
An aerial photograph of the earthquake damage to the Canterbury Provincial Chambers Building on Durham Street.
A photograph of the earthquake damage to the Austral Building on Colombo Street. Scaffolding has been placed up the side.
A graphic showing damage to the Canterbury Provincial Council Buildings.
An aerial photograph of masonry from the earthquake damaged Canterbury Provincial Chambers Building on Durham Street.
An aerial photograph of masonry from the earthquake damaged Canterbury Provincial Chambers Building on Durham Street.
An aerial photograph of the earthquake damage to the Canterbury Provincial Chambers Building on Durham Street.
An aerial photograph of the earthquake damage to the Canterbury Provincial Chambers Building on Durham Street.
An aerial photograph of the earthquake damage to the Canterbury Provincial Chambers Buildings on Durham Street.
An aerial photograph of the earthquake damage to the Canterbury Provincial Chambers Building on Durham Street.
An aerial photograph of the earthquake damage to the Canterbury Provincial Chambers Buildings on Durham Street.
An aerial photograph of the earthquake damage to the Canterbury Provincial Chambers Buildings on Durham Street.
An aerial photograph of masonry from the earthquake damaged Canterbury Provincial Chambers Building on Durham Street.
An aerial photograph of the earthquake damage to the Canterbury Provincial Chambers Buildings on Durham Street.
An aerial photograph of the earthquake damage to the Canterbury Provincial Chambers Building on Durham Street.
An aerial photograph of the earthquake damage to the Canterbury Provincial Chambers Buildings on Durham Street.
The walkway from Cathedral Square, looking down Colombo Street towards The Crossing bus exchange building on the left, and the Ballantynes building on the right.
The country's building regulator admits it needs a major overhaul after years scrambling just to react to leaky homes and the Canterbury and Kaikōura earthquakes.
The magnificent, four storey Strange’s & Co Furniture Department Building was built in 1900 on the corner of Lichfield and High Streets, replacing a row of old dilapidated weatherboard sh…
Following the devastation of the Canterbury earthquake sequence a unique opportunity exists to rebuild and restructure the city of Christchurch, ensuring that its infrastructure is constructed better than before and is innovative. By installing an integrated grid of modern sensor technologies into concrete structures during the rebuild of the Christchurch CBD, the aim is to develop a network of self-monitored ‘digital buildings’. A diverse range of data will be recorded, potentially including parameters such as concrete stresses, strains, thermal deformations, acoustics and the monitoring of corrosion of reinforcement bars. This procedure will allow an on-going complete assessment of the structure’s performance and service life, both before and after seismic activity. The data generated from the embedded and surface mounted sensors will be analysed to allow an innovative and real-time health monitoring solution where structural integrity is continuously known. This indication of building performance will allow the structure to alert owners, engineers and asset managers of developing problems prior to failure thresholds being reached. A range of potential sensor technologies for monitoring the performance of existing and newly constructed concrete buildings is discussed. A description of monitoring work conducted on existing buildings during the July 2013 Cook Strait earthquake sequence is included, along with details of current work that investigates the performance of sensing technologies for detecting crack formation in concrete specimens. The potential market for managing the real-time health of installed infrastructure is huge. Civil structures all over the world require regular visual inspections in order to determine their structural integrity. The information recorded during the Christchurch rebuild will generate crucial data sets that will be beneficial in understanding the behaviour of concrete over the complete life cycle of the structure, from construction through to operation and building repairs until the time of failure. VoR - Version of Record
A woman badly injured in the Christchurch earthquake is astonished a new building in the city has been found to have serious seismic flaws. The empty new office building at 230 High Street has multiple problems in its earthquake design that the city council was warned about almost two years ago. Construction of the seven-storey building continued even after those warnings in December 2017. Susie Ferguson speaks to University of Canterbury lecturer Ann Brower, who was crushed after falling masonry fell on her bus during the February twenty-second 2011 earthquake.
