A photograph captioned by Paul Corliss, "Cardboard Cathedral construction, corner Madras and Cashel Streets".
A photograph captioned by Paul Corliss, "Cardboard Cathedral construction, corner Madras and Cashel Streets".
A photograph captioned by Paul Corliss, "Cardboard Cathedral construction, corner Madras and Cashel Streets".
A photograph captioned by Paul Corliss, "Cardboard Cathedral construction, corner Madras and Cashel Streets".
A photograph captioned by Paul Corliss, "Cardboard Cathedral construction, corner Madras and Cashel Streets".
A photograph captioned by Paul Corliss, "Cardboard Cathedral construction, corner Madras and Cashel Streets".
A photograph captioned by Paul Corliss, "Cardboard Cathedral construction, Madras Street and Hereford Street".
A photograph captioned by Paul Corliss, "Cardboard Cathedral construction, Madras Street and Hereford Street".
A photograph captioned by Paul Corliss, "Cardboard Cathedral construction, corner Madras and Cashel Streets".
A photograph of the stained-glass window of the Transitional Cathedral.
A photograph captioned by Paul Corliss, "Cardboard Cathedral construction, corner Madras and Cashel Streets".
A photograph captioned by Paul Corliss, "Cardboard Cathedral construction, Madras Street and Hereford Street".
20130403_2908_G12-25 Cardboard Cathedral The temporary (10 years?) and cheap ($4-6 million) Anglican Cathedral being built a few hundred meters away from the old stone structure that was the centre of Christchurch. Both buildings (the original and this) have caused a lot of controversy, many wanting the old stone one to be repaired (the church ...
As seen from Hereford St over the demolition of the corner buildings.
A temporary (5year) construction of giant cardboard tubes to be in use until the new or restored Christ Church Cathedral is back in the Square
An aerial photograph looking west over Cathedral Square, with Christ Church Cathedral in the centre.
An aerial photograph looking north-east over Cathedral Square with Christ Church Cathedral in the centre.
An aerial photograph looking south over Cathedral Square with Christ Church Cathedral in the centre left.
A photograph captioned by Paul Corliss, "Cardboard Cathedral construction, corner Madras and Cashel Streets".
A photograph captioned by Paul Corliss, "Cardboard Cathedral construction, corner Madras and Cashel Streets".
A photograph captioned by Paul Corliss, "Cardboard Cathedral construction, corner Madras and Cashel Streets".
A photograph captioned by Paul Corliss, "Cardboard Cathedral construction, Madras Street and Hereford Street".
An aerial photograph looking east over Cathedral Square with Christ Church Cathedral in the centre.
An aerial photograph looking south-east over Cathedral Square with the damaged Christ Church Cathedral in the centre.
A photograph of the Transitional Cathedral under construction on the corner of Latimer Square and Hereford Street.
An aerial photograph looking west over Cathedral Square with the Christchurch Cathedral in the centre.
A PDF copy of pages 88-89 of the book Christchurch: The Transitional City Pt IV. The pages document the transitional project 'Christchurch Transitional Cathedral'. Photos with permission: The Anglican Church
The temporary Transitional Cathedral, also known as the Cardboard Cathedral, under construction in Latimer Square.
A video of a public forum being held to discuss the Anglican Church's three options for the restoration of the ChristChurch Cathedral. The three options are restoring the original cathedral, reinterpreting the original cathedral in modern materials, or building a contemporary cathedral. The video includes footage of speeches by Bishop Victoria Matthews and RCP project manager Marcus Read. It also includes footage of Matthews, Read, and Warren and Mahoney architect Bill Gregory answering questions from the public.
A digital copy of a painting by Julia Holden. The painting is of shipping containers along the right side of the ChristChurch Cathedral.