
None
This report examines and compares case studies of labour market policy responses in APEC economies to natural disasters. It first reviews the policies and practice within APEC economies and internationally in managing the labour market effects of natural disasters. By using comparative case studies, the report then compares recent disaster events in the Asia-Pacific region, including: - the June 2013 Southern Alberta floods in Canada; - the 2010 and 2011 Queensland floods in Australia; - the 2010 and 2011 Canterbury earthquakes in New Zealand; - the 2011 Great East Japan Earthquake and Tsunami in Japan; and - the 2008 Wenchuan earthquake in China.
A video of a presentation by Dr Phil Schroeder, Managing Director of Rolleston Central Health, during the second plenary of the 2016 People in Disasters Conference. The presentation is titled, "Canterbury Primary Care Response to Earthquakes in 2010/2011".
A pdf copy of the third introductory panel of Guy Frederick's 'The Space Between Words' exhibition. The panel includes discussion on how Frederick and others in Canterbury responded to the 2010 and 2011 Canterbury earthquakes.
This paper provides a comparison between the strong ground motions observed in the Christchurch central business district in the 4 September 2010 Mw7.1 Darfield, and 22 February 2011 Mw6.3 Christchurch earthquakes with those observed in Tokyo during the 11 March 2011 Mw9.0 Tohoku earthquake. Despite Tokyo being located approximately 110km from the nearest part of the causative rupture, the ground motions observed from the Tohoku earthquake were strong enough to cause structural damage in Tokyo and also significant liquefaction to loose reclaimed soils in Tokyo bay. Comparisons include the strong motion time histories, response spectra, significant durations and arias intensity. The implications for large earthquakes in New Zealand are also briefly discussed.
The sequence of earthquakes that has affected Christchurch and Canterbury since September 2010 has caused damage to a great number of buildings of all construction types. Following post-event damage surveys performed between April 2011 and June 2011, the damage suffered by unreinforced stone masonry buildings is reported and different types of observed failures are described. A detailed technical description of the most prevalently observed failure mechanisms is provided, with reference to recognised failure modes for unreinforced masonry structures. The observed performance of existing seismic retrofit interventions is also provided, as an understanding of the seismic response of these interventions is of fundamental importance for assessing the vulnerability of similar strengthening techniques when applied to unreinforced stone masonry structures.
Martin Setchell, the organist, is shown playing a mouth organ made out of cardboard tubes. This is a comment on the controversy over the replacement of Christchurch Cathedral, which was severely damaged in the Canterbury earthquakes of 2010 and 2011, by a temporary building made out of cardboard tubing. Quantity: 1 digital cartoon(s).
None
A woman sits reading a newspaper with reports about the Japanese earthquake and the latest news on Christchurch post-earthquake. Her husband has just put a Jerry Lee Lewis record on the turntable and the song 'Whole lotta shakin' goin' on' is playing; he says Didn't I always say this guy was ahead of his time?' Context - The Christchurch earthquakes of September 4 2010 and February 22 2011 as well as the Japanese earthquake and tsunami of 11 March 2011. Quantity: 1 digital cartoon(s).
A sticker produced by SPCA Canterbury for residents to stick on their doors, indicating that there is an animal inside the property. This was produced after the 2010 and 2011 Canterbury earthquakes to help emergency personnel determine whether an animal is inside the building.
In the early morning of 4th September 2010 the region of Canterbury, New Zealand, was subjected to a magnitude 7.1 earthquake. The epicentre was located near the town of Darfield, 40 km west of the city of Christchurch. This was the country’s most damaging earthquake since the 1931 Hawke’s Bay earthquake (GeoNet, 2010). Since 4th September 2010 the region has been subjected to thousands of aftershocks, including several more damaging events such as a magnitude 6.3 aftershock on 22nd February 2011. Although of a smaller magnitude, the earthquake on 22nd February produced peak ground accelerations in the Christchurch region three times greater than the 4th September earthquake and in some cases shaking intensities greater than twice the design level (GeoNet, 2011; IPENZ, 2011). While in September 2010 most earthquake shaking damage was limited to unreinforced masonry (URM) buildings, in February all types of buildings sustained damage. Temporary shoring and strengthening techniques applied to buildings following the Darfield earthquake were tested in February 2011. In addition, two large aftershocks occurred on 13th June 2011 (magnitudes 5.7 and 6.2), further damaging many already weakened structures. The damage to unreinforced and retrofitted clay brick masonry buildings in the 4th September 2010 Darfield earthquake has already been reported by Ingham and Griffith (2011) and Dizhur et al. (2010b). A brief review of damage from the 22nd February 2011 earthquake is presented here
A photograph of street art on a wall along Oxford Street in Lyttelton. The street art depicts buildings that were lost in Lyttelton after the 2010 and 2011 Canterbury earthquakes.
A photograph of street art on a wall along Oxford Street in Lyttelton. The street art depicts buildings that were lost in Lyttelton after the 2010 and 2011 Canterbury earthquakes.
A photograph of street art on a wall along Oxford Street in Lyttelton. The street art depicts buildings that were lost in Lyttelton after the 2010 and 2011 Canterbury earthquakes.
A photograph of street art on a wall along Oxford Street in Lyttelton. The street art depicts buildings that were lost in Lyttelton after the 2010 and 2011 Canterbury earthquakes.
A photograph of street art on a wall along Oxford Street in Lyttelton. The street art depicts buildings that were lost in Lyttelton after the 2010 and 2011 Canterbury earthquakes.
