
A document containing examples of newsletters printed and distributed to the inner city businesses and residents, to prepare them for the upcoming SCIRT rebuild work and update them on the positive progress being made.
A document containing examples of items and activities SCIRT implemented as part of the programme to support businesses affected and disrupted by SCIRT central city rebuild work.
A document describing Downer's planned approach for neutralising the high pH of any potential bentonite or grout discharge into the Avon river.
A paper for the SCIRT Board which requests that the Board provide support to recruit a Project Manager to support the development of a civil trade qualification.
Summary of an independent review of the TOC process.
A conference paper prepared for the 4th Australasian Engineering Heritage Conference which outlines the challenges faced by SCIRT when repairing the Armagh Bridge, Colombo Bridge and Antigua Bridge.
A pdf copy of a PowerPoint presentation used by Duncan Gibb when presenting his Brunel lecture.
A document which details Downer's approach to heritage management when repairing the Armagh Street bridge.
A document describing the use of 3D modelling for construction methodology.
Posters created for Beca Heritage Week 2014, outlining SCIRT's repair work on the Armagh Street and Colombo Street bridges in the Central City. They were hung on the bridges for members of the public to read during SCIRT's walk and talk tours.
An example of a tool SCIRT has used to communicate its projects to a community.
A document containing examples of items provided in a folder for businesses. These are taken to the initial face-to-face meeting with business owners to discuss the impact and disruption of upcoming SCIRT rebuild works.
A report which details the financial and societal value that the SCIRT Training Centre created.
An entry from Jennifer Middendorf's blog for 29 August 2014 entitled, "Day off".
Christchurch people who have had to battle insurance companies over the repair or rebuild of earthquake damaged homes are welcoming the Labour party's idea of an earthquake court to settle disputes.
Documents obtained by Radio New Zealand show WorkSafe New Zealand was still grappling to get on top of asbestos dangers in the Christchurch rebuild nearly two years after the February 2011 earthquake.
Christchurch and its surrounding towns are slowly starting to be rebuilt after the devastating earthquakes of 2010 and 2011. Our political editor Brent Edwards has been in Christchurch to find out whether the rebuild debate will dominate the election campaign in the city.
As a cemetary near her home is cordoned off, fears for Blessie Gotingco intensify. In Christchurch, there's questions over asbestos and potential danger in the earthquake rebuild and a sub zero wake up for the south, as temperatures plummet.
Christchurch's historic Theatre Royal will reopen for business in November, with bookings about to open for the first show, the Royal New Zealand Ballet season of "A Christmas Carol" The 106-year old theatre has been closed for almost four years because of earthquake damage in the 2010 and 2011 earthquakes. The $40million rebuild and restoration project will be completed over the next five months and on 17 November 2014, the 'Grand Old Lady' of New Zealand theatre will reopen her doors for performances. With so few venues for performance left in the city, including the Town Hall out of commission indefinitely, the rebuild of the Theatre Royal is very good news for Christchurch audiences Chief executive Neil Cox explains the process of getting oldest Edwardian theatre in the country back in use and mounting the large scale theatrical productions it has been famous for.
Following the devastation of the Canterbury earthquake sequence a unique opportunity exists to rebuild and restructure the city of Christchurch, ensuring that its infrastructure is constructed better than before and is innovative. By installing an integrated grid of modern sensor technologies into concrete structures during the rebuild of the Christchurch CBD, the aim is to develop a network of self-monitored ‘digital buildings’. A diverse range of data will be recorded, potentially including parameters such as concrete stresses, strains, thermal deformations, acoustics and the monitoring of corrosion of reinforcement bars. This procedure will allow an on-going complete assessment of the structure’s performance and service life, both before and after seismic activity. The data generated from the embedded and surface mounted sensors will be analysed to allow an innovative and real-time health monitoring solution where structural integrity is continuously known. This indication of building performance will allow the structure to alert owners, engineers and asset managers of developing problems prior to failure thresholds being reached. A range of potential sensor technologies for monitoring the performance of existing and newly constructed concrete buildings is discussed. A description of monitoring work conducted on existing buildings during the July 2013 Cook Strait earthquake sequence is included, along with details of current work that investigates the performance of sensing technologies for detecting crack formation in concrete specimens. The potential market for managing the real-time health of installed infrastructure is huge. Civil structures all over the world require regular visual inspections in order to determine their structural integrity. The information recorded during the Christchurch rebuild will generate crucial data sets that will be beneficial in understanding the behaviour of concrete over the complete life cycle of the structure, from construction through to operation and building repairs until the time of failure. VoR - Version of Record
A video of an address by Lianne Dalziel, Mayor of Christchurch, at the 2014 Seismics and the City forum. This talk was part of the Breakfast Presentations section, the theme of which was Building Momentum.
