A document which explains the pre-approval process for specialist lining contractors working on the SCIRT horizontal repair programme.This document has had sections removed and redacted to protect contractors' commercial interests.For a current list of approved contractors authorised to carry out lining works on Christchurch City Council assets, contact the Council.
A pdf copy of a presentation which describes the stages of construction of the Beachville Road seawall.
A plan which defines the risk and opportunity management activities to be applied by SCIRT to meet SCIRT objectives. The first version of this plan was produced on 12 September 2011.
A plan which describes SCIRT's approach to schedule management. The first version of this plan was produced on 20 September 2011.
A document which describes the formation of SCIRT.
A pdf copy of a PowerPoint presentation which illustrates the locations where Duncan Gibb presented his Brunel lecture.
A report reviewing pipe installation specifications and recommending alternatives that could improve standard specifications.
A pdf copy of a cut-out dress-up game for young children involving safety gear.
A document which describes best practice for dewatering guidelines.
A guideline which provided clarity to designers, asset owners and others on the meaning of terminology to describe the type of roading works proposed/undertaken.
A guideline to inform designers on the design of an Automated Flushing Siphon System as a means to reduce the frequency of blockages on the wastewater network caused by pipe dips and flat grades.
A web story about the return of the stone lions to the Memorial Arch.
A presentation given to St Martin's primary school students about SCIRT work in Opawa and Hillsborough.
A copy of the plan developed in 2011 to facilitate a collaborative approach between all stakeholders and minimise the impact on the traffic network, because of the extensive repair works necessary to repair vertical and horizontal infrastructure.
A pdf copy of one of a series of presentations which Red Cross presented to SCIRT, telling them about what the community is undergoing and how Red Cross helps.
A document which discusses the importance of the Alliance Objectives to the operation of SCIRT.
A tool, in the form of a poster, given to workshop and toolbox participants and hung up at worksites and in offices, outlining five easy steps to minimise the impact of roadworks on businesses.
A document containing the research questions asked by Opinions Market Research Ltd when carrying out face-to-face surveys about SCIRT work.
A document which outlines the communication strategy behind the Lonely Cone campaign.
A tool, including an outline, resources and a survey sheet, used by SCIRT's Transport Planning Manager when delivering a series of toolboxes to SCIRT traffic staff about working around businesses.
A photograph taken in 2013, showing one of the 32 large 'Open for Business' signs placed on all of the main routes into the CBD.
A presentation prepared by one of the site engineers restoring the Memorial Arch and Bridge of Remembrance, outlining the damage to the structures, the repair designs and the construction methodologies.
A document describing the use of a remotely operated hydraulic jaw crusher to avoid the need to make confined space entries.
A presentation prepared by SCIRT's Downer Communciation Lead, providing an overview of the community engagement carried out by the Downer Team during the restoration of the Bridge and Arch.
A web story about a site visit to the Bridge and Arch by local school pupils.
A document describing the confined spaces "dummy run".
A document describing Downer's use of column seismic clamps to prevent additional damage to the Arch columns.
A document describing Downer's approach to containing bentonite when drilling micro piles for the new Arch foundations.
A web story about the model design work by Christ's College pupils.
A document which describes the process that SCIRT took to restore the Bridge of Remembrance and Memorial Arch.