An entry from Roz Johnson's blog for 3 June 2012 entitled, "Grubb Cottage Gets the Warm Fuzzies".
Digitally manipulated image of graffiti on a brick building on St Asaph Street. The graffiti depicts a sticking plaster over a broken section of the wall, with the words "I'll kiss it better". The photographer comments, "After the 22 February 2011 earthquake in Christchurch band aid plasters starting to appear in different parts of the city on damaged buildings. A year later most can still be seen. This one was once a whole plaster, but it has slowly broken up where it crossed the gap. The red bricks seen to symbolise the terrible wounds caused to the City and it's people".
Part of Mike Hewson's installation 'Homage To Lost Spaces' in the Cramner Courts building, a photograph of a young man working at a desk has been inserted into a gap in the building. The photographer comments, "Although Cranmer Courts are in ruins pictures have been inserted into the windows to make them look occupied".
A photograph looking south down Manchester Street. People are walking along the road looking at earthquake damage. The Octagon Live building and the Holiday Inn can be seen to the right.
Damage to a building on Colombo Street. Beside it is a sign that says 'Footpath closed Please use alternative route'. Ongoing demolition work and street cordons in Christchurch mean that gardens are left and becoming overgrown.
A view from the Cathedral Square tram stop towards Oxford Terrace. The Clarendon Towers building on the left has been damaged and its windows boarded up. A large crane can be seen in the background.
Summary of oral history interview with Rosemary Bloxham about her experiences of the Canterbury earthquakes.
The northern side of the Christ Church Cathedral with the cafe and store in the foreground. Shipping containers have been placed around the eastern side of the Cathedral to protect the road from falling debris. Wire fencing has also been placed around the building as a cordon. To the right, the damaged and party deconstructed tower can be seen with the missing spire which fell during the 22 February 2011 earthquake.
A digitally manipulated image of a broken window on Spicer House. The photographer comments, "One of the office blocks in Christchurch City, New Zealand. As the window has not been fixed I am presuming that this building will be slowly demolished at a later date".
A photograph looking east down Gloucester Street, towards the intersection of Manchester Street. On-lookers are surveying earthquake damage from behind the cordon. The Christchurch City Council parking building can be seen in the distance.
An entry from Jennifer Middendorf's blog for 19 March 2012 entitled, "Time to catch up".
A digitally manipulated image of 'Save Our Cathedral' ribbons hanging from a cordon fence near Latimer Square.
A digitally manipulated image of an excavator. The photographer comments, "This is a huge excavator in the Christchurch CBD. It is being used to clear away the enormous amount of rubble from the buildings being demolished. It seems that nearly all the big machinery from all other the world has been needed in the clean up of the earthquake damaged buildings and utilities".
A video about the Christchurch City Council housing complex on Conference Street in the Christchurch central city. The housing complex was unoccupied after the 22 February 2011 earthquake despite the housing shortage. Christchurch City Council said that the vacant units could not be lived in because of structural damage or damage to services. However, the building has been checked by structural engineers and many of the rooms have been deemed safe to occupy.
Martin Setchell, the organist, is shown playing a mouth organ made out of cardboard tubes. This is a comment on the controversy over the replacement of Christchurch Cathedral, which was severely damaged in the Canterbury earthquakes of 2010 and 2011, by a temporary building made out of cardboard tubing. Quantity: 1 digital cartoon(s).
During the Christchurch earthquake of February 2011, several midrise buildings of Reinforced Concrete Masonry (RCM) construction achieved performance levels in the range of life safety to near collapse levels. These buildings were subjected to seismic demands higher than the building code requirements of the time and higher than the current New Zealand Loadings Standard (NZS-1170.5:2004). Structural damage to these buildings has been documented and is currently being studied to establish lessons to be learned from their performance and how to incorporate these lessons into future RCM design and construction practices. This paper presents a case study of a six story RCM building deemed to have reached the near collapse performance level. The RCM walls on the 2nd floor failed due to toe crushing reducing the building’s lateral resistance in the east-west direction. A nonlinear dynamic analysis on a 3D model was conducted to simulate the development of the governing failure mechanism. Preliminary analysis results show that the damaged walls were initially under large compression forces from gravity loads which caused increase in their lateral strength and reduced their ductility. After toe crushing failure developed, axial instability of the model was prevented by a redistribution of gravity loads.
