Urban Search and Rescue personnel escorting construction workers over a bridge on Colombo Street in the aftermath of the 22 February 2011 earthquake. The road and footpath have been severely warped by the earthquake.
Photograph captioned by Fairfax, "The new Christchurch Council building has suffered only cosmetic damage in the September 4th earthquake. Construction workers abseil down the side of the civic building checking for any damage".
Photograph captioned by Fairfax, "The new Christchurch Council building has suffered only cosmetic damage in the September 4th earthquake. Construction workers abseil down the side of the civic building checking for any damage".
Photograph captioned by Fairfax, "The new Christchurch Council building has suffered only cosmetic damage in the September 4th earthquake. Construction workers abseil down the side of the civic building checking for any damage".
Piles of rubble along Kilmore Street. A digger can be seen in the background as well as a construction worker in a hard hat and high-visibility vest. The rubble has been separated into different piles.
A construction worker using a saw to cut through a metal beam from the ruins of the Canterbury Television Building. Smoke is billowing from the ruins, which were still partly on fire when the photograph was taken.
Photograph captioned by Fairfax, "Christchurch Earthquake. Christchurch was rocked by a large aftershock shortly after 8am this morning. Construction workers on Gloucester Street stopped work after the aftershock which measured 5.1 on the Richter scale".
The purpose of this paper is to empirically investigate the effects of a major disaster on the management of human resources in the construction sector. It sets out to identify the construction skills challenges and the factors that affected skills availability following the 2010/2011 earthquakes in Christchurch. It is hoped that this study will provide insights for on-going reconstruction and future disaster response with respect to the problem of skills shortages. Design/methodology/approach A triangulation method was adopted. The quantitative method, namely, a questionnaire survey, was employed to provide a baseline description. Field observations and interviews were used as a follow-up to ascertain issues and potential shortages over time. Three focus groups in the form of research workshops were convened to gain further insight into the feedback and to investigate the validity and applicability of the research findings. Findings The earthquakes in Christchurch had compounded the pre-existing skills shortages in the country due to heightened demand from reconstruction. Skills shortages primarily existed in seismic assessment and design for land and structures, certain trades, project management and site supervision. The limited technical capability available nationally, shortage of temporary accommodation to house additional workers, time needed for trainees to become skilled workers, lack of information about reconstruction workloads and lack of operational capacity within construction organisations, were critical constraints to the resourcing of disaster recovery projects. Research limitations/implications The research findings contribute to the debate on skills issues in construction. The study provides evidence that contributes to an improved understanding of the industry’s skills vulnerability and emerging issues that would likely exist after a major disaster in a resource-limited country such as New Zealand. Practical implications From this research, decision makers and construction organisations can gain a clear direction for improving the construction capacity and capability for on-going reconstruction. Factors that affected the post-earthquake skills availability can be considered by decision makers and construction organisations in their workforce planning for future disaster events. The recommendations will assist them in addressing skills shortages for on-going reconstruction. Originality/value Although the study is country-specific, the findings show the nature and scale of skills challenges the construction industry is likely to face following a major disaster, and the potential issues that may compound skills shortages. It provides lessons for other disaster-prone countries where the resource pool is small and a large number of additional workers are needed to undertake reconstruction.
Workers seen through a gap between wooden pallets in GapFiller's Pallet Pavillion. The photographer comments, "Though it looks strange and Photoshopped this is a straight shot through pallets painted blue. The Pallet Pavilion is built on the site of the demolished Crowne Plaza Hotel. It was built by volunteers, mainly students and construction engineers over 6 weeks. Here students are being given health and safety instructions before helping out on completing the temporary structure".
One print on paper of an artwork titled "Build it on Jelly" featuring an image of a construction worker and steel beam in black ink standing on a molded jelly in orange ink, with the words "Build it on Jelly, By Order, Jelly City Council, Christchurch NZ".
Urban Search and Rescue personnel escorting construction workers down Colombo Street in the aftermath of the 22 February 2011 earthquake. Behind them a team of Fire Service and Urban Search and Rescue personnel can be seen using a crane to check the Forsyth Barr building for trapped people.
Urban Search and Rescue personnel escorting construction workers down Colombo Street in the aftermath of the 22 February 2011 earthquake. Behind them a team of Fire Service and Urban Search and Rescue personnel can be seen using a crane to check the Forsyth Barr building for trapped people.