A photograph of street art on a wall along Oxford Street in Lyttelton. The street art depicts buildings that were lost in Lyttelton after the 2010 and 2011 Canterbury earthquakes.
None
Text reads 'Did you put the cat out and lock and back door?'. Shows car parked in Christchurch City at night. Context: People have been sleeping in their cars due to housing shortage created by Canterbury earthquakes of 2010 and 2011 (Stuff 29 March 2012) Quantity: 1 digital cartoon(s).
A truck carries a house to a new position and the family in the house wonder if they 'can stay on the truck permanently'. Context - Continuing housing problems in Christchurch following the earthquakes of 4 September 2010 and February 22 and June 13 2011. Many aftershocks are still happening and the ground is unstable in many places. Quantity: 1 digital cartoon(s).
None
The cartoon is drawn as a game of 'Quakeopoly' in which earthquakes, aftershocks, assessment waits, stress etc. allow one to move from one square to the next but players are always forced backwards and can never win. Context - The Canterbury earthquakes of 4 September 2010 and 22 February 2011 and the continuing aftershocks. Quantity: 1 digital cartoon(s).
"Open Theatre" - The Odeon Built in 1883 and known as the Tuam Street Hall or Theatre and was New Zealand's oldest masonry, purpose built theatre. In 1930, it became the St. James Theatre, It became The Odeon Movie Theatre in 1960. Demolition started in September 2012 after the Christchurch earthquakes of 2010/2011 but seems to have stopped!?
Text at the top of the cartoon reads 'NZ city strengthening?' A whole city enclosed in a glass dome and balanced on huge springs intended to make it earthquake resistant rocks as another aftershock hits. Context - Two earthquakes and hundreds of aftershocks have hit Christchurch, the first on 4 September 2010 and a second more devastating one on 22 February 2011. There has been great emphasis on making heritage buildings that are rebuilt and all new buildings earthquake resistant. The example in the cartoon is perhaps a Springs-with-damper base isolator. Quantity: 1 digital cartoon(s).
Christchurch's CBD as seen from the Cashmere hills, south of the city. Much of the CBD is still cordoned off and without power (as you should be able to spot) as a result of the damage caused by February's deadly earthquake.
Following the 2010/2011 Canterbury earthquakes a detailed campaign of door to door assessments was conducted in a variety of areas of Christchurch to establish the earthquake performance of residential dwellings having masonry veneer as an external cladding attached to a lightweight timber framing system. Specifically, care was taken to include regions of Christchurch which experienced different levels of earthquake shaking in order to allow comparison between the performance of different systems and different shaking intensities. At the time of the inspections the buildings in the Christchurch region had been repeatedly subjected to large earthquakes, presenting an opportunity for insight into the seismic performance of masonry veneer cladding. In total just under 1100 residential dwellings were inspected throughout the wider Christchurch area, of which 24% were constructed using the older nail-on veneer tie system (prior to 1996) and 76% were constructed using screw fixed ties to comply with the new 1996 standards revision (post-1996), with 30% of all inspected houses being of two storey construction. Of the inspected dwellings 27% had some evidence of liquefaction, ground settlement or lateral spreading. Data such as damage level, damage type, crack widths, level of repair required and other parameters were collected during the survey. A description of the data collection processes and a snapshot of the analysis results are presented within. http://15ibmac.com/home/
Two men chat over the fence about the state of their houses after the 4th September earthquake in Christchurch. One of them is complaining about the slow pace of reconstruction of houses after the magnitude 7.1 earthquake on 4 September 2010; the second man thinks they are doing their best. Context - Frustration over the slow rate of processing insurance applications and building inspections after the magnitude 7.1 earthquake on 4 September 2010 which although it resulted in a lot of damage, no-one died. In the cartoon the man's red sticker (meaning the house is uninhabitable) has faded to green after being put on the house after the September earthquake. Three days after this cartoon was published the much more disastrous earthquake of the 22nd February struck and many people died. Quantity: 1 digital cartoon(s).
The cartoon shows stenciled text in black and white that reads 'GRIEF THE PRICE WE PAY FOR LOVE'. Context - The earliest stages of the rebuilding of Christchurch after the earthquakes of 4 September 2010 and 22 February 2011. Quantity: 1 digital cartoon(s).
The cartoon depicts a little plant with two tiny leaves; text reads 'THE GARDEN CITY'. A second version includes the words 'Begins to grow again'. Context - The earliest stages of the rebuilding of Christchurch after the earthquakes of 4 September 2010 and 22 February 2011. Quantity: 2 digital cartoon(s).
The 2010/2011 Canterbury earthquakes have provided a unique opportunity to investigate the seismic performance of both traditional and modern buildings constructed in New Zealand. It is critical that the observed performance is examined and compared against the expected levels of performance that are outlined by the Building Code and Design Standards. In particular, in recent years there has been a significant amount of research into the seismic behaviour of precast concrete floor systems and the robustness of the support connections as a building deforms during an earthquake. An investigation of precast concrete floor systems in Christchurch has been undertaken to assess both the performance of traditional and current design practice. The observed performance for each type of precast floor unit was collated from a number of post-earthquake recognisance activities and compared against the expected performance determined for previous experimental testing and analysis. Possible reasons for both the observed damage, and in some cases the lack of damage, were identified. This critical review of precast concrete floor systems will assist in determining the success of current design practice as well as identify any areas that require further research and/or changes to design standards.