A digitally manipulated image of Michael Parekowhai's scuplture 'On First Looking into Chapman's Homer' on Madras Street. The photographer comments, "One of the two bulls on pianos by Michael Parekowhai called 'On First Looking into Chapman's Homer'. They have been placed on the site of a building that was demolished after earthquake damage.
The roof of this collapsed building on Atlas Lane has fallen almost intact on top of the rubble. The photographer comments, "Whenever I go past this place it reminds me of a sinking ship".
Warwick Isaacs is director of planning and transition for Civil Defence and as such has issued demolition orders for 128 buildings, 37 in the city. Gerry Brownlee has chosen the Government's 'demolition man' Warwick Isaacs to head the rebuild of central Christchurch. The buildings were damaged in the earthquakes of 2010 and 2011. Quantity: 1 digital cartoon(s).
A video of excavators demolishing the former railway station on Moorhouse Avenue. The building was only moderately damaged during the 22 February 2011 earthquake, but repair work was deemed too costly for the co-owner, Science Alive!.
As part of the ‘Project Masonry’ Recovery Project funded by the New Zealand Natural Hazards Research Platform, commencing in March 2011, an international team of researchers was deployed to document and interpret the observed earthquake damage to masonry buildings and to churches as a result of the 22nd February 2011 Christchurch earthquake. The study focused on investigating commonly encountered failure patterns and collapse mechanisms. A brief summary of activities undertaken is presented, detailing the observations that were made on the performance of and the deficiencies that contributed to the damage to approximately 650 inspected unreinforced clay brick masonry (URM) buildings, to 90 unreinforced stone masonry buildings, to 342 reinforced concrete masonry (RCM) buildings, to 112 churches in the Canterbury region, and to just under 1100 residential dwellings having external masonry veneer cladding. Also, details are provided of retrofit techniques that were implemented within relevant Christchurch URM buildings prior to the 22nd February earthquake. In addition to presenting a summary of Project Masonry, the broader research activity at the University of Auckland pertaining to the seismic assessment and improvement of unreinforced masonry buildings is outlined. The purpose of this outline is to provide an overview and bibliography of published literature and to communicate on-going research activity that has not yet been reported in a complete form. http://sesoc.org.nz/conference/programme.pdf
Summary of oral history interview with Belinda Grant about her experiences of the Canterbury earthquakes.
Summary of oral history interview with Coralie Winn about her experiences of the Canterbury earthquakes.
In the period between September 2010 and December 2011, Christchurch (New Zealand) and its surroundings were hit by a series of strong earthquakes including six significant events, all generated by local faults in proximity to the city: 4 September 2010 (Mw=7.1), 22 February 2011 (Mw=6.2), 13 June 2011 (Mw=5.3 and Mw=6.0) and 23 December 2011 (M=5.8 and (M=5.9) earthquakes. As shown in Figure 1, the causative faults of the earthquakes were very close to or within the city boundaries thus generating very strong ground motions and causing tremendous damage throughout the city. Christchurch is shown as a lighter colour area, and its Central Business District (CBD) is marked with a white square area in the figure. Note that the sequence of earthquakes started to the west of the city and then propagated to the south, south-east and east of the city through a set of separate but apparently interacting faults. Because of their strength and proximity to the city, the earthquakes caused tremendous physical damage and impacts on the people, natural and built environments of Christchurch. The 22 February 2011 earthquake was particularly devastating. The ground motions generated by this earthquake were intense and in many parts of Christchurch substantially above the ground motions used to design the buildings in Christchurch. The earthquake caused 182 fatalities, collapse of two multi-storey reinforced concrete buildings, collapse or partial collapse of many unreinforced masonry structures including the historic Christchurch Cathedral. The Central Business District (CBD) of Christchurch, which is the central heart of the city just east of Hagley Park, was practically lost with majority of its 3,000 buildings being damaged beyond repair. Widespread liquefaction in the suburbs of Christchurch, as well as rock falls and slope/cliff instabilities in the Port Hills affected tens of thousands of residential buildings and properties, and shattered the lifelines and infrastructure over approximately one third of the city area. The