Photograph captioned by Fairfax, "St John's Church in Hororata undergoes repairs to its tower after it was damaged in the September earthquake".
Photograph captioned by Fairfax, "St John's Church in Hororata undergoes repairs to its tower after it was damaged in the September earthquake".
Photograph captioned by Fairfax, "St John's Church in Hororata undergoes repairs to its tower after it was damaged in the September earthquake".
Photograph captioned by Fairfax, "St John's Church in Hororata undergoes repairs to its tower after it was damaged in the September earthquake".
Photograph captioned by Fairfax, "St John's Church in Hororata undergoes repairs to its tower after it was damaged in the September earthquake".
Canterbury earthquake victims with the most damaged homes could have to wait more than two and half years for their houses to be fixed - but one owner says her problems are nothing compared to the misery of the Pike River mine disaster.
A PDF copy of the Selwyn Times community newspaper, published on Tuesday 14 September 2010.
A video about the demolition of buildings on Victoria Street. The video includes footage of an excavator demolishing the Daily Bagel building, and an interview with Paddy Snowden from City Salvage about his work after the 4 September 2010 earthquake. It also includes an interview with Api Agsorn-Worn, owner of Victoria Thai Foods on Victoria Street, about the status of her building which she acquired six months ago.
Nearly two weeks after the 7.1 earthquake, and a week after demolition started, this is the end of The Valley Inn in Heathcote.
Some Christchurch residents fear there's a risk to the region's history if headstones damaged by September's 7.1 magnitude earthquake are not repaired.
Photograph captioned by Fairfax, "Workers from Calcon repair burst water pipes at the corner of Avonside Drive and Linwood Avenue after Saturday's earthquake".
Photograph captioned by Fairfax, "Workers from Calcon repair burst water pipes at the corner of Avonside Drive and Linwood Avenue after Saturday's earthquake".
Photograph captioned by Fairfax, "Workers from Calcon repair burst water pipes at the corner of Avonside Drive and Linwood Avenue after Saturday's earthquake".
Photograph captioned by Fairfax, "Workers from Calcon repair burst water pipes at the corner of Avonside Drive and Linwood Avenue after Saturday's earthquake".
The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.
Repairs in progress on this High Street shop; aftermath of the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.
The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.
The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.
The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.
The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.
The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.
The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.
A police officer and soldier talk with a demolition contractor on Victoria Street. Tape has been placed across the street to create a temporary cordon.
Photograph captioned by Fairfax, "Earthquake in Christchurch. Quillan Dextar (5) rides past the demolition of shops on the corner of Edgeware Road and Barbadoes Street".
Photograph captioned by Fairfax, "Earthquake in Christchurch. Quillan Dextar (5) rides past the demolition of shops on the corner of Edgeware Road and Barbados Street".
A goods train stopped on the track beside SH71 near Rangiora. Trains were unable to run until buckled tracks were inspected and repaired.
The owners of more than three-thousand properties damaged by the Canterbury earthquake have been told the repair job could take nearly three years.
Fletcher Construction has won the largest building contract in New Zealand history to repair half of the Canterbury homes damaged in last month's earthquake.
A goods train stopped on the track beside SH71 near Rangiora. Trains were unable to run until buckled tracks were inspected and repaired.
A goods train stopped on the track beside SH71 near Rangiora. Trains were unable to run until buckled tracks were inspected and repaired.