A video of an address by David Ayers, Mayor of Waimakariri District, at the 2014 Seismics and the City forum. This talk was part of the Breakfast Presentations section, the theme of which was Building Momentum.
A video of an address by Ian Simpson, CEO of the NZ Earthquake Commission, at the 2014 Seismics and the City forum. This talk was part of the Breakfast Presentations section, the theme of which was Building Momentum.
A video of an address by Roger Sutton, CEO of Canterbury Earthquake Recovery Authority, at the 2014 Seismics and the City forum. This talk was part of the Breakfast Presentations section, the theme of which was Building Momentum.
A video of an address by Joanna Norris, Editor of The Press, at the 2014 Seismics and the City forum. This talk was part of the Breakfast Presentations section, the theme of which was Building Momentum.
Mr Wayne Tobeck, Director of Southrim Group (SRG), sponsored this 2013 MEM Project titled; A Technical and Economic Feasibility Study for the Integration of GSHP Technology in the Christchurch Rebuild. Following the recent Christchurch earthquakes, a significant amount of land has become too unstable to support traditional building foundations. This creates an opportunity to implement new and unique foundation designs previously unconsidered due to high costs compared to traditional methods. One such design proposes that an Injection Micro-Piling technique could be used. This can also be coupled with HVAC technology to create a Ground Source Heat Pump (GSHP) arrangement in both new buildings and as retrofits for building requiring foundation repair. The purpose of this study was to complete a feasibility study on the merits of SRG pursuing this proposed product. A significant market for such a product was found to exist, while the product was also found to be technically and legally feasible. However, the proposed product was found to not be economically feasible with respect to Air Source Heat Pumps due to the significantly higher capital and installation costs required. Further analysis suggests GSHPs may become more economically attractive in operating temperatures lower than -9oC, though the existence of markets with this climate in NZ has not been studied. It is therefore suggested that SRG do not proceed with plans to develop a GSHP coupled foundation solution for the Christchurch rebuild.
A video of an address by Peter Townsend, CEO of the Canterbury Employers' Chamber of Commerce, at the 2014 Seismics and the City forum. This talk was part of the Breakfast Presentations section, the theme of which was Building Momentum.
A crane topples over on Victoria Street while taking glass up to some windows. No one was hurt and the glass never broke. Victoria Street was closed from 7:30am to later in the evening. This all happen on the Knox Plaza building site. Christchurch October 13, 2014 New Zealand.
Topics - it's been described as the 'Downton Effect' - a revival of more formal dinner parties as the British try to bring back fine dining. Today we learned that insurance companies have completed just 15 per cent of rebuilds and 10 per cent of over-cap repairs more than three years after the Canterbury earthquakes. A series of rallies are being held in five Australian cities today by New Zealanders protesting against legislation which denies them rights to welfare. Commuters are cautiously optimistic about a radical revamp proposed for Wellington's rush-hour rail service.
The Christchurch earthquakes brought to an abrupt halt a process of adaptive reuse and gentrification that was underway in the south eastern corner of the central business district. The retail uses that were a key to the success of this area pre-earthquake could be characterised as small, owner operated, quirky, bohemian, chaotic and relatively low rent. This research reports on the progress of a long term, comprehensive case study that follows the progress of these retailers both before and after the earthquakes. Findings include the immediate post-earthquake intentions to resume business in the same location as soon as possible were thwarted by government imposed cordons of the CBD that were only lifted nearly three years later. But, businesses were resilient and generally reinvented themselves quickly in alternative suburban locations where government “rebuild” restrictions were absent. It remains to be seen if this type of retail will ever return to the CBD as government imposed plans and the rents demanded for retail space in new buildings appear to preclude small owner-operated businesses.