total economic loss caused by the 2010-2011 Christchurch earthquakes is currently estimated to be in the range between 25 and 30 billion NZ dollars (or 15% to 18% of New Zealand’s GDP). After each major earthquake, comprehensive field investigations and inspections were conducted to document the liquefaction-induced land damage, lateral spreading displacements and their impacts on buildings and infrastructure. In addition, the ground motions produced by the earthquakes were recorded by approximately 15 strong motion stations within (close to) the city boundaries providing and impressive wealth of data, records and observations of the performance of ground and various types of structures during this unusual sequence of strong local earthquakes affecting a city. This paper discusses the liquefaction in residential areas and focuses on its impacts on dwellings (residential houses) and potable water system in the Christchurch suburbs. The ground conditions of Christchurch including the depositional history of soils, their composition, age and groundwater regime are first discussed. Detailed liquefaction maps illustrating the extent and severity of liquefaction across Christchurch triggered by the sequence of earthquakes including multiple episodes of severe re-liquefaction are next presented. Characteristic liquefaction-induced damage to residential houses is then described focussing on the performance of typical house foundations in areas affected by liquefaction. Liquefaction impacts on the potable water system of Christchurch is also briefly summarized including correlation between the damage to the system, liquefaction severity, and the performance of different pipe materials. Finally, the characteristics of Christchurch liquefaction and its impacts on built environment are discussed in relation to the liquefaction-induced damage in Japan during the 11 March 2011 Great East Japan Earthquake.
A photograph of the north side of the ChristChurch Cathedral in Cathedral Square. The front of the building has been propped up with steel bracing but further earthquakes have caused more damage, leaving a gap between the bracing and the wall. The tower has been partially demolished, but the lower section is still visible. Wire fencing has been placed around the entire building. In the background, a crane is rising high above the square.
A photograph of the north side of the ChristChurch Cathedral in Cathedral Square. The front of the building has been propped up with steel bracing but further earthquakes have caused more damage, leaving a gap between the bracing and the wall. The tower has been partially demolished, but the lower section is still visible. Wire fencing has been placed around the entire building. In the background, a crane is rising high above the square.
A photograph of the north side of the ChristChurch Cathedral in Cathedral Square. The front of the building has been propped up with steel bracing but further earthquakes have caused more damage, leaving a gap between the bracing and the wall. The tower has been partially demolished, but the lower section is still visible. Wire fencing has been placed around the entire building. In the background, a crane is rising high above the square.
The Catholic Cathedral of the Blessed Sacrament is a category 1 listed heritage building constructed largely of unreinforced stone masonry, and was significantly damaged in the recent Canterbury earthquakes. The building experienced ground shaking in excess of its capacity leading to block failures and partial collapse of parts of the building, which left the building standing but still posing a significant hazard. In this paper we discuss the approach to securing the building, and the interaction of the structural, heritage and safety demands involved in a dynamic seismic risk environment. We briefly cover the types of failures observed and the behaviour of the structure, and investigate the performance of both strengthened and un-strengthened parts of the building. Seismic strengthening options are investigated at a conceptual level. We draw conclusions as to how the building performed in the earthquakes, comment on the effectiveness of the strengthening and securing work and discuss the potential seismic strengthening methods.
A panoramic photograph taken at the front of Christ Church Cathedral. The front of the cathedral has steel bracing against it to limit further damage. The upper part of the front wall has crumbled completely, exposing the inside space. The Chalice sculpture is to the right and the BNZ building can be seen in the background.
A video of a press conference with Bishop Victoria Matthews in the Botanic Gardens about the plans for the earthquake-damaged ChristChurch Cathedral. Matthews announces that the cathedral will be deconstructed, allowing the safe retrieval of taonga and heritage items within the building.