A photograph of seven students on a bridge they have constructed across the Avon River, outside the UCSA building. The photograph was taken in 2015 during the annual Civil Engineering Bridge Challenge event.
A photograph of six students on a bridge they have constructed across the Avon River, outside the UCSA building. The photograph was taken in 2015 during the annual Civil Engineering Bridge Challenge event.
A photograph of six students on a bridge they have constructed across the Avon River, outside the UCSA building. The photograph was taken in 2015 during the annual Civil Engineering Bridge Challenge event.
A photograph of five students on a bridge they have constructed across the Avon River, outside the UCSA building. The photograph was taken in 2015 during the annual Civil Engineering Bridge Challenge event.
A photograph of four students on a bridge they have constructed across the Avon River, outside the UCSA building. The photograph was taken in 2015 during the annual Civil Engineering Bridge Challenge event.
A photograph of a student walking on a bridge across the Avon River, outside the UCSA building. The photograph was taken in 2015 during the annual Civil Engineering Bridge Challenge event.
A photograph of seven students on a bridge they have constructed across the Avon River, outside the UCSA building. The photograph was taken in 2015 during the annual Civil Engineering Bridge Challenge event.
A photograph of eight students falling through a bridge they have constructed across the Avon River, outside the UCSA building. The photograph was taken in 2015 during the annual Civil Engineering Bridge Challenge event.
A photograph of two students walking on a bridge across the Avon River, outside the UCSA building. The photograph was taken in 2015 during the annual Civil Engineering Bridge Challenge event.
A photograph of a crowd of students sitting on the bank of the Avon River outside the UCSA building in 2015. The students are gathered to watch the annual Engineering Bridge Challenge event.
A photograph of a bridge being placed across the Avon River outside the UCSA building in 2015. A number of students will walk across the bridge as part of the annual Civil Engineering Bridge Challenge.
A photograph of eight students standing in the Avon River outside the UCSA building, having just fallen through a bridge they had constructed. The photograph was taken in 2015 during the annual Civil Engineering Bridge Challenge event.
A photograph of eight students standing in the Avon River outside the UCSA building, having just fallen through a bridge they had constructed. The photograph was taken in 2015 during the annual Civil Engineering Bridge Challenge event.
A Christchurch man, whose house was damaged in the earthquakes, has challenged his insurer's CEO to live in it if she truly believes it's repairable.
The Building Act 2004 now requires Territorial Authorities (TAs) to have in place a policy setting out how they intend making existing buildings that would be unable to withstand a moderate earthquake safe for their occupiers. Many of the resultant policies developed by TAs have put in place mandatory upgrade requirements that will force owners to expend large amounts of capital on seismic upgrading of their buildings. The challenge for the property owners and TAs alike is to make such development work economic or the result will be wide scale demolition of old buildings. This has serious implications for both heritage conservation and inner city revitalisation plans that are based on existing heritage buildings. This paper sets out the issues and challenges for the seismic upgrading of buildings in New Zealand and puts forward some potential solutions
The chairman of the Canterbury Earthquake Recovery Commission, Murray Sherwin, joins us for the morning in our Wellington studio.
The Minister for Earthquake Recovery, Gerry Brownlee, has been accused in the High Court in Christchurch of abusing his powers and doing deals which allowed councils and Christchurch Airport to get their own way over zoning decisions.
Hello everyone! Belated happy new year and welcome back. We’ve decided to begin the year by talking about problems (just to start on a positive note). Well, sort of. We’re participating in an international round-up of blog posts this month … Continue reading →
Presentation by Associate Professor Kate Van Heugten (Human Services and Social Work Department) on "Challenges and Rewards of Working in the Human Services in the Aftermath of the Canterbury Earthquakes 2010/2011".