A view looking south down Durham Street. Two fire engines are driving north, and a pair of construction workers are walking up the road. Behind them is the damaged Provincial Council Legislative Chambers. The building's walls and roof have collapsed, as has the scaffolding which was erected to repair it after the 4 September 2010 earthquake.
A video about members of the Irish rugby team touring the Christchurch central city Red Zone. The team is in Christchurch for a test match against the All Blacks at the new Christchurch Stadium. The video includes interviews with scrum coach Greg Feek and coach Declan Kidney. It also includes footage of Irish construction workers meeting the team in Cathedral Square.
A video of a tour through the Christchurch central city Red Zone. The video includes footage of Armagh Street, Madras Street, Latimer Square, St John's Anglican Church, Hereford Street, the Octagon Live restaurant, the Design and Arts building, the High Street mall, and the Grand Chancellor Hotel. It also includes footage of construction workers cutting up metal beams, and clearing rubble from a building on Manchester Street.
A photograph looking east down Gloucester Street from near the Manchester Street intersection. Members of the Wellington Emergency Management Office Emergency Response Team and construction workers are walking down the street. To their right is the new Press House building with many broken windows. In the foreground, the Coachman building has sustained earthquake damage to the façade. Wire fences have been placed around the building as a cordon.
A video of an interview with Julia Morison, a Christchurch-based artist, about her sculptures in a vacant site on the Christchurch central city. The artwork, titled 'Tree Houses for Swamp Dwellers', took over a year to make and will act as a centrepiece for the Scape Public Art festival, which begins on 27 September 2013. The sculpture was designed to provide a playground for children and a shady spot for workers on their lunch breaks. Morison also talks about how the sculpture was designed to be relocated and reconfigured so that it can be moved to a new location when construction begins on the vacant site.
METIRIA TUREI to the Minister for the Environment: Ki Te Minita mō Te Taiao: Ka tukua e ngā paerewa e whakaarohia akehia nei mō te pai ake o te wai i roto i te pūhera Wai Mā, te kaha kē atu, te iti kē iho rānei o te uru atu o te tūkinotanga ki roto i ō tātou awa wai, e ngā mea whakakapi? Translation: Do the proposed standards for water quality in the Clean Water package allow more pollution or less to enter our waterways than the ones they will replace? BRETT HUDSON to the Minister of Finance: How much is the Government committing to spend on infrastructure over the next 4 years? ANDREW LITTLE to the Prime Minister: Given his predecessor told the Pike River families, “I’m here to give you absolute reassurance we’re committed to getting the boys out, and nothing’s going to change that”, when, if ever, will he be announcing the re-entry of the drift? STUART SMITH to the Minister of Transport: What announcements has he made recently regarding the Government’s commitment to reinstate key transport links following the Kaikōura earthquake? JACINDA ARDERN to the Minister for Children: When was she first notified that the Ministry for Vulnerable Children Oranga Tamariki, or its predecessor CYF, were placing children and younger persons in a hotel or motel for short-term care without a supervisor, and what was her first action, if any? MELISSA LEE to the Minister of Health: Can he confirm that 55,000 care and support workers will share in the $2 billion pay equity settlement announced on 18 April 2017? GRANT ROBERTSON to the Minister of Finance: Does he agree with the Dominion Post editorial that his Government has “singularly failed to answer the pressures of Auckland”; if not, why does he think they would write this? ANDREW BAYLY to the Minister for Building and Construction: How do the latest reports on the level of building activity in Auckland and nationwide for the month, quarter, and year compare with 2016? Rt Hon WINSTON PETERS to the Prime Minister: Does he stand by all his statements; if so, how? PHIL TWYFORD to the Minister of Transport: Why has the completion of the $2.4 billion Western Ring Route been delayed, and when can Aucklanders expect the new motorway to be open? EUGENIE SAGE to the Minister of Conservation: Is it Government policy to increase the logging of native forests on West Coast conservation land? Dr MEGAN WOODS to the Minister supporting Greater Christchurch Regeneration: Does she agree that the first homes in the East Frame will be completed 5 months ahead of schedule? Questions to Members CLARE CURRAN to the Chairperson of the Commerce Committee: Does she intend to call for further submissions on the petition of Dame Fiona Kidman before it is reported back to the House, in light of the recently released footage shot inside the drift of the Pike River mine?