found 150 results

Images, UC QuakeStudies

A photograph of the crowd at the launch of the Green Room on Colombo Street.Crack'd for Christchurch comments, "Before the speeches. The Green Room is on Colombo Street in the centre of the rebuild, with vacant lots surrounding it. We wanted it to be an oasis of calm and hope for Christchurch people. It is only a temporary site."

Images, eqnz.chch.2010

Victoria Apartments demolition is under way on a walk around the city to find out what is happening in the city. Feb 17, 2014 Christchurch New Zealand. "soft-stripped", which means that any remaining belongings will be removed, as well as furnishings and internal walls.

Images, eqnz.chch.2010

After my visit at the hospital for physiotherapy on my hand I took a walk around the city on my way home. Demolition of the Victoria Square apartments February 12, 2014 Christchurch New Zealand. www.s...

Images, eqnz.chch.2010

Demolition of the old Millers building is just about complemented. On my walk around the city in the rain.. thought it may have stopped.. but didn't so I just kept walking! June 12, 2014 Christchurch New Zealand.

Images, eqnz.chch.2010

20140522_8951_EOS M-22 Demolition Of what many in Christchurch know as the Millers building, but for many recent years was the home to the Christchurch City Council, till just a week or two before the first earthquake of 2010. Now, in mid-2014 it is finally being demolished after nearly 45 months empty. A bus is leaving the new (temporary) bu...

Research papers, The University of Auckland Library

Between September 4, 2010 and December 23, 2011, a series of earthquakes struck the South Island of New Zealand including the city of Christchurch producing heavy damage. During the strongest shaking, the unreinforced masonry (URM) building stock in Christchurch was subjected to seismic loading equal to approximately 150-200% of code values. Post-earthquake reconnaissance suggested numerous failures of adhesive anchors used for retrofit connection of roof and floor diaphragms to masonry walls. A team of researchers from the Universities of Auckland (NZ) and Minnesota (USA) conducted a field investigation on the performance of new adhesive anchors installed in existing masonry walls. Variables included adhesive type, anchor diameter, embedment length, anchor inclination, and masonry quality. Buildings were selected that had been slated for demolition but which featured exterior walls that had not been damaged. A summary of the deformation response measured during the field tests are presented. AM - Accepted Manuscript

Articles, UC QuakeStudies

A document outlining the methodology for rebuilding horizontal infrastructure in the central city, covering wastewater (local reticulation and trunk), wastewater pump stations, storm water (local reticulation and trunk), potable water, roads, and bridges.