A photograph of a market in Cathedral Square. The market is part of Canterbury Tales - the main event of FESTA 2013.
A photograph of a market in Cathedral Square. The market is part of Canterbury Tales - the main event of FESTA 2013.
The Press Building in Cathedral Square missing the wrought iron at the top of the tower. It was removed after the 4 September earthquake for safety reasons.
A photograph of the dome of the Regent Theatre building. The dome has been removed from the building and is sitting on the ground in Cathedral Square.
Photograph captioned by BeckerFraserPhotos, "The stained glass windows on the north side appear to be intact. ChristChurch Cathedral".
A digital copy of a pen and ink and watercolour painting by Raymond Morris, titled, 'Sevicke Jones Building, 53 Cathedral Square, 1913-2011'.
Photograph captioned by BeckerFraserPhotos, "The Cathedral of the Blessed Sacrament on Barbadoes Street".
A photograph of a market in Cathedral Square. The market is part of Canterbury Tales - the main event of FESTA 2013.
A photograph of customers in a cafe in the Re:Start Mall. The photograph is captioned by BeckerFraserPhotos, "The Cashel Mall to Cathedral Square walkway".
A photograph captioned by BeckerFraserPhotos, "Detail of the roof of ChristChurch Cathedral. Taken from up high in the BNZ Building".
A photograph of people at the site of the CTV building. The photograph is captioned by Paul Corliss, "Second anniversary 22 February earthquake".
A photograph of components of a model of the ChristChurch Cathedral being built from LEGO by Sam Butcher. Sam comments "Fixing a large variety of bits that were wrong/annoying/cheating (not purist) about the last model. The new one is set AFTER the Feb 22 earthquake. This newer, and much stronger model is also completely modular for easier transport. Obviously still a WIP, I'm currently waiting for a pretty large bricklink order at the moment, and will probably need to place a couple more after that too. Back on the new technical design for the Cathedral Rose Window".
A photograph of components of a model of the ChristChurch Cathedral being built from LEGO by Sam Butcher. Sam comments "Fixing a large variety of bits that were wrong/annoying/cheating (not purist) about the last model. The new one is set AFTER the Feb 22 earthquake. This newer, and much stronger model is also completely modular for easier transport. Obviously still a WIP, I'm currently waiting for a pretty large bricklink order at the moment, and will probably need to place a couple more after that too. Front on the new technical design for the Cathedral Rose Window".
A photograph of components of a model of the ChristChurch Cathedral being built from LEGO by Sam Butcher. Sam comments "Fixing a large variety of bits that were wrong/annoying/cheating (not purist) about the last model. The new one is set AFTER the Feb 22 earthquake. This newer, and much stronger model is also completely modular for easier transport. Obviously still a WIP, I'm currently waiting for a pretty large bricklink order at the moment, and will probably need to place a couple more after that too. Side of the new technical design for the Cathedral Rose Window".
A crane parked on Gloucester Street, outside Cathedral Junction.
A photograph showing the Millennium Hotel in Cathedral Square.
A photograph of a souvenir store in Cathedral Square.
A photograph of Cathedral Square, seen from Worcester Street.
The temporary "Cardboard Cathedral" being constructed on Madras Street.
Stones fallen from the Cathedral of the Blessed Sacrament.
The temporary "Cardboard Cathedral" being constructed on Madras Street.
An aerial photograph of Hereford Street near Cathedral Square.
View of Cathedral Square, taken from the Warners Novotel.
A photograph captioned by BeckerFraserPhotos, "The Chalice, Millennium Hotel (staying), BNZ Building (going) and ANZ building, in Cathedral Square".
Photograph captioned by BeckerFraserPhotos, "The Government Life building in Cathedral Square. This will be a dirty demolish (nothing salvaged as the building has extensive use of asbestos)".
Photograph captioned by BeckerFraserPhotos, "Cranes working on the Clarendon Tower and the Grant Thornton building, viewed from Cathedral Square".
Photograph captioned by BeckerFraserPhotos, "Looks as if they are building a platform for the high reach to work on the Grant Thornton building. Cathedral Square".
An aerial view of Christchurch a week after the 22 February 2011 earthquake. Christ Church Cathedral can be seen.
A vehicle that was smashed by fallen masonry from the Cathedral of the Blessed Sacrament. In the background, the broken building can be seen.
Photograph captioned by BeckerFraserPhotos, "The Old Post Office in Cathedral Square with the Telecom exchange building behind, and Clarendon Tower under demolition".