About two hundred of those who lost loved ones in collapsed buildings in Christchurch's 2011 earthquake, heard an apology from the city's mayor, Lianne Dalziel yesterday. A royal commission in to faulty buildings found serious errors by engineers and the Christchurch City Council 185 people died during the earthquake on the 22nd of February, 2011. David Selway who lost his sister Susan Selway in the CTV Building, said it was good to hear a heartfelt apology from the mayor for the role her council played in signing off the building as safe.
A video of the Christchurch central city recorded shortly after the 22 February 2011 earthquake. In the video, Press reporter Olivia Carville describes the experiences of people within the central city. There is also footage of a woman being rescued from the ChristChurch Cathedral, people trapped in the Press building, damaged buildings on Colombo Street and Manchester Street, people evacuating the Forsyth Barr building using a rope, and people gathering in Latimer Square.
A photograph showcasing the intricate wooden ceiling of the Cranmer Court building's octagonal corner section. Although designed to house a book depot, the room was used as the principal's office while Christchurch Normal School was operating from the building. This part of the building housed Plato Creative from March 2008 to November 2009.
A photograph showcasing the intricate wooden ceiling of the Cranmer Court building's octagonal corner section. Although designed to house a book depot, the room was used as the principal's office while Christchurch Normal School was operating from the building. This part of the building housed Plato Creative from March 2008 to November 2009.
A video of Stone Works removing a time capsule from the foundations of the old Press Building in Cathedral Square. The time capsule was found in the foundation stone of the building. It contained a bundle of newspapers from April 1907, handwritten notes, and coins.
The facade of the building housing the Daily Bagel and the Covent Fruit Centre has fallen away, leaving the building unstable and dangerous. The front wall has toppled onto the footpath leaving a pile of bricks. The front windows of this and surrounding buildings have been spray-painted with USAR codes 'No Go' and the times they were checked.
Page 2 of Section A of the Christchurch Press, published on Tuesday 26 June 2012.
Page 2 of Section C of the Christchurch Press, published on Saturday 30 June 2012.
As a result of the 4 September 2010 Darfield earthquake and the more damaging 22 February 2011 Christchurch earthquake, considerable damage occurred to a significant number of buildings in Christchurch. The damage that occurred to the Christchurch Roman Catholic Cathedral of the Blessed Sacrament (commonly known as the Christchurch Basilica) as a result of the Canterbury earthquakes is reported, and the observed failure modes are identified. A previous strengthening intervention is outlined and the estimated capacity of the building is discussed. This strengthening was completed in 2004, and addressed the worst aspects of the building's seismic vulnerability. Urgent work was undertaken post-earthquake to secure parts of the building in order to limit damage and prevent collapse of unstable parts of the building. The approach taken for this securing is outlined, and the performance of the building and the previously installed earthquake strengthening intervention is evaluated.A key consideration throughout the project was the interaction between the structural securing requirements that were driven by the requirement to limit damage and mitigate hazards, and the heritage considerations. Lessons learnt from the strengthening that was carried out, the securing work undertaken, and the approach taken in making the building "safe" are discussed. Some conclusions are drawn with respect to the effectiveness of strengthening similar building types, and the approach taken to secure the building under active seismic conditions. AM - Accepted Manuscript
Prime Minister John Key drives a tractor to which is attached a crane and a huge demolition ball in the shape of MP Gerry Brownlee's head; the ball smashes against a historic building bringing stone pediments down. Context - Gerry Brownlee, who is Earthquake Recovery Minister, has caused a stir by suggesting that if he had his way some of Christchurch's older buildings would be "down tomorrow". He also said the price of saving some historic buildings badly damaged in the February 22 earthquake was too high. People had died in the quake because of attempts to save historic buildings badly damaged in the September 4 quake. Brownlee said he had no regrets despite the stir his comments caused - but he was annoyed by suggestions the Cathedral and Riccarton House were among buildings he thought should be bowled. He believed those buildings should be saved, and they would be. "I'm not a philistine; I was chairman of the trust that actually saved Riccarton House from the bulldozers in 1990. "I understand conservation architecture very well and I do have an appreciation of heritage buildings." Original cartoon held at A-474-048 Quantity: 1 digital cartoon(s).