mapping investigations identified shaking and crustal displacement-induced surface deformation features south and southwest of Christchurch and in the vicinity of the projected surface traces of the Hororata Blind and Charing Cross Faults. The data are consistent with the high peak ground accelerations and broad surface warping due to underlying reverse faulting on the Hororata Blind Fault and Charing Cross Fault. I measured varying amounts of post-seismic displacement at four of five locations that crossed the Greendale Fault. None of the data showed evidence for localized dextral creep on the Greendale Fault surface trace, consistent with other studies showing only minimal regional post-seismic deformation. Instead, the post-seismic deformation field suggests an apparent westward translation of northern parts of the across-fault surveys relative to the southern parts of the surveys that I attribute to post-mainshock creep on blind thrusts and/or other unidentified structures. The seismic surveys identified a deformation zone in the gravels that we attribute to the Hororata Blind Fault but the Charing Cross fault was not able to be identified on the survey. Cadastral re-surveys indicate a deformation field consistent with previously published geodetic data. We use this deformation with regional strain rates to estimate earthquake recurrence intervals of ~7000 to > 14,000 yrs on the Hororata Blind and Charing Cross Faults.
This paper provides an overview of the salient aspects of the dense array of ground motions observed in the 4 September 2010 Darfield and 22 February 2011 Christchurch earthquakes. Particular attention is given to inferred physical reasons for the observed ground motions, which include: (i) source features such as forward directivity effects; (ii) The effects of the Canterbury Plains sedimentary basin on basin-generated surface waves, and waveguide effects through the region; and (iii) the importance of local site response as evidenced by observations of large long period amplification and liquefaction. The significance of vertical ground motion intensity is also examined.