Prime Minister John Key preparing for a photograph with Al Dwyer, the leader of the USAID Disaster Assistance Response Team (DART), and members of DART, outside the US headquarters in Latimer Square. Latimer Square was set up as a temporary headquarters for emergency managements personnel after the 22 February 2011 earthquake.
Prime Minister John Key talking to Al Dwyer, and members of the USAID Disaster Assistance Response Team (DART) outside the US headquarters in Latimer Square. John Key is visiting to thank DART for their efforts in the aftermath of the 22 February 2011 earthquake.
A photograph of members of the Wellington Emergency Management Office Emergency Response Team examining an earthquake-damaged building on Acton Street. The closest section of the outer wall has collapsed, and the bricks and other rubble have fallen onto the pavement in front. A boat which was being stored inside has toppled over and is now sticking out of the building.
Deputy Administrator for Protection and National Preparedness at the Federal Emergency Management Agency, Tim Manning, briefing members of the Disaster Assistance Response Team (DART) upon their arrival in Christchurch to assist with search and rescue efforts.
A press release from the United States Embassy New Zealand about the USAID Disaster Assistance Response Team gifting their New Zealand counterparts around $600,000 worth of sophisticated detection and rescue equipment after the 22 February 2011 earthquake.
Deputy Administrator for Protection and National Preparedness at the Federal Emergency Management Agency, Tim Manning, briefing members of the Disaster Assistance Response Team (DART) upon their arrival in Christchurch to assist with search and rescue efforts.
Prime Minister John Key talking to Al Dwyer, the leader of the Disaster Assistance Response Team (DART), outside the US headquarters in Latimer Square. John Key is visiting to thank DART for their efforts in the aftermath of the 22 February 2011 earthquake.
A photograph of members of the Wellington Emergency Management Office Emergency Response Team examining an earthquake-damaged building on Acton Street. The closest section of the outer wall has collapsed, and the bricks and other rubble have fallen onto the pavement in front. A boat which was being stored inside has toppled over and is now sticking out of the building.
A story submitted by Sue Hamer to the QuakeStories website.
A pdf transcript of Rosie Belton's second earthquake story, captured by the UC QuakeBox Take 2 project. Interviewer: Laura Moir. Transcriber: Josie Hepburn.
A photograph of members of the Wellington Emergency Management Office Emergency Response Team working on the corner of Tuam and High Streets. In the background a large section of a building has collapsed and the bricks and other rubble have spilled onto the road. Wire fencing has been placed around the building as a cordon.
A photograph of members of the Clandeboye Emergency Response Team and the Red Cross working on High Street near the intersection of Manchester Street. A digger is parked on the street in front of the workers. Behind the digger is a large pile of rubble from the ANZ Bank building.
A photograph of members of the Wellington Emergency Management Office Emergency Response Team examining an earthquake-damaged building on Acton Street. The closest section of the outer wall has collapsed, and the bricks and other rubble have fallen onto the pavement in front. A boat which was being stored inside has toppled over and is now sticking out of the building.
A photograph of members of the Wellington Emergency Management Office Emergency Response Team examining an earthquake-damaged building on Acton Street. The closest section of the outer wall has collapsed, and the bricks and other rubble have fallen onto the pavement in front. A boat which was being stored inside has toppled over and is now sticking out of the building.
A photograph of members of Massey University's Veterinary Emergency Response Team (VERT) working in the central city red zone after the 22 February 2011 earthquake. VERT travelled to Christchurch after the 22 February 2011 earthquake in order to assist with caring for animals. Each member is wearing a hard hat, face masks, and a head lamp.
A photograph of a map used by the Wellington Emergency Management Office Emergency Response Team. The block of buildings between Montreal, Acton, St Asaph, and Antigua Streets has been outlined in red. Halkett Street has also been coloured in red. Various buildings around these areas have been highlighted in orange and blue.
A photograph of members of the Wellington Emergency Management Office Emergency Response Team walking down Gloucester Street towards Latimer Square. To the right, shipping containers have been stacked beside the square. A cordon of wire fences and road cones have also been used to cordon off the street in the distance.
A photograph of a map used by the Wellington Emergency Management Office Emergency Response Team. The block of buildings between Montreal, Acton, St Asaph, and Antigua Streets has been outlined in red. Halkett Street has also been coloured in red. Various buildings around these areas have been highlighted in orange and blue.
A photograph of the earthquake damage to the Edward Gibbon building on Madras Street. Sections of the top storey have collapsed and the bricks have spilled onto the road in front, damaging the awning and smashing several cars. In the foreground members of the Wellington Emergency Management Office Emergency Response Team are standing on the road.
Prime Minister John Key talking to Al Dwyer, and members of the USAID Disaster Assistance Response Team (DART) outside the US headquarters in Latimer Square. John Key is visiting to thank DART for their efforts in the aftermath of the 22 February 2011 earthquake.
Prime Minister John Key talking to Al Dwyer, and members of the USAID Disaster Assistance Response Team (DART) outside the US headquarters in Latimer Square. John Key is visiting to thank DART for their efforts in the aftermath of the 22 February 2011 earthquake.
Summary of oral history interview with Leanne Curtis about her experiences of the Canterbury earthquakes.
A story submitted by Jennifer to the QuakeStories website.
An entry from Ruth Gardner's blog for 15 January 2013 entitled, "Golf in the Gap".
An entry from Ruth Gardner's blog for 10 April 2011 entitled, "Day 48 - Foraging and Fences".
A story submitted by Michael to the QuakeStories website.
A photograph of two residents standing in front of an earthquake-damaged house in Christchurch. In the background a member of the Wellington Emergency Management Office is standing on the doorstep.
A poster created by Empowered Christchurch to advertise their submission to the CERA Draft Transition Recovery Plan on social media.The poster reads, "Submission. CERA Draft Transition Recovery Plan. After nearly five years of 'Emergency Response' where sustainability has been sacrificed in the interests of speed, we can assume that this phase is now behind us. We see no reason why this period should be extended until April 2016. Lessons must be learned from the past. It is time to move into the 'Restoration Phase'. Once seismic and building standards are corrected, and risks are notified, mapped and accepted, sustainability will be ensures. We need a city that is driven by the people that live in it, and enabled by a bureaucracy that accepts and mitigates risks, rather than transferring them to the most vulnerable residents. We support option 3+."
A photograph of members of the Wellington Emergency Management Office in a van. Out the window is an earthquake-damaged building.
An entry from Deb Robertson's blog for 4 January 2013 entitled, "A quilt for James in the Pallet Pavilion...".