Search

found 1820 results

Audio, Radio New Zealand

Christchurch has a big bill to contend with, if it still wants the multi-use stadium that's been in the works since the earthquakes 11 years ago. The problem-plagued project has blown out another $150 million, meaning it's going to cost $680 million and counting. The finish date's been pushed out too - to April 2026. Christchurch City Council's punting the hefty decision making back to the ratepayers. The options - increase the budget, scale back the project, or halt work altogether. Tessa Guest reports, and Crusaders CEO Colin Mansbridge talks to Lisa Owen.

Images, UC QuakeStudies

A photograph of a sign in the window of the Diabetes Centre on Hagley Avenue. The sign reads, "The Diabetes Centre is open. There are currently some earthquake repairs going on inside the building; however the building is safe to enter. Unfortunately the lift is out of action. Here are some pictures of what the building looks like inside: the lift is out of action until further notice; the gib board in the stairwell is being replaced; some ceiling panels are being replaced; our friendly administration staff are happy to assist where possible".

Images, UC QuakeStudies

A sewage pumping station on Avonside Drive has been lifted out of the ground by liquefaction. In the background, the damaged Snell Place footbridge over the Avon River is closed off with cordon fencing. The photographer comments, "A Sunday afternoon ride to New Brighton, then back via Aranui, Wainoni, Dallington, and Richmond. Not a cheerful experience. Dallington footbridge. The two pieces of this foot bridge have moved towards each other, so the bridge has developed quite a peak. The sewage pumping station has been heaved out of the ground by hydraulic pressure during quakes".