Search

found 64 results

Images, eqnz.chch.2010

The center of the river has slumped and the two banks have moved about a meter closer together which caused this footbridge to be so twisted. There is a suggestion that this be left as a memorial to the earthquake.

Images, UC QuakeStudies

Photograph captioned by Fairfax, "Engineers from ECAN and other areas in New Zealand have been inspecting the Waimakariri River stop banks on the coast side of State Highway 1 after the September earthquake. Brian McIndoe, ECAN Waimakariri Area Engineer, inspects one of the cracks which is causing concern on the stop bank".

Images, UC QuakeStudies

Photograph captioned by Fairfax, "Engineers from ECAN and other areas in New Zealand have been inspecting the Waimakariri River stop banks on the coast side of State Highway 1 after the September earthquake. Brian McIndoe, ECAN Waimakariri Area Engineer, inspects one of the cracks which is causing concern on the stop bank".

Images, eqnz.chch.2010

The center of the river has slumped and the two banks have moved about a meter closer together which caused this footbridge to be so twisted. There is a suggestion that this be left as a memorial to the earthquake.