This research provides an investigation into the impact on the North Island freight infrastructure, in the event of a disruption of the Ports of Auckland (POAL). This research is important to New Zealand, especially having experienced the Canterbury earthquake disaster in 2010/2011 and the current 2012 industrial action plaguing the POAL. New Zealand is a net exporter of a combination of manufactured high value goods, commodity products and raw materials. New Zealand’s main challenge lies in the fact of its geographical distances to major markets. Currently New Zealand handles approximately 2 million containers per annum, with a minimum of ~40% of those containers being shipped through POAL. It needs to be highlighted that POAL is classified as an import port in comparison to Port of Tauranga (POT) that has traditionally had an export focus. This last fact is of great importance, as in a case of a disruption of the POAL, any import consigned to the Auckland and northern region will need to be redirected through POT in a quick and efficient way to reach Auckland and the northern regions. This may mean a major impact on existing infrastructure and supply chain systems that are currently in place. This study is critical as an element of risk management, looking at how to mitigate the risk to the greater Auckland region. With the new Super City taking hold, the POAL is a fundamental link in the supply chain to the largest metropolitan area within New Zealand.
Slides from the presentation by Associate Professor Kate Van Heugten (Human Services and Social Work Department) on "Challenges and Rewards of Working in the Human Services in the Aftermath of the Canterbury Earthquakes 2010/2011".
A video of a presentation by Andrew King of GNS Science on "The Natural Hazards Research Platform and National Science Challenge". The presentation was delivered at the Learning from Lifeline Week and Planning Collaborations forum as part of the University of Canterbury's Lifeline Week.
A photograph described by University of Canterbury alumnus Mike Gibbs as follows: "Pete Martin serving Tequila to students on the grassed area outside the amphitheatre (on UCSA grounds) at the tequila challenge 2002 for the Guinness Book of Records. After a long day (even if it is at lunch time) students will drink anything that's free".
The 48hr Design Challenge, run by the Christchurch City Council and held at Lincoln University, provided an opportunity for Council to gain inspiration from the design and architecture industry, while testing the draft Central City Plan currently being developed. The Challenge was a response to the recent earthquakes in Christchurch and brought together local and international talent. A total of 15 teams took part in the Challenge, with seven people in each including engineers, planners, urban designers, architects and landscape architects, as well as one student on each team. The four sites within the Red Zone included the Cathedral Square and BNZ Building; 160 Gloucester Street; the Orion NZ Building at 203 Gloucester Street; and 90 Armagh Street, including the Avon River and Victoria Square. The fifth site, which sits outside the Red Zone, is the former Christchurch Women’s Hospital at 885 Colombo Street. This is team SoLA's entry for 160 Gloucester Street.
A photographs of volunteers preparing the site for the Gap Filler office.
A PDF copy of pages 174-175 of the book Christchurch: The Transitional City Pt IV. The pages document the transitional project 'Gap Filler Office'. Photos: Gap Filler
A photograph of children's play equipment on the site of the Gap Filler office. In the background, a mural reads, "The things which I have seen I now can see no more".
A photograph of builders preparing framing for Gap Filler's office.
A photograph of the empty site on Colombo Street where the Gap Filler office will be constructed.
Christchurch earthquake events have raised questions on the adequacy of performance-based provisions in the current national building code. At present, in the building code the performance objectives are expressed in terms of safety and health criteria that could affect building occupants. In general, under the high intensity Christchurch events, buildings performed well in terms of life-safety (with a few exceptions) and it proved that the design practices adopted for those buildings could meet the performance objectives set by the building code. However, the damage incurred in those buildings resulted in unacceptably high economic loss. It is timely and necessary to revisit the objectives towards building performance in the building code and to include provisions for reducing economic implications in addition to the current requirements. Based on the observed performance of some buildings, a few specific issues in the current design practices that could have contributed to extensive damage have been identified and recommended for further research leading towards improved performance of structures. In particular, efforts towards innovative design/construction solutions with low-damage concepts are encouraged. New Zealand has been one of the leading countries in developing many innovative technologies. However, such technically advanced research findings usually face challenges towards implementation. Some of the reasons include: (i) lack of policy requirements; (iii) absence of demonstrated performance of new innovations to convince stakeholders; and (iv) non-existence of design guidelines. Such barriers significantly affect implementation of low damage construction and possible strategies to overcome those issues are discussed in this paper.