Search

found 723 results

Images, UC QuakeStudies

A view down Colombo Street. A brick wall has been revealed due to the demolition of the adjoining building. A walkway from Gloucester Street to the Square was opened up for a few days to allow the public a closer look of the cathedral.

Images, UC QuakeStudies

The front of Christ Church Cathedral showing its broken tower. Bracing has been placed on the front wall to limit further damage. A walkway from Gloucester Street to the Square was opened up for a few days to allow the public a closer look.

Images, UC QuakeStudies

Looking into Cathedral Square from the corner of Cambridge Terrace and Worcester Boulevard. On the left is the damaged former Municipal Chambers, a historic Queen Anne building on the intersection of Worcester Boulevard and Oxford Terrace. On the right is the Clarendon Tower.

Images, UC QuakeStudies

The front side of the Cathedral the rose window removed and bracing supporting the wall. The broken tower can be seen to the left and fencing placed around the outside of the building. In the background, the Millennium Hotel can be seen.

Images, UC QuakeStudies

A view down High Street from the corner of Colombo and Hereford Streets. In the distance, the Holiday Inn City Centre is being demolished. Taken on a day when a walkway was opened up between Re:Start Mall and Cathedral Square to allow temporary public access.

Images, UC QuakeStudies

The Wizard of Christchurch talks to people viewing the damaged Christ Church Cathedral. Bracing has been placed against the front wall to limit further damage. A walkway from Gloucester Street to the Square was opened up for a few days to allow the public a closer look.

Images, UC QuakeStudies

Damage to the front of Christ Church Cathedral. The tower has been damaged and bracing has been placed on the front wall (right) to limit further damage. A walkway from Gloucester Street to the Square was opened up for a few days to allow the public a closer look.

Images, UC QuakeStudies

The damaged TimeZone games arcade on Colombo Street. The roof has collapsed, batts from the ceiling are piled in the window, and the door is boarded up. Taken on a day when a walkway was opened up between Re:Start Mall and Cathedral Square to allow temporary public access.

Images, UC QuakeStudies

The damaged TimeZone games arcade on Colombo Street. The roof has collapsed, batts from the ceiling are piled in the window, and the door is boarded up. Taken on a day when a walkway was opened up between Re:Start Mall and Cathedral Square to allow temporary public access.

Images, UC QuakeStudies

A montage of photographs of the creation of the installation 'Tonic'. The installation is part of the LUXCITY event. Tutors: Annabel Pretty, Cesar Wagner, Peter McPherson

Images, UC QuakeStudies

Damage to the Cathedral of the Blessed Sacrament. Looking through the fence on to the side and front where shipping containers are being used to support the walls. On the cordon are signs that say 'Danger. Demolition in Progress. No Entry', and 'Monitored construction alarms. Site secured. No Unauthorised entry'.

Images, UC QuakeStudies

A photograph of SPCA Field Officer Vanessa Hampton releasing a pigeon at SPCA Canterbury as a symbol of love, hope and renewal. The pigeon was named Barney Rubble due to the fact that it was found amongst the rubble and debris of the ChristChurch Cathedral.

Images, UC QuakeStudies

Members of the public view the damaged tower of Christ Church Cathedral. Bracing has been placed on the front wall to the right to limit further damage. In the centre of the crowd stands a wire cage filled with stones. After the earthquake, love notes to Christchurch were written on the stones.

Images, UC QuakeStudies

Looking across an empty site on the corner of Colombo and Hereford Streets where several buildings have been demolished, the Ibis Hotel and ANZ building are visible in the background. Taken on a day when a walkway was opened up between Re:Start Mall and Cathedral Square to allow temporary public access.

Videos, UC QuakeStudies

A video of Lianne Dalziel speaking to a public gathering about her reasons for standing for the mayoralty of Christchurch. Dalziel talks about starting her mayoralty where Share an Idea left off, making the Council a high performing team, and getting the community involved in the decisions about the future of the city. The video also includes footage of Dalziel taking a tour of the Christchurch central city. Dalziel visits the ChristChurch Cathedral, pointing out a sign which reads, "The earthquakes stopped us, but inept procedures are killing us". She also visits the new Westende Jewellers building, which she notes was the first rebuild in the Christchurch central city but will come down as part of CERA's Transport Plan. Dalziel is shown socialising with members of the public and watching the Christchurch Wizard bless New Regent Street.

Research papers, Victoria University of Wellington

This topic was chosen in response to the devastation caused to Cathedral Square, Christchurch, New Zealand following earthquakes in 2010 and 2011. Working amongst the demolition bought to attention questions about how to re-conceive the square within the rebuilt city. In particular, it raised questions as to how a central square could be better integrated and experienced as a contemporary addition to Christchurch city. This thesis seeks to investigate the ways in which central squares can be better integrated with the contemporary city and how New Urbanist design principles can contribute toward this union. The research principally focuses on the physical and spatial integration of the square with the contemporary city. A drawing-based analysis of select precedent case studies helped to determine early on that overall integration of the contemporary square could be attributed to several interdependent criteria. The detailed studies are supplemented further with literature-based research that narrowed the criteria to five integrative properties. These are: identity, scale and proportion, use, connectivity and natural landscape. These were synthesised, in part, from the integrative New Urbanist movement and the emerging integrative side of the more contemporary Post Urbanist movement. The literature-based research revealed that a more inclusive approach toward New Urbanist and Post Urbanist design methodologies may also produce a more integrated and contemporary square. Three design case studies, using the redesign of Cathedral Square, were undertaken to test this hypothesis. The case studies found that overall, integration was reliant on a harmonious balance between the five integrative properties, concluding that squares can be better integrated with the contemporary city. Further testing of the third concept, which embraced an allied New Urbanist / Post Urbanist approach to design, found that New Urbanism was limited in its contribution toward the integration of the square.