Search

found 658 results

Images, UC QuakeStudies

The Wizard of Christchurch, who has launched a campaign to save the Christ Church Cathedral from demolition. Taken on a day when a walkway was opened up between Re:Start Mall and Cathedral Square to allow temporary public access.

Images, UC QuakeStudies

The Wizard of Christchurch, who has launched a campaign to save the Christ Church Cathedral from demolition. Taken on a day when a walkway was opened up between Re:Start Mall and Cathedral Square to allow temporary public access.

Images, UC QuakeStudies

A view of the Cathedral and the plinth where the statue of John Robert Godley once stood. Taken on a day when a walkway was opened up between Re:Start Mall and Cathedral Square to allow temporary public access.

Images, UC QuakeStudies

A view of the Cathedral and the plinth where the statue of John Robert Godley once stood. Taken on a day when a walkway was opened up between Re:Start Mall and Cathedral Square to allow temporary public access.

Images, UC QuakeStudies

Damage to the north side of ChristChurch Cathedral. The damaged windows have been boarded up and weeds can be seen growing in the lawn. A walkway from Gloucester Street to the Square was opened up for a few days to allow the public a closer look at the cathedral.

Images, UC QuakeStudies

A sign on the cordon fence near Victoria Square gives the opening hours for public access to the recently re-opened square. In the background, the Cathedral is visible, seen through the gap where a building has been demolished.

Images, UC QuakeStudies

Photograph captioned by BeckerFraserPhotos, "The machinery used in the demolitions keeps getting more sophisticated as the taller buildings are dealt with. This is the large crane put in place to work on the deconstruction and demolition of the BNZ Building".

Images, UC QuakeStudies

Photograph captioned by BeckerFraserPhotos, "The machinery used in the demolitions keeps getting more sophisticated as the taller buildings are dealt with. This is the large crane put in place to work on the deconstruction and demolition of the BNZ Building".