          A plan which defines the framework for performance measurement to align SCIRT with the objectives from the Alliance Agreement objectives. The first version of this plan was produced on 20 August 2011.
A plan which describes how SCIRT will manage the coordination of utility authority liaison and utility relocation or protection during the design and construction phases of the rebuild schedule. The first version of this plan was produced on 15 November 2011.
A plan which identifies items that will define value for the programme of work and explain processes that will measure the achievement of value outcomes. The first version of this plan was produced on 6 September 2011.
A plan which details how SCIRT managed its construction work and ensured a consistent best-practice approach across the approximately 700 projects in the rebuild programme.
A plan which describes how SCIRT will carry out design work. The first version of this plan was produced on 1 September 2011.
A plan which defines the risk and opportunity management activities to be applied by SCIRT to meet SCIRT objectives. The first version of this plan was produced on 12 September 2011.
A plan which describes SCIRT's approach to schedule management. The first version of this plan was produced on 20 September 2011.
A report reviewing pipe installation specifications and recommending alternatives that could improve standard specifications.
A guideline to inform designers on the design of an Automated Flushing Siphon System as a means to reduce the frequency of blockages on the wastewater network caused by pipe dips and flat grades.
A document containing the research questions asked by Opinions Market Research Ltd when carrying out face-to-face surveys about SCIRT work.
A document which outlines the communication strategy behind the Lonely Cone campaign.
A poster which was prepared to go with the award application for the Canterbury Heritage Awards 2016.
A document containing the research questions asked by Opinions Market Research Ltd when carrying out telephone surveys about SCIRT work.
A media release which outlines the outcomes of the campaign to reclaim Christchurch cones.
A copy of the award application for the Canterbury Heritage Awards 2016.
A document which outlines the purpose and processes associated with ECI at SCIRT.
A document which describes SCIRT's Geographic Information System (GIS) Viewer.
A presentation which was given as part of the FME Desktop World Tour in 2015 in Christchurch.
A presentation prepared for the 2016 New Zealand Spatial Excellence Awards: Category: Award for Technical Excellence.
A plan which outlines the processes and IT applications and services required to manage the SCIRT programme. The first version of this plan was produced on 9 August 2011.
A plan which outlines how SCIRT is to carry out condition investigations and analysis. The first version of this plan was produced on 1 September 2011.
A plan which describes how SCIRT would manage the risks associated with rebuilding horizontal infrastructure within Christchurch's central city area. The first version of this plan was produced on 24 October 2013.
A plan which outlined the scope, approach and key deliverables for communications and stakeholder engagement for SCIRT.
A plan which documents the process SCIRT will follow to identify and pass on learnings from its programme of work. The first version of this plan was produced on 21 June 2016.
A plan which provides SCIRT with a map for building and sustaining outstanding performance. The first version of this plan was produced on 18 February 2013.
A plan which documents how SCIRT is to efficiently and effectively ramp down the delivery of its work, demobilise facilities and resources and wind up the organisation.
A document which sets out the terms of reference for SCIRT's Safety Leadership Group.
A PowerPoint presentation which evaluates and analyses the effectiveness of The Lonely Cone Recall campaign.
An award submission nominating SCIRT for the 2016 New Zealand Spatial Excellence Awards: Category: Award for Technical Excellence.
A plan which outlines the function, roles and responsibilities of SCIRT during an emergency event affecting SCIRT construction works. The first version of this plan was produced on 30 April 2012. Note that personal details of key personnel have been removed from this document.